Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015  Not logged in ELOG logo
Message ID: 85     Entry time: Wed Jun 10 21:36:25 2015
Author: Benedikt Würkner 
Project: SVD3 (H6B) 
Subject: Horizontal Beam Profile Run 
Run Number: 72 
Events: 50000 
XYPosition:
Cooling: No 
Data: Good 

Trying to get a nice plot of the beam profile by only using the and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66 for details. 

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Producer.TLU Config Change:

  • AndMask=0x8 
Attachment 1: HW_072_002_Result.pdf  48 kB  Uploaded Thu Jun 11 11:40:36 2015
Attachment 2: HW_072_003_Result.pdf  49 kB  Uploaded Thu Jun 11 11:40:36 2015
Attachment 3: HW_072_000_Result.pdf  54 kB  Uploaded Thu Jun 11 11:43:13 2015
Attachment 4: HW_072_001_Result.pdf  55 kB  Uploaded Thu Jun 11 11:43:13 2015
ELOG V3.1.5-fc6679b