Fri Oct 12 23:51:35 2012, Markus Friedl, common, Zimmernummer & Telefonnummern, , , , , Unknown
|
2nd week:
Markus: 38 - 420 (phone: 70 420)
Thomas: 38 - 431 (phone: 70 431) |
Fri Oct 12 23:52:57 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown
|
Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.) |
Sat Oct 13 06:55:47 2012, Manfred Valentan, MicronBaby, run, run002, 234019, 13.10.2012 06:50:00, 13.10.2012 13:50:40, Unknown
|
Micron baby stack
HV = -100V I=5.4uA
beam on |
Sat Oct 13 14:44:47 2012, Manfred Valentan, MicronOrigami_gross, Stack configuration, Belle Stack 3, , , , , Unknown
|
Module in Beamrichtung:
2-DSSD Origami -z
2-DSSD Origami ce |
Sat Oct 13 19:04:02 2012, Manfred Valentan, MicronOrigami_gross, run with Belle stack 3, run003, 30k, 13.10.2012 19:02:31, , Unknown
|
Belle stack 3: 2DSSD-Origami, Wedge_New_1, Wedge_old
HV = +- 50V
I_ges = 11.6 µA |
Sat Oct 13 19:04:23 2012, Markus Friedl, MicronOrigami_gross, CO2 cooling, , , , , Unknown
|
Wir haben ja schon seit langem vermutet, dass man mit reiner Gasphase nicht kühlen kann. Jetzt erbringen wir den experimentellen Beweis dafür.
Expandierendes Gas kühlt zwar auch, aber nicht so tief runter und vor allem sind beträchtliche Temperaturdifferenzen zwischen den einzelnen
Modulen zu beobachten. Das erste Origami bekommt etwa -13°C aber bis zum letzten Micron sind wir auf Raumtemperatur. |
Sat Oct 13 23:01:54 2012, Markus Friedl, MicronOrigami_gross, run with Belle stack 3, run004, 30k, 13.10.2012 21:41:34, 13.10.2012 22:57:48, Unknown
|
Belle stack 3, other position (CE)
Position of xy table: |
Sat Oct 13 23:04:22 2012, Markus Friedl, MicronOrigami_gross, cal, cal002, 83800, 13.10.2012 23:03:18, 13.10.2012 22:57:48, Unknown
|
Belle stack 3 (2-DSSD, Micron new, Micron old)
HV = +-50V I=10.5A
beam on CE sensor |
Sun Oct 14 02:00:12 2012, Manfred Valentan, MicronBaby, Configuration of intermediate stack, , , , , Unknown
|
Micron baby stack with every other strip connected to APV chips
n-side faces the beam, p-side not read out.
Channels counting from bottom to top |
Sun Oct 14 02:02:39 2012, Manfred Valentan, MicronBaby, run, run005, 300k, 14.10.2012 02:00:08, 14.10.2012 08:17:02, Unknown
|
Micron baby intermediate stack
HV = -100V I=6.3uA
beam on |
Sun Oct 14 08:25:10 2012, Manfred Valentan, MicronBaby, cal, cal003, 83800, 14.10.2012 08:21:46, 14.10.2012 08:51:58, Unknown
|
Micron baby intermediate stack
HV = -100 V
I = 6.9 uA |
Sun Oct 14 09:08:42 2012, Manfred Valentan, MicronBaby, run, run006, 300k, 14.10.2012 09:01:15, , Unknown
|
Micron baby intermediate stack
HV = -100V I=6.9uA
beam on |
Sun Oct 14 20:12:14 2012, Marko Dragicevic, Infineon, run, run007, 110k, 14.10.2012 20:07:12, 14.10.2012 21:04:12, Unknown
|
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V I=3uA
beam on |
Sun Oct 14 23:01:11 2012, Marko Dragicevic, Infineon, cal, cal004, 83800, 14.10.2012 21:44:00, 14.10.2012 21:03:00, Unknown
|
Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V I=3.1 uA |
Mon Oct 15 00:08:26 2012, Marko Dragicevic, Infineon, run, run008, 339075, 15.10.2012 01:49:33, 15.10.2012 08:04:24, Unknown
|
Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)
HV = 300V I=4uA
beam on |
Mon Oct 15 18:52:18 2012, Marko Dragicevic, MicronOrigami_gross, Stack configuration, Belle Stack 2, , , , , Unknown
|
Belle stack 2:
Modules:
Origami #4
Origami #3
Wedge new 1
Wedge old
n-Seite: Beam abgewand |
Mon Oct 15 19:21:56 2012, Marko Dragicevic, common, Beam settings and profile, , , , , Unknown
|
Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko): |
Mon Oct 15 22:13:28 2012, Marko Dragicevic, MicronOrigami_gross, cal ATTENTION: wrong bias voltage , cal005, 83800, 15.10.2012 22:16:26, 15.10.2012 23:07:37 , Unknown
|
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V |
Tue Oct 16 11:07:17 2012, Christian Irmler, MicronOrigami_gross, cal, cal006, 83800, 16.10.2012 10:30:34, 16.10.2012 11:00:51, Unknown
|
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA |
Tue Oct 16 11:23:43 2012, Christian Irmler, MicronOrigami_gross, run, run012, 20k, 16.10.2012 11:16:01, 16.10.2012 12:27:03 , Unknown
|
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA |
|