Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2012 and Irradiation Mol, Page 1 of 4  Not logged in ELOG logo
Entry  Fri Oct 12 15:04:55 2012, Marko Dragicevic, common, Network configuration, , , , , Unknown 
Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
Entry  Fri Oct 12 23:51:35 2012, Markus Friedl, common, Zimmernummer & Telefonnummern, , , , , Unknown 
2nd week:
Markus: 38 - 420   (phone: 70 420)
Thomas: 38 - 431   (phone: 70 431)
Entry  Fri Oct 12 23:52:57 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown 
Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.)
Entry  Mon Oct 15 19:21:56 2012, Marko Dragicevic, common, Beam settings and profile, , , , , Unknown NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko):
Entry  Tue Oct 16 23:03:09 2012, Markus Friedl, common, Sozialisierung, , , , , Unknown IMAG2041.jpgfondue.jpg
So steuert man einen Testbeam!
Entry  Thu Oct 18 09:14:07 2012, Manfred Valentan, common, Fahrt nach Mol, , , , , Unknown 
 Liebe Kollegen,
wir brechen. auf. Wünscht uns Glück!
Entry  Wed Oct 31 15:54:59 2012, Christian Irmler, common, Ethernetkabel zu H6A, , , , , Unknown 2012-10-31_15.47.42.jpg2012-10-31_12.28.32.jpg
Ethernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.
Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen
Entry  Sat Oct 13 14:44:47 2012, Manfred Valentan, MicronOrigami_gross, Stack configuration, Belle Stack 3, , , , , Unknown 
Module in Beamrichtung:
2-DSSD Origami  -z
2-DSSD Origami ce
Entry  Sat Oct 13 19:04:02 2012, Manfred Valentan, MicronOrigami_gross, run with Belle stack 3, run003, 30k, 13.10.2012 19:02:31, , Unknown 
 Belle stack 3: 2DSSD-Origami, Wedge_New_1, Wedge_old
HV = +- 50V
I_ges = 11.6 µA
Entry  Sat Oct 13 19:04:23 2012, Markus Friedl, MicronOrigami_gross, CO2 cooling, , , , , Unknown 
Wir haben ja schon seit langem vermutet, dass man mit reiner Gasphase nicht kühlen kann. Jetzt erbringen wir den experimentellen Beweis dafür.
Expandierendes Gas kühlt zwar auch, aber nicht so tief runter und vor allem sind beträchtliche Temperaturdifferenzen zwischen den einzelnen
Modulen zu beobachten. Das erste Origami bekommt etwa -13°C aber bis zum letzten Micron sind wir auf Raumtemperatur.
Entry  Sat Oct 13 23:01:54 2012, Markus Friedl, MicronOrigami_gross, run with Belle stack 3, run004, 30k, 13.10.2012 21:41:34, 13.10.2012 22:57:48, Unknown 
Belle stack 3, other position (CE)
 
Position of xy table:
Entry  Sat Oct 13 23:04:22 2012, Markus Friedl, MicronOrigami_gross, cal, cal002, 83800, 13.10.2012 23:03:18, 13.10.2012 22:57:48, Unknown 
Belle stack 3 (2-DSSD, Micron new, Micron old)
HV = +-50V   I=10.5A 
beam on CE sensor
Entry  Mon Oct 15 18:52:18 2012, Marko Dragicevic, MicronOrigami_gross, Stack configuration, Belle Stack 2, , , , , Unknown 
Belle stack 2:
Modules:

    Origami #4
    Origami #3
    Wedge new 1
    Wedge old

n-Seite: Beam abgewand
Entry  Mon Oct 15 19:40:03 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run009, 31650, 15.10.2012 19:28:30 , 15.10.2012 22:08:31 , Crap 
ATTENTION! Bias voltage was +-100 V instead of +-50 V 
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Mon Oct 15 22:13:28 2012, Marko Dragicevic, MicronOrigami_gross, cal ATTENTION: wrong bias voltage , cal005, 83800, 15.10.2012 22:16:26, 15.10.2012 23:07:37 , Unknown 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Mon Oct 15 23:26:52 2012, Marko Dragicevic, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run010, 158k, 15.10.2012 23:10:40 , 16.10.2012 05:05:35, Crap 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Same as run009.
Origami Stack 2: Origami #4, #3, Wedge new1, old
Entry  Tue Oct 16 05:24:21 2012, Christian Irmler, MicronOrigami_gross, run ATTENTION: wrong bias voltage, run011, 150k, 16.10.2012 05:19:28 , 16.10.2012 09:59:24, Crap 
ATTENTION: Bias voltage was +-100 V instead of +- 50 V
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-100V
Entry  Tue Oct 16 11:07:17 2012, Christian Irmler, MicronOrigami_gross, cal, cal006, 83800, 16.10.2012 10:30:34, 16.10.2012 11:00:51, Unknown 
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=5.12µA
Entry  Tue Oct 16 11:23:43 2012, Christian Irmler, MicronOrigami_gross, run, run012, 20k, 16.10.2012 11:16:01, 16.10.2012 12:27:03 , Unknown belle_2a_temperatures.jpg
Origami Stack 2a: Origami #4, Wedge new1
reading out all 6 APV of p-side
HV = +-40V, Ibias=10.4µA
Entry  Tue Oct 16 13:59:46 2012, Christian Irmler, MicronOrigami_gross, run, run013, 150k, 16.10.2012 13:43:05, 16.10.2012 20:21:04, Unknown belle_2_temperatures.jpg
Origami Stack 2: Origami #4, #3, Wedge new1, old
HV = +-50V
Ibias=5.2µA
ELOG V3.1.5-fc6679b