ID |
Date |
Author |
Project |
Measurement Type |
Object ID |
Subject |
Text |
|
1
|
Fri Apr 18 17:23:26 2008 |
Markus Friedl | SPS Testbeam June08 | hybrid | hybrid 01 | Noise of hybrid 01, sensor fully bonded, no HV | HV bias not yet glued to backplane |
|
2
|
Tue Apr 22 19:34:09 2008 |
Markus Friedl | SPS Testbeam June08 | module | hybrid 01 | Properties of hybrid 01, sensor fully bonded, HV=100V | HV bias glued to backplane, HV=100V |
6x |
4
|
Wed Apr 23 13:37:18 2008 |
Markus Friedl | SPS Testbeam June08 | source | hybrid 01 | analysis results of source test | Ignore the "KEK November 2007" title - that's
a legacy and is already changed :-)
|
|
5
|
Wed Apr 30 16:52:17 2008 |
Markus Friedl | BELLE Upgrade | module | micron | micron sensor glued to frame | soeben haben wir den micron-DSSD (double metal
layer) in den 2-teiligen rahmen geklebt und
auf beiden seiten
|
|
14
|
Tue May 20 14:27:50 2008 |
Markus Friedl | BELLE Upgrade | source | micron | analysis results of source test |
*** NOTE: AFTER THIS MEASUREMENT WE REALIZED
THAT BIASING WAS NOT DONE PROPERLY
|
9x |
37
|
Tue May 19 09:31:50 2015 |
Hao Yin | | | | Noise Test ITA | Everything works except L3 p-side.
The config file is shown in the
following: |
|
38
|
Tue May 19 10:08:53 2015 |
Hao Yin | | | | FADC system setup success | 3 FADC. All Channel/APV25 running (except
L3 n first and last -> not connected (bonding))
n-side: all connectors |
|
39
|
Tue May 19 10:57:19 2015 |
Hao Yin | Belle II | system | FIR | FIR filter | first fir filter run:
# 1:[0x[FADC ID] in hex], 2:[APV25
ChannelNr], 3-10:[fir coef in float] |
|
40
|
Tue May 19 11:01:29 2015 |
Hao Yin | Belle II | system | Pedestal | PedestalRun | FIRRun001
Baseline measurement without injections,
50000 event, |
16x |
41
|
Tue May 19 13:23:16 2015 |
Hao Yin | Belle II | system | Calibration | CalibrationRun001 | PedestalRun001, FIRRun001,
room temperature,
no noise injection |
|
42
|
Tue May 19 13:42:04 2015 |
Hao Yin | | | | L6 Noise inJection Setup | Test Nr. 1:
RLC between DockBox and Hybrid
(both side). |
|
43
|
Tue May 19 14:48:06 2015 |
Hao Yin | Belle II | module | L6 Noise inJection Runs | L6 Noise inJection Runs | Folder "L6_RLC_Test"
Configuration file: /mnt/data/ITA_NOISE_TESTS/L6_RLC_Test/SinglePeak_3Fadc.cfg
3 Tests: Injkection to 2.5V 1.25V. |
|
44
|
Wed May 20 10:12:12 2015 |
Hao Yin | | | | Ladder RLC test (CMC Injection) | L5 Ladder Test
folder: /mnt/data/ITA_NOISE_TESTS/Ladder_test
Setup: ladder |
|
45
|
Thu May 21 18:23:22 2015 |
Hao Yin | | | | Noise Injection LV cable | (TestNr. 15)
injecting sin wave into LV at different |
|
46
|
Fri May 22 12:01:32 2015 |
Hao Yin | | | | CMC injection LV 10V | Comparison w/o filter (LC) connected to
-z_n side.
Mateo has the results. |
|
47
|
Mon May 25 10:38:03 2015 |
Hao Yin | Belle II | system | L5 Ladder Emission Test | Emission | (TestNr: 16)
base line noise measurement are
saved in SYSTEM_CHECK_AFTER_WE. |
|
48
|
Mon May 25 20:27:23 2015 |
Hao Yin | Belle II | system | Caen PS base line measurements | | Baseline noise measurements wo injection.
measure noise in both HV and LV.
wings of APV25 using cmc with 128 |
|
49
|
Wed May 27 09:30:54 2015 |
Hao Yin | Belle II | system | CAEN PS Primary side | | Measured Primary side of caen wo load (setup
attachment 2 and prelimilary res. attachment
1. ) |
|
50
|
Fri May 29 11:47:56 2015 |
Hao Yin | Belle II | system | PS Filter | Testing PS LV filter and quantifying the required min noise lvl | Data of this entry is recorded in the folder:
LV315kHz_Injections
Injecting noise to LV with a freq. |
|
51
|
Mon Nov 30 15:12:19 2015 |
Hao Yin | | | | FIR_ADC config | FIR filter and ADC delay test:
ADC delay and FIR filter with and
without cooling to reproduce error detected |
|