Wed Oct 1 11:42:44 2008, stephan hänsel, Setup, Modulkomponenten
|
MODULE 0
1 Sensor Module (SiLC01):
Hybrid: TEC_6D.2.1 / 30216662133923 |
Wed Feb 25 09:57:15 2009, Stephan Hänsel, Measurements, Sensor IV-Kurven + CV-Messungen (vor Modulbau)
|
|
Fri Feb 27 13:34:11 2009, Stephan Hänsel, Measurements, ARCs Noise PIoff + channels 2 repair
|
|
Fri Feb 27 14:03:53 2009, Stephan Hänsel, Setup, Setup 3D
|
|
Thu Oct 22 08:02:26 2009, Stephan Hänsel, Setup, Electronics
|
HV-Kapton-PIN-assignment
CCUM-to-Module Adapter-Cards |
Thu Oct 22 08:04:51 2009, Stephan Hänsel, Setup, geometry - silicon envelope
|
distance si-sledge-front to silicon-Z-center = 23 cm
-> silicon sledge front 35 cm inside from front of TPC-support at a beam position 58 cm from front of TPC-support
|
Thu Oct 22 11:18:34 2009, Stephan Hänsel, Setup, Pictures
|
Photo Gallery
zusätliche Photos:
labeled SiLC in front of TPC |
Fri Oct 23 07:52:52 2009, Stephan Hänsel, Measurements, Run 11269 - Pedestal Run
|
B=0, TPC inbetween but no TPC readout |
Fri Oct 23 07:57:01 2009, Stephan Hänsel, Measurements, Run 11270 - latency scan
|
B=0, TPC inbetween but no TPC readout
scan from 70 to 120 with 1000 events each
root-diagram -> latency ~ 75 |
Fri Oct 23 08:02:57 2009, Stephan Hänsel, Measurements, Run 11271 - position run
|
B=0, TPC inbetween but no TPC readout
Beam: 3GeV
moved silicon to center position (~58cm from TPC-support-ring) |
Fri Oct 23 08:09:04 2009, Stephan Hänsel, Measurements, Run 11273 - data
|
B=0, TPC inbetween but no TPC readout
Beam: 3GeV
silicon position from TPC-support-ring: |
Mon Nov 2 13:22:50 2009, Stephan Hänsel, Setup, DAQ
|
start data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X |
Mon Nov 2 13:59:09 2009, Stephan Hänsel, Setup, ToDo before data-taking
|
in hut:
plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you
look from the back of the PC))
power on CCUM in spacing behind electronic hut
switch on opto-electrical converter for FED (on |
Tue Nov 3 10:45:01 2009, Stephan Hänsel, Setup, Beam On
|
clear test beam areas:
go to T24 (front area):
use (red) key from interlock
go into T24 area, close door, use red key in keyhole next to door -> big red light on
|
Tue Nov 3 11:18:46 2009, Stephan Hänsel, Setup, Beam Off
|
close shutter:
close shutter T24/1 with the button "Beam Shutter zu" (green) -> bottom green light next to the keys should go on
close shutter T24 with the button "Beam Shutter auf" (green) -> bottom green light next to the keys should go on
turn |
Wed Nov 4 15:29:00 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal
|
|
Wed Nov 4 15:31:39 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal
|
15399 triggers
HV: 200V -> 2µA
LV: |
Wed Nov 4 16:10:24 2009, Stephan Hänsel, Measurements, Run 20056 - Micromegas #805
|
10989 events
HV: 200V -> 2µA
LV: |
Wed Nov 4 16:12:33 2009, Stephan Hänsel, Measurements, Run 20057 - Micromegas #806
|
1076 events
trigger rate 7,25Hz
bx = real trigger number |
Wed Nov 4 16:31:42 2009, Stephan Hänsel, Measurements, Run 20059 - Micromegas #807
|
crashed at 3648 events -> TPC got much more events
Beam: 5,6 GeV
one Micromegas module in center position |