  31  
 | 
Fri Nov 27 12:23:25 2009 | 
Stephan Hänsel | Measurements | Run 20077 - Pedestal |  16196 events 
with 2 Micromegas modules 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    - -> front Z: 5mm too far inside the gap
 
    - -> back Z: 5mm too far outside the gap
 
 
  
HV: 200V -> 1,2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,632 / 1,739   //   0,622 / 1,752
 
 
  
  
   |  
| 
  30  
 | 
Fri Nov 27 12:22:19 2009 | 
Stephan Hänsel | Measurements | Run 20075 - Micromegas 817 |  46196 events (usable: 42433 events) 
with 2 Micromegas modules (TPCDAQ stopped at 46195 events) 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    - -> front Z: 5mm too far inside the gap
 
    - -> back Z: 5mm too far outside the gap
 
 
rate: 4,1 Hz 
HV: 200V -> 1,2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,632 / 1,739   //   0,622 / 1,752
 
 
  
  
   |  
| 
  29  
 | 
Fri Nov 27 12:21:00 2009 | 
Stephan Hänsel | Measurements | Run 20074 - Micromegas 816 |  10010 events 
with 2 Micromegas modules (TPCDAQ stopped at 10003 events) 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    - -> front Z: 5mm too far inside the gap
 
    - -> back Z: 5mm too far outside the gap
 
 
rate: 4,1 Hz 
HV: 200V -> 1,2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,632 / 1,739   //   0,622 / 1,752
 
 
  
  
   |  
| 
  28  
 | 
Thu Nov  5 19:46:15 2009 | 
Stephan Hänsel | Measurements | Run 20073 - Micromegas 815 |  10070 events 
with 2 Micromegas modules (TPCDAQ stopped at 9864 events) 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    - -> front Z: 5mm too far inside the gap
 
    - -> back Z: 5mm too far outside the gap
 
 
  
HV: 200V -> 1,2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,632 / 1,739   //   0,622 / 1,752
 
 
  
  
   |  
| 
  27  
 | 
Thu Nov  5 19:44:28 2009 | 
Stephan Hänsel | Measurements | Run 20070 - positionrun |  2257 events without Micromegas 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front and 36mm above center position 
    - -> front Z: 5mm too far inside the gap
 
    - -> back Z: 5mm too far outside the gap
 
 
  
  
HV: 200V -> 1,2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,632 / 1,739   //   0,622 / 1,752
 
 
  
  
   |  
| 
  26  
 | 
Thu Nov  5 19:36:48 2009 | 
Stephan Hänsel | Measurements | Run 20069 - pedestal |  13600 events without Micromegas 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front 
HV: 200V -> 1,2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,632 / 1,739   //   0,622 / 1,752
 
 
  
  
   |  
| 
  25  
 | 
Thu Nov  5 19:34:58 2009 | 
Stephan Hänsel | Measurements | Run 20065 - pedestal |  18400 events without Micromegas 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front 
HV: 200V -> 1,2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,632 / 1,739   //   0,622 / 1,752
 
 
  
  
   |  
| 
  24  
 | 
Thu Nov  5 19:33:53 2009 | 
Stephan Hänsel | Measurements | Run 20064 - pedestal |  12199 events without Micromegas 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front 
HV: 100V -> 1µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,648 / 1,760   //   0,638 / 1,774
 
 
  
  
   |  
| 
  23  
 | 
Wed Nov  4 18:24:48 2009 | 
Stephan Hänsel | Measurements | Run 20063 - Micromegas #808 |  crashed at 18577 events - TPC 19220 events 
Beam: 5,6 GeV 
one Micromegas module in center position 
silicon sledge 35cm inside from TPC-support-front 
  
  
HV: 200V -> 2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,627 / 1,605   //   0,618 / 1,617
 
 
  
  
   |  
| 
  22  
 | 
Wed Nov  4 18:19:44 2009 | 
Stephan Hänsel | Measurements | Run 20062 - data |  6493 events without Micromegas 
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front 
HV: 200V -> 2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,621 / 1,722   //   0,610 / 1,734
 
 
  
  
   |  
| 
  21  
 | 
Wed Nov  4 17:12:47 2009 | 
Stephan Hänsel | Measurements | Run 20061 - Latency Scan -> 70 |  LATENCY IS SET TO 70 
spillsize = 500 
  
  
  
Beam: 5,6 GeV 
silicon sledge 35cm inside from TPC-support-front 
HV: 200V -> 2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,621 / 1,722   //   0,610 / 1,734
 
 
  
  
   |  
| 
  20  
 | 
Wed Nov  4 16:31:42 2009 | 
Stephan Hänsel | Measurements | Run 20059 - Micromegas #807 |  crashed at 3648 events -> TPC got much more events 
Beam: 5,6 GeV 
one Micromegas module in center position 
silicon sledge 35cm inside from TPC-support-front 
HV: 200V -> 2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,621 / 1,722   //   0,610 / 1,734
 
 
  
  
   |  
| 
  19  
 | 
Wed Nov  4 16:12:33 2009 | 
Stephan Hänsel | Measurements | Run 20057 - Micromegas #806 |  1076 events 
trigger rate 7,25Hz 
bx = real trigger number 
  
  
HV: 200V -> 2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,621 / 1,722   //   0,610 / 1,734
 
 
 
  
   |  
| 
  18  
 | 
Wed Nov  4 16:10:24 2009 | 
Stephan Hänsel | Measurements | Run 20056 - Micromegas #805 |  10989 events 
HV: 200V -> 2µA 
LV: 
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,621 / 1,722   //   0,610 / 1,734
 
 
trigger rate 7,25Hz  
!!!!! in eventfile: time-stamp instead of real trigger number !!!!! 
  
