14
|
Sun Oct 14 02:02:39 2012 |
Manfred Valentan | MicronBaby | run | run005 | 300k | 14.10.2012 02:00:08 | 14.10.2012 08:17:02 | Unknown | Micron baby intermediate stack
HV = -100V I=6.3uA
beam on
Final DESY position (center of vertical beam profile)
Module position: 0 / -12.0 -- hitting the upper half of the sensor (centered on odd APVs) |
16
|
Sun Oct 14 09:08:42 2012 |
Manfred Valentan | MicronBaby | run | run006 | 300k | 14.10.2012 09:01:15 | | Unknown | Micron baby intermediate stack
HV = -100V I=6.9uA
beam on
Final DESY position (center of vertical beam profile)
Module position: 0 / -31.0 -- hitting the lower half of the sensor (centered on even APVs) |
17
|
Sun Oct 14 20:12:14 2012 |
Marko Dragicevic | Infineon | run | run007 | 110k | 14.10.2012 20:07:12 | 14.10.2012 21:04:12 | Unknown | Infineon Stack Version 1 (with height information, BabyStrips horizontal Strixel vertical)
HV = 300V I=3uA
beam on
Final DESY position (center of vertical beam profile)
Module position: 0 / 0 -- hitting the center of babies, between strixels
07_baby |
0,0 |
APV1 lower, APV2 upper |
Strixel 2 |
20,8 |
Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right |
Strixel 1 |
39,4 |
Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right |
12_baby |
60,6 |
APV1 lower, APV2 upper |
|
19
|
Mon Oct 15 00:08:26 2012 |
Marko Dragicevic | Infineon | run | run008 | 339075 | 15.10.2012 01:49:33 | 15.10.2012 08:04:24 | Unknown | Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)
HV = 300V I=4uA
beam on
Final DESY position (center of vertical beam profile)
Module position: 0 / 3 -- hitting upper part of baby and top strixels
07_baby |
0,0 |
APV1 lower, APV2 upper |
Strixel 2 |
20,8 |
Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right |
Strixel 1 |
39,4 |
Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right |
12_baby |
60,6 |
APV1 lower, APV2 upper |
|
27
|
Tue Oct 16 11:23:43 2012 |
Christian Irmler | MicronOrigami_gross | run | run012 | 20k | 16.10.2012 11:16:01 | 16.10.2012 12:27:03 | Unknown | Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA
Origami 3 and Wedge old are still installed in the box, but not read out --> disconnected
beam:
p-side: centered between APV 4&5
n-side: centered between APV 2&3
--> upper left corner of Origami and wedge module --> we hit the APV chips and / or the PA0 of the Origami module
no cooling
Temperatur sensors:
- T11: Origami #4 in
- T12: Origami #4 out
- T13: Origami #3 in (wrong values!)
- T14: Origami #3 out
- T15: Wedge new 1 out
- T16: Wedge old out
- T17: Wedge new 1 cooling block
- T18: Wedge old cooling block
|
Attachment 1: belle_2a_temperatures.jpg
|  |
28
|
Tue Oct 16 13:59:46 2012 |
Christian Irmler | MicronOrigami_gross | run | run013 | 150k | 16.10.2012 13:43:05 | 16.10.2012 20:21:04 | Unknown | Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=5.2µA
beam position:
vertical: between APV 1&2 (of 6)
horizontal: centered on APV#3 -> left side of sensor -> wide side of wedge sensors
Position of xy table:
x = 83, y = -31
Temperatur sensors:
- T11: Origami #4 in
- T12: Origami #4 out
- T13: Origami #3 in (wrong values!)
- T14: Origami #3 out
- T15: Wedge new 1 out
- T16: Wedge old out
- T17: Wedge new 1 cooling block
- T18: Wedge old cooling block
|
Attachment 1: belle_2_temperatures.jpg
|  |
31
|
Tue Oct 16 23:35:28 2012 |
Christian Irmler | MicronOrigami_gross | run | run014 | 150k | 16.10.2012 23:32:24 | 17.10.2012 04:59:02 | Unknown | Same as run011, but now with +- 50V bias voltage.
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-10V
Ibias=4.83µA
beam position:
vertical: between APV 1&2 (of 6)
horizontal: centered on APV#1 -> right side of sensor -> small side of wedge sensors
Position of xy table:
x = 23, y = -31
Temperatur sensors:
- T11: Origami #4 in
- T12: Origami #4 out
- T13: Origami #3 in (wrong values!)
- T14: Origami #3 out
- T15: Wedge new 1 out
- T16: Wedge old out
- T17: Wedge new 1 cooling block
- T18: Wedge old cooling block
|
Attachment 1: run014_temperatures.jpg
|  |
32
|
Wed Oct 17 01:21:50 2012 |
Marko Dragicevic | Infineon | run | run009 | 150k | 15.10.2012 08:20:15 | 15.10.2012 11:01:11 | Unknown | This run was not recorded in original sequence in the ELOG!!!
