Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 2 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Jun 11 15:56:32 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 73, 20000, 7, No, Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 73

Mimosa Threshold 6

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Upstream FEI4 used, checking if alignment change helped

Entry  Thu Jun 11 11:42:39 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 012, , , Yes, Good 

cooled until about 400k after that room temp
pedestalrun 009
FIRRun005

sixlet calibration run with only ladders

[six]
lvl = 0, 255
lat = 97
sam = 50
grp = 8

Entry  Thu Jun 11 11:41:50 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 011, , , Yes, Good 

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

Entry  Wed Jun 10 21:36:25 2015, Benedikt Würkner, SVD3 (H6B), Horizontal Beam Profile Run, 72, 50000, 1, No, Good HW_072_002_Result.pdfHW_072_003_Result.pdfHW_072_000_Result.pdfHW_072_001_Result.pdf

Trying to get a nice plot of the beam profile by only using the and 3 (horizontal)  see http://elog.hephy.at/testbeam-SPS2015/66 for details. 

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Producer.TLU Config Change:

  • AndMask=0x8 
Entry  Wed Jun 10 20:54:36 2015, Benedikt Würkner, SVD3 (H6B), Residuals FE-I4 (Upstream), 59, , 10, No, Good run000059-fitter-residuals.pdf
 
Entry  Wed Jun 10 19:07:42 2015, Hao Yin, Belle II FADC (H6A), Hardware, 021, , 5, Yes, Good 

temp: in -23 out -20

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: BW

Entry  Wed Jun 10 19:05:04 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 71, 50000, 1, No, Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 71

Mimosa Threshold 6

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Downstream FEI4 used

Entry  Wed Jun 10 18:52:34 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 009, 10000, , Yes, Good temperature.PNG

temp: in -22 out -18,
FIRRun004,

Entry  Wed Jun 10 18:05:03 2015, Benedikt Würkner, SVD3 (H6B), FEI4 configuration, , , , No, Unknown 

There are two planes, one fixed upstream and one fixed downstream. 

CIS3WII_6 upstream and CIS2WI_IBL2 downstream.

They are configured using the pc in H6B which can be accessed via microsoft remote desktop from the network 192.168.5.x using the ip 192.168.5.6. 

The configuration files can be found in the folder "E:\ConfigurationCMS\" on the server and are named after the modules. 

Only one of the FEI4 detectors can be used at a time since they are of different generations (FEI4A and FEI4B) which can't be used at the same time with the available USB board. vnc

The configuration for EUDAQ needs to be adapted for the used module by changing the name of the configuration file. 

[Producer.USBpixI4]
SRAM_READOUT_AT = 5
SkipConfiguration = no
UseSingleBoardConfig = no
boards = 230
modules[230] = 1
#upstream
config_file = E:\ConfigurationCMS\CIS3_W11_06_thr1600_7to21ke_modified.cfg.root
#downstream:
#config_file = E:\ConfigurationCMS\CIS2_W02_IBL1_thr1600_7to14_modified.cfg.root
fpga_firmware = E:\icwiki_svn\USBPixI4\host\tags\release-5.3\config\usbpixi4.bit
lvl1_delay = 16
tlu_trigger_data_delay = 10

In my experience switching between the planes also requires a restart of the USBPix DAQ because apparently something is not working with the reload of a different config file afterwards. I had the phenomenon that the DAQ responded like it was working but the datastream was empty. Therefore always check the online monitor for hitmaps. 

Entry  Wed Jun 10 13:12:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 010, , , Yes, Good 

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

Entry  Wed Jun 10 12:04:27 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 007, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 20, 30
lat = 98
sam = 20
grp = 8

Entry  Wed Jun 10 12:03:53 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 006, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 20, 30
lat = 97
sam = 20
grp = 8

Entry  Wed Jun 10 11:19:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 005, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 0. frame

[six]
lvl = 20, 30
lat = 96
sam = 20
grp = 8

Entry  Wed Jun 10 10:40:24 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 004, , , No, Good 

room temp
pedestalrun 008
FIRRun004

max frame pos = 0. frame

[six]
lvl = 20, 30
lat = 95
sam = 20
grp = 8

Entry  Tue Jun 9 20:36:39 2015, Hao Yin, Belle II FADC (H6A), Hardware, 020, 62k, , No, Good 

room temp

FIRRun004, PedestalRun008
telescope alignment

Entry  Tue Jun 9 20:32:46 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 008, 10000, , No, Good 

Room temp, fir004

Entry  Tue Jun 9 20:30:37 2015, Hao Yin, Belle II FADC (H6A), FIR, 004, , , , Good 

FIR filer and ADC delay with all sensor and telescope.
Telescope alignment

Entry  Tue Jun 9 20:27:55 2015, Benedikt Würkner, SVD3 (H6B), Hardware FEI4, 68, 503505, 8, No, Unknown 

RUN WITH SVD3, telescope and FEI4

EUDET Run 68

Mimosa Threshold 6

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Entry  Tue Jun 9 16:22:59 2015, Benedikt Würkner, SVD3 (H6B), Beam Profile Results, 66 und 67, , 2, No, Good HW_066_002_Result.pdfHW_066_003_Result.pdfHW_067_000_Result.pdfHW_067_001_Result.pdf
 
Entry  Tue Jun 9 14:33:50 2015, Benedikt Würkner, SVD3 (H6B), Vertical Beam Profile Run, 67, 50000, 2, No, Unknown 

Trying to get a nice plot of the beam profile by only using the vertical PMT 0 (upstream vertical, the long one)  see http://elog.hephy.at/testbeam-SPS2015/66 for details. 

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Producer.TLU Config Change:

  • AndMask=0x1 
ELOG V3.1.5-fc6679b