   |  
| 
  17  
 | 
Wed Nov  4 15:31:39 2009 | 
Stephan Hänsel | Measurements | Run 20055 - Pedestal |  15399 triggers 
HV: 200V -> 2µA 
LV:  
    - 01,30 / 02,60   //   01.30 / 02.60
 
    - 0,621 / 1,722   //   0,610 / 1,734
 
 
  
   |  
| 
  16  
 | 
Wed Nov  4 15:29:00 2009 | 
Stephan Hänsel | Measurements | Run 20055 - Pedestal |   |  
| 
  15  
 | 
Tue Nov  3 11:18:46 2009 | 
Stephan Hänsel | Setup | Beam Off |  close shutter: 
    - close shutter T24/1 with the button "Beam  Shutter zu" (green) -> bottom green light next to the keys  should go on
 
    - close shutter T24 with the button "Beam  Shutter auf" (green) -> bottom green light next to the keys should go on
 
    - turn all four keys -> (the top) 4 green lights should go out next to each pair of keys
 
 
go to T24/1 (LPTPC area): 
    - just open the door -> the two green and the big red lights go out
 
 
If you do not need the test beam any more: 
    - open door at test beam area T24  -> the two green and the big red lights go out
 
    - call Control Room 3500
 
    - switch off bending magnets
 
 
  |  
| 
  14  
 | 
Tue Nov  3 10:45:01 2009 | 
Stephan Hänsel | Setup | Beam On |  clear test beam areas: 
go to T24 (front area): 
    - use (red) key from interlock
 
    - go into T24 area, close door, use red key in keyhole next to door -> big red light on
 
    - push the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttons
 
    - go back to the door, turn key and keep it turned!
    
        - open the door, move out and close it again behind you
 
     
     
    - now it is the time to return the key again -> two green lights should go on
 
 
go to T24/1 (LPTPC area): 
    - use (black) key from interlock
 
    - go into T24/1 area, close door, use black key in keyhole next to door -> big red light on
 
    - push the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttons
 
    - go back to the door, turn key and keep it turned!
 
    
        - open the door, move out and close it again behind you
 
     
     
    - now it is the time to return the key again -> two green lights should go on
 
 
power bending magnets: 
    - choose beam energy according to list sticked to monitor
 
 
get beam: 
    - phone Control Room 3500
 
    - tell them to put the wire into DesyII at the position written in their lock book
 
 
open shutter: 
    - go back to hut
 
    - put back the red and black keys into the interlock
 
    - turn all four keys -> 5 green lights should be on next to each pair of keys
 
    - open shutter T24 with the button "Beam  Shutter auf" -> bottom green light next to the keys should go out
 
    - open shutter T24/1 with the button "Beam  Shutter auf" -> bottom green light next to the keys  should go out
 
    - now you should see beam
 
 
 -> start data taking 
  
  
  
  
  
   |  
| 
  13  
 | 
Mon Nov  2 13:59:09 2009 | 
Stephan Hänsel | Setup | ToDo before data-taking |  in hut: 
    - plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you look from the back of the PC))
 
    - power on CCUM in spacing behind electronic hut
 
    - switch on opto-electrical converter for FED (on top of PC (switch in the back) and switch on power supply (front))
 
    - LV on -> 01,30 and 02,60 (two times)
 
    - HV on -> 200V
 
 
T24/1 
    - power the scintillators for triggering
 
    - move envelope into beamline - sledge front to sensor center is 220,5mm
 
 
-> switch on the beam  |  
| 
  12  
 | 
Mon Nov  2 13:22:50 2009 | 
Stephan Hänsel | Setup | DAQ |  start data-taking: 
ssh xxx@bastion.desy.de -X 
ssh xdaq@flctpcikhero1.desy.de -X 
- 
at PC reboot: 
    - source xdaq_profile
 
    - cd scripts
 
    - ./fedpmc 0  + ctrl C when ready    //initialise the first FED
 
    - ./fedpmc 1  + ctrl C when ready    //initialise the second FED
 
    - ./gatecalib     //sets adresses for the TSC + gate
 
    - ./setdll 3 5     //sets width of the gate
 
 
when controllring newly connected 
    - source xdaq_profile (if not done before)
 
    - cd scripts
 
    - ./ProgramTest.exe -pci -reset     //-> controllring 0x4c90
 
 
test of devices: 
    - source xdaq_profile (if not done before)
 
    - cd scripts
 
    - ./ProgramTest.exe -pci -scanCCU     // searches for CCUs
 
    - ./ProgramTest.exe -pci -scantrackerdevice     // searches for CCUs and APVs
 
 
start xdaq: 
    - source xdaq_profile (if not done before)
 
    - /opt/firefox/firefox & -> http://ikhero2.desy.de:40000     // not working for now
 
    - ./xdaq.sh -p40000
 
    - reload firefox
 
 
HyperDAQ: 
    - -> Control Panel -> Configure Cluster -> load /home/xdaq/xml/peak_silc.xml 
 
    
        - tick: Configure Cluster
 
        - -> submit
 
     
     
    - -> view Applications -> Tracker Supervisor:
    
        - choose run type -> normal
 
        - tick: TLU in physics Run
 
        - type spillsize = 20
 
        - tick: No gate
 
     
     
 
if xdaq kills itself: 
  
 analysis: 
    - root:
    
        - in /Analysis/AC1Analysis-1.4>
 
        - .L runAna_silc.C
 
        - runAna(pedestalnumber,runnumber)
 
     
     
 
get file with number of single events in all 4 sensors + HitProfile 
    - root
    
        - .L readClusterTree_silc.cxx++
 
        - readClusterTree_silc(event number)
 
     
     
 
  
  
  
  
  
  
  
   |  
 
 |