Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2024  Not logged in ELOG logo
Message ID: 161     Entry time: Sat Dec 14 13:34:18 2024
Author: Felix Ulrich-Pur 
Subject: Energy vs TOF calibration 
Run Number: 21 
DUT: TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon 
Beam Energy: 97.2MeV/u 
Rate Setting: Low Flux High 
Particle Type: Helium 
Data: Good 
t-Start: 10:58 
t-Stop: 11:23 
Duration_min: 25 
Frontend:  
Phantom:  
Phantom thickness:  

TRB Setup: 260V bias and 250mA pre-amps, threshold 1000

3MHz with Ramon and only 300kHz with TRB-44ps single channel res prae calib

ELOG V3.1.5-fc6679b