Home CMS Production Clean room MedAustron HEPHY testbeams old
electronics module assembly SiDDaTA scratch
  HEPHY logbook of the Electronics Group  Not logged in ELOG logo
Message ID: 38     Entry time: Tue May 19 10:08:53 2015
Type: Common 
Author: Hao Yin 
Project:  
Subject: FADC system setup success 
Object ID:  
Measurement Type:  
Run Number:  

3 FADC. All Channel/APV25 running (except L3 n first and last -> not connected (bonding))

n-side: all connectors

p-side: 0x01: 1, 2, 4 and 0x02, 1 with L3 p and L4 p (Telescope)

Possible error: Blue connector cable between FADC and DockBox!!!!

 

Bad channels:

telescope: L5-p 3. APV25,

                  L3-p 0. and 5. APV25

Ladder: all chips working.

ELOG V3.1.5-fc6679b