Fri Oct 23 08:09:04 2009, Stephan Hänsel, Measurements, Run 11273 - data
|
B=0, TPC inbetween but no TPC readout
Beam: 3GeV
silicon position from TPC-support-ring: |
Fri Oct 23 08:02:57 2009, Stephan Hänsel, Measurements, Run 11271 - position run
|
B=0, TPC inbetween but no TPC readout
Beam: 3GeV
moved silicon to center position (~58cm from TPC-support-ring) |
Fri Oct 23 07:57:01 2009, Stephan Hänsel, Measurements, Run 11270 - latency scan
|
B=0, TPC inbetween but no TPC readout
scan from 70 to 120 with 1000 events each
root-diagram -> latency ~ 75 |
Fri Oct 23 07:52:52 2009, Stephan Hänsel, Measurements, Run 11269 - Pedestal Run
|
B=0, TPC inbetween but no TPC readout |
Thu Oct 22 11:18:34 2009, Stephan Hänsel, Setup, Pictures
|
Photo Gallery
zusätliche Photos:
labeled SiLC in front of TPC |
Wed Oct 1 11:42:44 2008, stephan hänsel, Setup, Modulkomponenten
|
MODULE 0
1 Sensor Module (SiLC01):
Hybrid: TEC_6D.2.1 / 30216662133923 |
Thu Oct 22 08:02:26 2009, Stephan Hänsel, Setup, Electronics
|
HV-Kapton-PIN-assignment
CCUM-to-Module Adapter-Cards |
Mon Nov 2 13:22:50 2009, Stephan Hänsel, Setup, DAQ
|
start data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X |
Tue Nov 3 10:45:01 2009, Stephan Hänsel, Setup, Beam On
|
clear test beam areas:
go to T24 (front area):
use (red) key from interlock
go into T24 area, close door, use red key in keyhole next to door -> big red light on
|
Tue Nov 3 11:18:46 2009, Stephan Hänsel, Setup, Beam Off
|
close shutter:
close shutter T24/1 with the button "Beam Shutter zu" (green) -> bottom green light next to the keys should go on
close shutter T24 with the button "Beam Shutter auf" (green) -> bottom green light next to the keys should go on
turn |
Fri Feb 27 13:34:11 2009, Stephan Hänsel, Measurements, ARCs Noise PIoff + channels 2 repair
|
|