Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 1 of 5  Not logged in ELOG logo
ID Date Author Project Subjectdown Run Number Events StartTime EndTime Data
  45   Fri Oct 7 18:28:53 2011 Christian Irmlercommonrun schedule    Unknown
Attachment 1: run_schedule.pdf
Attachment 2: run_schedule.xlsx
  70   Thu Oct 13 13:08:38 2011 Thomas Bergauercommonend of success    Unknown
  50   Sat Oct 8 14:33:25 2011 Thomas BergauerHPKbaby_stdrun016250k08.10.2011 14:31:40 Crap

falsches config file (single statt multi6)

 

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=7.6uA;  Istart_N=0.42
std. I2C settings

  51   Sat Oct 8 16:35:04 2011 Thomas BergauerHPKbaby_stdrun017 08.10.2011 16:26:10 Crap

wrong timing

 

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=7.6uA;  Istart_N=0.42
std. I2C settings

  52   Sat Oct 8 16:45:14 2011 Thomas BergauerHPKbaby_stdrun01815000008.10.2011 16:44:1308.10.2011 19:33:33Good

no cooling
beam on; xy table position x=322  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings, now with correct timing

  53   Sat Oct 8 20:33:58 2011 Karl-Heinz HoffmannHPKbaby_stdrun01915000008.10.2011 20:22:4508.10.2011 23:19:23Good

no cooling
beam on; xy table position x=333  y=80
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

  54   Sat Oct 8 23:27:44 2011 Karl-Heinz HoffmannHPKbaby_stdrun02038200008.10.2011 23:24:1609.10.2011 09:24:20Good

no cooling
beam on; xy table position x=327,5  y=65
HV=200V Istart_PY=8.2uA;  Istart_N=0.45uA
std. I2C settings

  55   Sun Oct 9 10:05:34 2011 Markus FriedlHPKbaby_stdcal0108380008.10.2011 13:36:2508.10.2011 13:54:07Good

HV=+-40V,
no cooling
beam off; xy table position x=  y=
HV= Istart=uA;
std. I2C settings
 

  56   Sun Oct 9 10:13:11 2011 Karl-Heinz HoffmannHPKbaby_addcal0118380009.10.2011 10:05:01 Good

no cooling
beam on; xy table position x=  y=
HV=200V Istart_P=1.5uA;  Istart_N=0.22uA
std. I2C settings

  57   Sun Oct 9 11:00:33 2011 Karl-Heinz HoffmannHPKbaby_addrun02115000009.10.2011 10:56:4709.10.2011 12:47:23Good

no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
std. I2C settings

  60   Sun Oct 9 13:12:32 2011 Karl-Heinz HoffmannHPKbaby_addrun022670k09.10.2011 13:09:3210.10.2011 00:48:16Good

no cooling
beam on; xy table position x=330  y=64
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
std. I2C settings

  61   Mon Oct 10 00:50:23 2011 Christian IrmlerHPKbaby_addrun023680k10.10.2011 00:51:2610.10.2011 09:15:35Good

no cooling
beam on; xy table position x=330  y=74
HV=200V Istart_PY=1,9uA;  Istart_N=0.27uA
std. I2C settings

same as run021, but taking more events

  21   Mon Oct 3 20:30:14 2011 Thomas BergauercommonXY Tisch     

Grosser (DESY) Tisch:  x = -342.0    y = 343.0  (Einheiten unbekannt, möglicherweise mm)

Raten-Scan siehe gescannter Zettel im Attachment.

 

erster Wert: X, also horizontal (positive Zahlen: Saleve side = Restaurant Nr. 3)

zweiter Wert: Z, also Höhe (positive Zahlen nach unten)

Micron DUT: X:324, Z:103 [Einheiten in mm]

 

configuration: IP-Address 192.168.0.13; 2 Achsen

Attachment 1: xy-tisch-control.JPG
xy-tisch-control.JPG
Attachment 2: desy_xy_table.jpg
desy_xy_table.jpg
  36   Wed Oct 5 19:33:40 2011 Markus FriedlcommonTrigger condition  4.10.2011 15:00  

Changed trigger such that off-spill scintillator triggers are vetoed.

