Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC, Page 1 of 2  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Nov 27 12:23:25 2009, Stephan Hänsel, Measurements, Run 20077 - Pedestal 
16196 events
with 2 Micromegas modules
Beam: 5,6 GeV
Entry  Fri Nov 27 12:22:19 2009, Stephan Hänsel, Measurements, Run 20075 - Micromegas 817 20075_HitProfile.jpgOneTrackEvents_020075.txtTwoTrackEvents_020075.txt
46196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ stopped at 46195 events)
Beam: 5,6 GeV
Entry  Fri Nov 27 12:21:00 2009, Stephan Hänsel, Measurements, Run 20074 - Micromegas 816 OneTrackEvents_020074.txtTwoTrackEvents_020074.txt
10010 events
with 2 Micromegas modules (TPCDAQ stopped at 10003 events)
Beam: 5,6 GeV
Entry  Thu Nov 5 19:46:15 2009, Stephan Hänsel, Measurements, Run 20073 - Micromegas 815 OneTrackEvents_020073.txtTwoTrackEvents_020073.txt
10070 events
with 2 Micromegas modules (TPCDAQ stopped at 9864 events)
Beam: 5,6 GeV
Entry  Thu Nov 5 19:44:28 2009, Stephan Hänsel, Measurements, Run 20070 - positionrun 
2257 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
Entry  Thu Nov 5 19:36:48 2009, Stephan Hänsel, Measurements, Run 20069 - pedestal 
13600 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
Entry  Thu Nov 5 19:34:58 2009, Stephan Hänsel, Measurements, Run 20065 - pedestal 
18400 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
Entry  Thu Nov 5 19:33:53 2009, Stephan Hänsel, Measurements, Run 20064 - pedestal 
12199 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
Entry  Wed Nov 4 18:24:48 2009, Stephan Hänsel, Measurements, Run 20063 - Micromegas #808 
crashed at 18577 events - TPC 19220 events
Beam: 5,6 GeV
one Micromegas module in center position
Entry  Wed Nov 4 18:19:44 2009, Stephan Hänsel, Measurements, Run 20062 - data 
6493 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
Entry  Wed Nov 4 17:12:47 2009, Stephan Hänsel, Measurements, Run 20061 - Latency Scan -> 70 
LATENCY IS SET TO 70
spillsize = 500
 
Entry  Wed Nov 4 16:31:42 2009, Stephan Hänsel, Measurements, Run 20059 - Micromegas #807 
crashed at 3648 events -> TPC got much more events
Beam: 5,6 GeV
one Micromegas module in center position
Entry  Wed Nov 4 16:12:33 2009, Stephan Hänsel, Measurements, Run 20057 - Micromegas #806 
1076 events
trigger rate 7,25Hz
bx = real trigger number
Entry  Wed Nov 4 16:10:24 2009, Stephan Hänsel, Measurements, Run 20056 - Micromegas #805 
10989 events
HV: 200V -> 2µA
LV:
Entry  Wed Nov 4 15:31:39 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal 
15399 triggers
HV: 200V -> 2µA
LV: 
Entry  Wed Nov 4 15:29:00 2009, Stephan Hänsel, Measurements, Run 20055 - Pedestal 
 
Entry  Tue Nov 3 11:18:46 2009, Stephan Hänsel, Setup, Beam Off 
close shutter:

    close shutter T24/1 with the button "Beam  Shutter zu" (green) -> bottom green light next to the keys  should go on

   close shutter T24 with the button "Beam  Shutter auf" (green) -> bottom green light next to the keys should go on
    turn
Entry  Tue Nov 3 10:45:01 2009, Stephan Hänsel, Setup, Beam On 
clear test beam areas:
go to T24 (front area):

    use (red) key from interlock
    go into T24 area, close door, use red key in keyhole next to door -> big red light on
Entry  Mon Nov 2 13:59:09 2009, Stephan Hänsel, Setup, ToDo before data-taking 
in hut:

    plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you
look from the back of the PC))
    power on CCUM in spacing behind electronic hut
    switch on opto-electrical converter for FED (on
Entry  Mon Nov 2 13:22:50 2009, Stephan Hänsel, Setup, DAQ 
start data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X
ELOG V3.1.5-fc6679b