Message ID: 157     Entry time: Sat Dec 14 13:16:33 2024
Author: Felix Ulrich-Pur 
Subject: Energy vs TOF calibration +Alignment of DOGMA setup 
Run Number: 18 
DUT: TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon 
Beam Energy: 205.2 MeV/u 
Rate Setting: Low Flux Medium 
Particle Type: Helium 
Data: Good 
t-Start: 09:42 
t-Stop: 09:48 
Duration_min:
Frontend:  
Phantom:  
Phantom thickness:  

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

DOGMA setup had to be shifted manually to align it with the beam