Infineon Stack Version 2 (no height information, BabyStrips vertical Strixel vertical)
HV = 300V I=4uA
beam on
Final DESY position (center of vertical beam profile)
Module position: 15 / 3 -- hitting lower part of baby and bottom strixels
07_baby |
0,0 |
APV1 lower, APV2 upper |
Strixel 2 |
20,8 |
Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right |
Strixel 1 |
39,4 |
Hybrid1/APV1 top-left, Hybrid1/APV2 top right, Hybrid2/APV1 bottom left, Hybrid2/APV2 bottom right |
12_baby |
60,6 |
APV1 lower, APV2 upper |
|
|
33
|
Wed Oct 17 05:16:22 2012 |
Christian Irmler | MicronOrigami_gross | run | run015 | 54005 | 17.10.2012 05:10:06 | 17.10.2012 07:27:20 | Unknown | Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=4.43µA
beam position:
vertical: between APV 1&2 (of 6)
horizontal: centered on APV#2 -> center of measureable area
Position of xy table:
x = 53, y = -31
Temperatur sensors:
- T11: Origami #4 in
- T12: Origami #4 out
- T13: Origami #3 in (wrong values!)
- T14: Origami #3 out
- T15: Wedge new 1 out
- T16: Wedge old out
- T17: Wedge new 1 cooling block
- T18: Wedge old cooling block
CO2 was empty @ 6 am. |
Attachment 1: run015_temperatures.JPG
|  |
37
|
Fri Oct 19 00:45:52 2012 |
Markus Friedl | MicronOrigami_gross | run | run016 | 11855 | 19.10.2012 00:24:05 | 19.10.2012 00:48:24 | Crap |
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Stack is now positioned on globally best performing position which should also enable reasonable tracking.
Trigger timing not perfect, needs adjustment (-1 CLK) -> new run |
38
|
Fri Oct 19 00:56:16 2012 |
Markus Friedl | MicronOrigami_gross | run | run017 | 197899 | 19.10.2012 00:54:21 | 19.10.2012 14:10:02 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=76A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Same as run016, but timing shifted by 1 CLK to better center the peak of the shaped wafeforms for subsequent fitting during analysis.
Beam was turned off around here:
19.10.2012 08:56:12 event=193394
So better ignore the last ~5000 events for analysis.
|
39
|
Fri Oct 19 19:25:29 2012 |
Markus Friedl | MicronOrigami_gross | run | run018 | 318756 | 19.10.2012 19:23:55 | 20.10.2012 10:27:11 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-50V, Ibias=77A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
beam went off (LINAC problem) around
20.10.2012 07:00:39 event=315937
So better ignore the last 3000 events during analysis. |
41
|
Sat Oct 20 11:40:13 2012 |
Markus Friedl | MicronOrigami_gross | run | run019 | 100000 | 20.10.2012 11:38:19 | 20.10.2012 19:20:51 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-45V, Ibias=72A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Several periods without beam during this run. |
42
|
Sat Oct 20 19:35:30 2012 |
Markus Friedl | MicronOrigami_gross | run | run020 | 300000 | 20.10.2012 19:34:19 | 21.10.2012 08:55:28 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-40V, Ibias=73A
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
|
45
|
Sun Oct 21 10:39:15 2012 |
Markus Friedl | MicronOrigami_gross | run | run021 | 100000 | 21.10.2012 10:37:26 | 21.10.2012 15:04:49 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-35V, Ibias=69uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
|
47
|
Sun Oct 21 16:04:06 2012 |
Markus Friedl | MicronOrigami_gross | run | run022 | 151282 | 21.10.2012 18:16:53 | 22.10.2012 00:04:42 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-30V, Ibias=70uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1 |
49
|
Mon Oct 22 00:57:05 2012 |
Markus Friedl | MicronOrigami_gross | run | run023 | 176629 | 22.10.2012 00:55:59 | 22.10.2012 10:04:38 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-25V, Ibias=65uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
No more events since 22.10.2012 07:09:53 event=176629 - spill signals removed?
|
51
|
Mon Oct 22 19:19:53 2012 |
Markus Friedl | MicronOrigami_gross | run | run024 | 260000 | 22.10.2012 19:18:16 | 23.10.2012 08:17:20 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-20V, Ibias=57uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
Beam shape on n side (horizontally) different than in previous runs. Number of triggers per spill is reduced to ~60k (was 200..250k before). Reason unknown. |
52
|
Tue Oct 23 08:22:42 2012 |
Markus Friedl | MicronOrigami_gross | run | run025 | 100000 | 23.10.2012 08:21:37 | 23.10.2012 13:47:09 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-15V, Ibias=47uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1 |
55
|
Tue Oct 23 16:06:09 2012 |
Markus Friedl | MicronOrigami_gross | run | run026 | 102124 | 23.10.2012 16:04:47 | 23.10.2012 23:04:56 | Unknown | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable. |
|
|