Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2024, Page 6 of 11  Not logged in ELOG logo
Entry  Sat Dec 14 13:40:47 2024, Felix Ulrich-Pur, threshold and preamp tests, 26, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 63.3 MeV/u, Low Flux High, Helium, Good, 12:35, 12:49, 14, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 10000 (changed threshold)

Diamond: 500mA, threshold 50
Entry  Sun Jun 9 01:27:38 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Knochen, 25, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 01:16, 01:30, , , ,  
3 cm dense bone (in isocentre)
2.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 600 kHz on LGAD

WET measurement
Entry  Sat Dec 14 13:39:15 2024, Felix Ulrich-Pur, Energy vs TOF calibration, 25, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 63.3 MeV/u, Low Flux High, Helium, Good, 12:05, 12:23, 18, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

380 kHz with Ramon and only 180kHz TRB, 42ps single channel res prae calib
Entry  Sun Jun 9 01:26:56 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Knochen, 24, TOF-Cal GSI, 145.4 MeV, Low Flux High, Proton, Good, 01:02, 01:14, , , ,  
2 cm dense bone (in isocentre)
2.1 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 315 kHz on LGAD

WET measurement
Entry  Sat Dec 14 13:37:26 2024, Felix Ulrich-Pur, Energy vs TOF calibration, 24, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 73.2 MeV/u, Low Flux High, Helium, Good, 11:42, 12:00, 18, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

2MHz with Ramon and only 200kHz TRB
Entry  Sun Jun 9 01:25:26 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Knochen, 23, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 00:30, 01:02, , , ,  
2 cm dense bone (in isocentre)
- Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1 MHz on LGAD

interlock at 00:31 till 00:50 --> 19min break
Entry  Sat Dec 14 13:35:59 2024, Felix Ulrich-Pur, Energy vs TOF calibration, 23, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 124.4 MeV/u, Low Flux High, Helium, Good, 11:24, 11:37, 13, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

5MHz with Ramon and only 500kHz TRB
Entry  Sun Jun 9 01:22:48 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Knochen, 22, TOF-Cal GSI, 145.4 MeV, Low Flux High, Proton, Good, 00:14, 00:23, , , ,  
1 cm dense bone (in isocentre)
2.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 600 kHz on LGAD

WET measurement
Entry  Sat Dec 14 13:34:18 2024, Felix Ulrich-Pur, Energy vs TOF calibration, 22, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 97.2MeV/u, Low Flux High, Helium, Good, 10:58, 11:23, 25, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

3MHz with Ramon and only 300kHz with TRB-44ps single channel res prae calib
Entry  Sun Jun 9 00:12:41 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Knochen, 21, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 00:00, 00:14, , , ,  
1 cm dense bone (in isocentre)
4.5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 1.2 MHz on LGAD

WET measurement
Entry  Sat Dec 14 13:31:49 2024, Felix Ulrich-Pur, Energy vs TOF calibration, 21, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 147.2 MeV/u, Low Flux High, Helium, Good, 10:41, 10:56, 15, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

3.5MHz with Ramon and only 600kHz with TRB-52ps single channel res prae calib
Entry  Sun Jun 9 00:10:38 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 20, TOF-Cal GSI, 145.4 MeV, Low Flux High, Proton, Good, 23:31, 00:00, , , ,  
5 cm plastic water (in isocentre)
2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 330 kHz on LGAD

14 min break with beam off (DAQ failed, had to power cycle TRB3s and all DIRICH boards-->out of synch DIRICH)
Entry  Sat Dec 14 13:28:57 2024, Felix Ulrich-Pur, Energy vs TOF calibration, 20, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 147.2 MeV/u, Low Flux Medium, Helium, Good, 10:33, 10:38, 5, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

300kHz with Ramon and only 40kHz with TRB--> decision to go to low flux high was made
Entry  Sat Jun 8 19:56:37 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs Calibrationcurve, 2, TOF-Cal GSI, 252.7 MeV, Low Flux Medium, Proton, Good, 16:29, 16:47, , , ,  
1 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 350kHz on LGAD

TOF Calibration Curve
Entry  Sat Dec 14 12:52:02 2024, Felix Ulrich-Pur, Shift 23.11.24 low flux He test with RaMon, 2, RaMon, 177.8 MeV/u, Low Flux Medium, Helium, Good, 06:31, 06:32, 1, , ,  
Mean rate per spill~ 6-8E5 p/s (online estimation without proper analysis)
Entry  Sun Jun 9 00:08:07 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 19, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 23:20, 23:30, , , ,  
5 cm plastic water (in isocentre)
3.7 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 795 kHz on LGAD

WET measurement
Entry  Sat Dec 14 13:26:29 2024, Felix Ulrich-Pur, Energy vs TOF calibration, 19, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 177.8 MeV/u, Low Flux Medium, Helium, Good, 10:08, 10:25, 17, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

750kHz with Ramon and only 160kHz with TRB, 44ps single channel res preacalib
Entry  Sun Jun 9 00:07:17 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 18, TOF-Cal GSI, 145.4 MeV, Low Flux High, Proton, Good, 23:04, 23:20, , , ,  
4 cm plastic water (in isocentre)
2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 500 kHz on LGAD

WET measurement
Entry  Sat Dec 14 13:16:33 2024, Felix Ulrich-Pur, Energy vs TOF calibration +Alignment of DOGMA setup, 18, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 09:42, 09:48, 6, , ,  
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

DOGMA setup had to be shifted manually to align it with the beam
Entry  Sun Jun 9 00:06:01 2024, Felix Ulrich-Pur, TOF CAL HADES LGADs WET Messung Wasser, 17, TOF-Cal GSI, 194.3 MeV, Low Flux High, Proton, Good, 22:53, 23:04, , , ,  
4 cm plastic water (in isocentre)
3.8 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 900 kHz on LGAD

WET measurement
ELOG V3.1.5-fc6679b