Entry  Tue Aug 11 14:03:57 2009, Marko Dragicevic, , Sensor Designs, , , ,  6x

Screenshots

HEPHY Gallery

GDS File Viewer

 KLayout Website

 Layer Properties File Warsaw.lyp in den Attachments.

Entry  Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,  

 

  • 5mm Inbus-Schlüssel
  • 3mm Inbus Schlüssel
  • 6- 2(1) x 30 Pt-Pins
  • beim 5mm-Sockel müssen die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
  • bei Pt-Deckel oben einzeichnen welche Balkenstellung welchem Winkel entspricht

(SK) ... SenkKopf

(ZK) ... ZylinderKopf

 

Beam Positions  (alle mit 5mm-Sockel)

 

OPTISCHER SETUP Setup-alignment-modules

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) Collimator

  • Alu-Spacer (neuer = höheren verwenden) + 4- M6 x 15 (ZK)
  • schwarzer-Spanier-x-y-z-Tisch - Schreuben dabei -> Plastikschrauben abschneiden ?!?

2) 5mm Spacer + h03 - backplane richtung Collimator -  APV3210

  • 2- M4 x 15 (SK) - 5mm Spacer durch Alignment-Boden mit h03 verschrauben
  • 3- M4 x 15 (SK) - Alignment-Boden auf Drehteller verschrauben

3) h04 - backplane richtung Collimator -  APV3210

  • 2 Positionen
  • 2- M4 x 10 (SK)

 

 

Pt + ITE-512-Stack + 3 SiLC08-Module

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) h06-ITE-512 - APV0123 (allerdings nur eineinhalb APVs gebondet!)

2) h05-ITE-512 - APV0123

3) h07-ITE-512 - APV3210 !!!

4) SiLC08-2 - APV12 - 90° gedreht

5) SiLC08-1 - APV12 - 90° gedreht

6) SiLC08-0 - APV12 - 90° gedreht

Stack 1) bis 6)

  • schwarzer Sockel +4- M4 x 35 (ZK) -> verschraubt in h06 und h07
  • 2 Gewindestangen M6 x 80 + 4 Scheiben + 4 Muttern M6 -> die 3 ITE-512er zusammen
  • 3 Gewindestangen M6 x 160 + 6 Scheiben + 5 Flügelmuttern M6 + 1 Mutter M6 -> 3- SiLC08-Module VORSICHTIG dazu

7) h02-Pt - APV0123 - überprüfen - kann rotieren ;-)

  • Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-Modul
  • Balken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20

8) h01-Pt - APV0123 - überprüfen - kann rotieren;-)

  • Schrauben gehen von oben (ausserhalb der Box): Balken - Box-Deckel - Beilagscheibe - Pt-Modul
  • Balken + 4- 2(1) x 30 Pins + 2- Scheiben + 2- M4 x 20

 

 

ITE128-Stack

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) h21_alignment-TS05 - APV12 - 90°gedreht

2) h13_ITE-PAS - APV1

3) h14_ITE-PAS - APV1

4) h15_ITE-PAD - APV1

5) h16_ITE-PAD - APV1

6) h11_ITE-STD - APV1

7) h12_ITE-STD - APV1

8) h22-alignment-TS07 - APV12 - 90°gedreht

Schrauben verwenden je nach Sockel und Spacer

 

SiLC08-Stack

upstream - BEAM VON UNTEN - APV-Nummerierung in Beamrichtung von links anfangend

1) SiLC08-7 - APV12 - Überprüfen

2) SiLC08-6 - APV12 - Überprüfen

3) SiLC08-5 - APV12 - Überprüfen

4) SiLC08-4 - APV12 - Überprüfen

5) SiLC08-3 - APV12 - Überprüfen

6) SiLC08-2 - APV12 - Überprüfen

7) SiLC08-1 - APV12 - Überprüfen

8) SiLC08-0 - APV12 - Überprüfen 

Schrauben verwenden je nach Sockel und Spacer

Entry  Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,  

HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)

h01-Pt: 10uA

h02-Pt: 1.6uA

3 SiLC DUTs mit je ca. 38nA

h07-ITE-512: 3.77uA

h05-ITE-512: breakthrough

h06-ITE-512: breakthrough

Entry  Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,  

Status of config files as of Friday 14 August 2009 late evening

Config file name Timing adjusted Sensor definition Tested
cern09_ite128_single1 YES NOT YET (?) YES

cern09_ite128_multi6

YES NOT YET (?) YES

cern09_pt_ite512_single1

YES NOT YET (?) YES

cern09_pt_ite512_multi6

YES NOT YET (?) NO

cern09_alignment_beam_single1

YES NOT YET (?) YES

cern09_alignment_beam_multi6

YES NOT YET (?) YES

cern09_belle_single

YES NOT YET (?) YES

cern09_belle_multi6

YES NOT YET (?) YES
cern09_silc_all_single YES (2008) YES (2008) NO
cern09_silc_all_multi6 YES (2008) YES (2008) NO




Entry  Wed Aug 19 15:37:37 2009, Christian Irmler, ITE128, internal calibration, cal001, , 15:31:29,  

8 modules, HV=70V, 40MHz, 1 sample
no beam

APV 4,5: inverter off, higher baseline = PAD modules

Entry  Wed Aug 19 15:41:17 2009, Wolfgang Kiesenhofer, SiLC, angle scan templates, , , ,  13x

Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen auf die Beam Richtung).