Inserted Flip-Flop which is set by begin of spill (WWE) and reset by end of spill signal (EE). Out-bar is put in coincidence with the scintillator trigger.

This also changes the timing, which was unfortunately not detected until 30 hours later. Thus, runs 4-7 have bad (wrong) timing -> UNUSABLE

Attachment 1: trigger_path_with_veto.png
trigger_path_with_veto.png
  71   Thu Oct 20 11:49:14 2011 Markus FriedlcommonScintillator dimensions    Good
Attachment 1: bhihagag.jpg
bhihagag.jpg
Attachment 2: bdgaegba.jpg
bdgaegba.jpg
  32   Wed Oct 5 12:09:00 2011 Christian IrmlerBELLEOrigami stack cooled wrong I2C settingscal0058380005.10.2011 12:04:5005.10.2011 12:37:11Crap

This calibration file can not be used, due to wrong I2C settings!

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.77 bar
mass flow = 0.9 g/s

I=22.45µA

longterm files (same files used for cal005 and run006):
It-pos-0510111122.txt 
It-neg-0510111122.txt  

currents and temperatures:
05.10.2011  12:05:53  event=2883  rate=37events/s temp/curr=35.0/-05.6 35.0/-06.3 35.0/-06.9 34.2/001.9 34.1/002.5 34.1/022.6
05.10.2011  12:36:53  event=83350  rate=48events/s temp/curr=34.4/-05.5 34.5/-06.1 34.5/-06.9 33.9/001.7 33.9/002.4 33.9/022.5
 

  33   Wed Oct 5 13:00:41 2011 Christian IrmlerBELLEOrigami stack cooled run0062469205.10.2011 12:55:5305.10.2011 14:05:49Crap

Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.77 bar
mass flow = 0.9 g/s

I=22.25µA

longterm files (same files used for cal005 and run006):
It-pos-0510111122.txt 
It-neg-0510111122.txt  

currents and temperatures:
05.10.2011  12:56:54  event=985  rate=0events/s temp/curr=35.0/-05.5 35.0/-06.1 34.9/-06.9 34.2/001.7 34.3/002.4 34.3/022.3
 

  37   Wed Oct 5 19:57:15 2011 Christian IrmlerBELLEOrigami stack cooled run0071784505.10.2011 18:27:5105.10.2011 19:31:43Crap

Run stopped after 17845 events, because of bad trigger timing

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.77 bar
mass flow = 0.9 g/s

I=20µA

longterm files (same files used for cal005 and run006):
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  19:30:51  event=17469  rate=0events/s temp/curr=35.6/-05.6 35.6/-06.1 35.6/-07.1 35.1/001.9 35.1/002.4 35.1/020.9
 

  34   Wed Oct 5 16:43:00 2011 Christian IrmlerBELLEOrigami stack cooledcal0068380005.10.2011 16:40:1805.10.2011 17:12:27Good

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.2 bar
mass flow = 0.9 g/s

I=21.8µA

longterm files (same files used for cal005 and run006):
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  16:41:21  event=2850  rate=50events/s temp/curr=35.4/-05.8 35.3/-06.3 35.4/-07.2 34.9/002.0 34.9/002.5 34.9/021.7
05.10.2011  17:11:20  event=81237  rate=37events/s temp/curr=35.1/-05.8 35.1/-06.1 35.0/-07.1 34.5/002.0 34.5/002.5 34.5/021.4
 

  35   Wed Oct 5 17:54:09 2011 Christian IrmlerBELLEOrigami stack cooledcal0078380005.10.2011 17:51:57  Good

I2C setting modified to improve the shape of the p-side signal --> shaping time reduced, pulse height still low

Origami6
HV=+-40V
beam on

CO2 cooling: 
preassure @ P_TT_4 = 18.2 bar
mass flow = 0.9 g/s

I=18.0µA

longterm files
It-pos-0510111531.txt 
It-neg-0510111531.txt  

currents and temperatures:
05.10.2011  17:53:00  event=2900  rate=47events/s temp/curr=35.3/-05.6 35.3/-06.0 35.3/-06.9 34.6/001.9 34.8/002.2 34.8/020.7
 

ELOG V3.1.5-fc6679b