Mon Jun 8 11:57:14 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw058, 50000, 10, No, Good
|
RUN WITH SVD3 plus telescope
EUDET Run 58
Mimosa Threshold 6 |
Mon Jun 8 15:49:23 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 60, 50000, 10, No, Unknown
|
Hardware run with FEI4, Telescope and FW&BW Modules
Pos 10: x= 136.08mm, y=68.9 mm (narrow
side down) |
Wed Jun 10 20:54:36 2015, Benedikt Würkner, SVD3 (H6B), Residuals FE-I4 (Upstream), 59, , 10, No, Good
|
|
Thu Jun 4 15:12:41 2015, Hao Yin, Belle II FADC (H6A), Hardware, 001, 50000, 1, No, Good 20x
|
PedestalRun001, FIRRun001, room temp
telescope n-side switched.
In order to correct the position change the |
Sun Jun 7 13:18:20 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw008, 53670, 1, No, Good
|
FIRST GOOD RUN WITH SVD3 plus telescope
EUDET Run 49
Mimosa Threshold 7 |
Tue Jun 9 09:57:56 2015, Hao Yin, Belle II FADC (H6A), Hardware, 019, 62k, 1, No, Good
|
room temp
FIRRun002, PedestalRun007, Calibrationrun003 |
Wed Jun 10 19:05:04 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 71, 50000, 1, No, Unknown
|
RUN WITH SVD3, telescope and FEI4
EUDET Run 71
Mimosa Threshold 6 |
Wed Jun 10 21:36:25 2015, Benedikt Würkner, SVD3 (H6B), Horizontal Beam Profile Run, 72, 50000, 1, No, Good
|
Trying to get a nice plot of the beam profile by only using the and 3 (horizontal) see http://elog.hephy.at/testbeam-SPS2015/66
for details.
Pos 1: x=100 mm, y=79 mm (Hits |
Fri Jun 12 17:11:45 2015, Hao Yin, Belle II FADC (H6A), Hardware, 026, 50k, 1, No, Good
|
room temp
FIRRun002,
PedestalRun012, |
Sat Jun 13 17:05:35 2015, Benedikt Würkner, SVD3 (H6B), L3 with FEI4, 84, 30000, 1, No, Good
|
L3 sensor at position x: 105, y: 47 hitting apvs: 2&3 on p-side and apv 3 on n-side |
Sat Jun 13 19:29:50 2015, Hao Yin, Belle II FADC (H6A), Hardware, 030, , 1, No, Good
|
room temp
FIRRun002,
PedestalRun012, |
Tue May 12 10:27:39 2015, Benedikt Würkner, SVD3 (H6B), Setup information, , , , , Unknown
|
Information concerning the SVD3 setup during a beam test
In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies.
Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password |
Wed Jun 3 10:48:42 2015, Benedikt Würkner, common, Networking, , , , , Unknown
|
WLAN Router:
SSID: Hephy
password: 20supersecret14
DHCP Range: 192.168.0.200 to 239 |
Wed Jun 3 17:23:07 2015, Thomas Bergauer, Belle II FADC (H6A), XY stage positions, , , , , Unknown
|
x-Achse: positiv Richtung Saleve (counting room)
y-Achse: positiv Richtung UNTEN!! |
Thu Jun 4 14:15:50 2015, Hao Yin, Belle II FADC (H6A), FIR, 001, , , , Good
|
FIR filer and ADC delay with all sensor and telescope.
telescope n-side switched. |
Thu Jun 4 14:16:20 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 001, 10000, , , Good
|
FirRun001, room temp
telescope n-side switched. |
Thu Jun 4 18:45:42 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 003, 10000, , , Good
|
firrun003, room temp
|
Thu Jun 4 18:49:03 2015, Benedikt Würkner, SVD3 (H6B), Setup, , , , , Unknown
|
|
Fri Jun 5 12:02:29 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 001, , , , Good
|
room temp max subevent at 2. with lat = 96 |
Fri Jun 5 12:03:34 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 002, , , , Good
|
lat = 97 to a greater range of lat scan |
|