Entry  Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,  

TLU (run from DAQPCHEPHY):

ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12

-t100 internal trigger
-aXX Mask for Szintis:
1   4 mm (front)
2   4 mm (front)
4   9 mm (back)
8   9 mm (back)

DAQ:

Hostname: DAQPCHEPHY.CERN.CH

XY Table PC:

Hostname: XYPCEUDET.CERN.CH

Beam Control:

Hostname: cwo-hna453-h6b1.cern.ch
137.138.61.206

Eudet DAQ:

vnc eudetmac001.cern.ch
Cycle Run:
o) stop DAQ
o) kill eudaq Run Control
o) restart: ./STARTRUN.FORTIS.1
o) load config: testfortis_with_eudrb_beam_backpressure_WITH_SILC
o) press: Config (wait ~1 min.)
o) press: Start

Entry  Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,  

DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
9x9 mm beam spot

height (y) = 139.3100

ITE128 shooting into strips w pitch adapter, upper edge of sensor

Entry  Thu Aug 20 15:54:45 2009, Manfred Valentan, BELLE, temp/humidty logger data, , , ,  easylog_under_telescope.gif

position: underneath telescope. dewpoint ~ 15 degree

test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe

Entry  Thu Aug 20 18:56:25 2009, Christian Irmler, alignment_laser, laser, laser001, 100000, 20.08.2009 18:48:53,  

2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite to the beam)
 

HV=70V, 40MHz, 6 samples
beam off
module 1 (h03) is used w inverter off
since the signal off the second sensor is only 10 percent, the base line of h03 was increased again (now @ 260 ADC).

5ns trigger pulse width, 1 kHz trigger, 
current_laser=10mA,
Photodiode: pulse_width=15ns, amplitude=7mV

bad strips: APV5: 115, APV6: 1

Entry  Fri Aug 21 13:38:20 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run011, 75000, 21.08.2009 13:35:25 ,  

4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
processed mode, hit cut = 5
beam position:  p-side: APV2 of Origami, n-side: between APV1 and 2 of Origami (center of sensors)

JP-module is hit at APV3, module seems to be on a higher position than in past beam test (eventuelly flipped)

Entry  Fri Aug 21 16:37:22 2009, Christian Irmler, BELLE, internal calibration 40 MHz hit mode, cal006, , 21.08.2009 16:30:33,  

Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode

switched back to internal 40 MHz clock

Entry  Fri Aug 21 17:14:58 2009, Wolfgang Kiesenhofer, , S/N Histograms Raw (no data selection), run001 (strips), run002 (pitch adapter), run003 (upper edge), , ,  sn_langaufit_raw_strips.pdfsn_langaufit_raw_pa.pdfsn_langaufit_raw_edgerun.pdf
 
Entry  Fri Aug 21 22:42:32 2009, Thomas Bergauer, common, EUDAQ config file used when running with telescope, , , ,  testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf

 

Used until Friday, 21.08.09:

 

AndMask = 0xf # 4x4 mm scintillator for trigger 

Used since Friday, 21.08.09: 
AndMask = 0xc # 9x9 mm scintillator for trigger 





Local trigger using TLU only: ALWAYS WITH 9x9mm scintillator

Entry  Sat Aug 22 11:54:49 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1150_beam_conditions.jpg

beam shifted a bit in vertical direction downwards since 21. August 09 evening

Beam configuration:

Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Entry  Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , ,  

Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6

run angle[deg] pos height (xy-table) importance events
1 1 center module   + 10k
2 2 center module   + 10k
3 3 center module   + 10k
4 4 center module   + 10k 
5 5 center module   + 10k 
6 6 center module   + 10k 
7 7 center module   + 10k 
8 8 center module   +  10k
9 9 center module   +  10k
10 10 center module   +  10k
11 12 center module   + 10k 
12 14 center module   - 10k 
13 16 center module   - 10k
14 0 center module   + ? depends on ite512
15 0 upper pos   + 10k
16 0 lower pos   + 10k

 

Entry  Sat Aug 22 15:12:44 2009, Thomas Bergauer, common, beam profile, , , ,  20090822_1511_beam_conditions.jpg

playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position

Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008

Rate: 3.35E5 particles/spill (measured with SCINT8 in beamline)

Particle Production Applet
Calculator applet

For +120 Gev/c beam:

Pi+ 55.67 %
p 38.95 %
K+ 5.38 %

Entry  Sat Aug 22 22:14:50 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode + cooling, cal010, , 22.08.2009 22:24:22,  

Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
external clock
cooling
chiller set to 13 deg.

Bypass removed to achieve better watter flow at the module!
Chiller pump is set to 2800 rpm

Entry  Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , ,  IandRH_first_Pt_run.pngPicture_1.png

Current of Pt modules during first run

Data of the run was dicarded.

Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.

Timescales for RH and I graph are different!!!

after 3 hours first bottle of compressed air (dewpoint -170 degree C) is gone and sensor Pt-h01 starts to fluctuate again

 

Current of ITE512 plus 2 SiLC08 modules

HV=70V, Current: 25uA first, 29uA then, 35uA latest. now stable

 

Entry  Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,  

Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
Telescope: run7316

ELOG V3.1.5-fc6679b