Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2024  Not logged in ELOG logo
Message ID: 91     Entry time: Sun Jun 9 00:10:38 2024
Author: Felix Ulrich-Pur 
Subject: TOF CAL HADES LGADs WET Messung Wasser 
Run Number: 20 
DUT: TOF-Cal GSI 
Beam Energy: 145.4 MeV 
Rate Setting: Low Flux High 
Particle Type: Proton 
Data: Good 
t-Start: 23:31 
t-Stop: 00:00 
Duration_min:  
Frontend:  
Phantom:  
Phantom thickness:  

5 cm plastic water (in isocentre)
2 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 330 kHz on LGAD

14 min break with beam off (DAQ failed, had to power cycle TRB3s and all DIRICH boards-->out of synch DIRICH)

WET measurement

ELOG V3.1.5-fc6679b