Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 4 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Datedown Author Project Subject Run Number Events StartTime EndTime Data Text Attachments
  34   Wed Oct 5 16:43:00 2011 Christian IrmlerBELLEOrigami stack cooledcal0068380005.10.2011 16:40:1805.10.2011 17:12:27GoodOrigami6
HV=+-40V
beam on
  
  33   Wed Oct 5 13:00:41 2011 Christian IrmlerBELLEOrigami stack cooled run0062469205.10.2011 12:55:5305.10.2011 14:05:49CrapRun stopped after 24692 events,
because all n-side APV failed due to a shortcut
of a capacitor (C223) on n-side rebo
  
  32   Wed Oct 5 12:09:00 2011 Christian IrmlerBELLEOrigami stack cooled wrong I2C settingscal0058380005.10.2011 12:04:5005.10.2011 12:37:11CrapThis calibration file can not be
used, due to wrong I2C settings!
Origami6
  
  31   Tue Oct 4 22:11:12 2011 Christian IrmlerBELLEOrigami stackrun00533000004.10.2011 22:09:3705.10.2011 09:11:54CrapOrigami6
HV=+-40V, no cooling
beam on
  
  30   Tue Oct 4 21:40:52 2011 Christian IrmlerBELLEOrigami stackcal0048380004.10.2011 21:18:0904.10.2011 21:50:23GoodOrigami6
HV=+-40V, no cooling
beam on
  
  29   Tue Oct 4 15:16:45 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom right NOT USABLErun004200k4.10.2011 15:28:4804.10.2011 19:36:50CrapHAS TO BE REPEATED!!! Before this run there
were changes in the trigger line (vetoing
the trigger when no spill), and thus the
  
  28   Tue Oct 4 15:16:06 2011 Manfred ValentanMicronMicron-Baby-Stack p-spray, run bottom leftrun003200k04.10.2011 11:29:1904.10.2011 13:57:54Goodhit modules in bottom left corner ->
Zones wide and half-wide for COMB_IRRAD,
Zones narrow and half-narrow for BOMM_IRRAD
  
  27   Tue Oct 4 10:47:59 2011 Manfred ValentanMicronInternal Calibrationcal0018380003.10.2011 20:34:4803.10.2011 20:50:57 micronbaby p-stop stack
HV = -100V
beam on
  
  26   Tue Oct 4 10:44:48 2011 Christian IrmlerMicronInternal Calibrationcal0038380004.10.2011 10:33:5004.10.2011 10:48:51 micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
  
  25   Tue Oct 4 10:44:09 2011 Christian IrmlerMicronInternal Calibrationcal0028380004.10.2011 10:04:4904.10.2011 10:19:41 micronbaby p-spray/irrad
HV = -100V
beam on,
  
  24   Tue Oct 4 00:11:31 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, zones w & h-wrun00276000004.10.2011 00:11:0604.10.2011 09:01:06Goodhit modules in bottom left corner ->
Zones wide and half-wide for all modules
Position of HEPHY x-z-table:
  
  23   Mon Oct 3 21:08:27 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, configuration     Photo of hand-drawn stack configuration,
config files
 Micron-Baby-Stack_p-stop.pngcern11_micronbaby_pstop_single.cfgcern11_micronbaby_pstop_multi6.cfg 
  22   Mon Oct 3 21:01:00 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, zones n & h-nrun001200k03.10.2011 20:54:2203.10.2011 23:25:47Goodhit modules in top right corner -> Zones
narrow and half-narrow for all modules
Position of HEPHY x-z-table:
  
  21   Mon Oct 3 20:30:14 2011 Thomas BergauercommonXY Tisch     Grosser (DESY) Tisch:  x = -342.0   
y = 343.0  (Einheiten unbekannt, möglicherweise
mm)
 xy-tisch-control.JPGdesy_xy_table.jpg 
  20   Mon Sep 19 17:47:50 2011 Manfred ValentanMicronModule COMM-IRRAD     Sensor: B2Micron_2826_07_Baby2 (reused
from last year, was DUT3, module is irradiated
to 700 kGy)
  
  19   Mon Sep 19 17:47:11 2011 Manfred ValentanMicronModule COMB-IRRAD     Sensor: B2Micron_2826_19_Baby4 (reused
from last year, was DUT4, module is irradiated
to 700 kGy)
  
  18   Mon Sep 19 17:46:07 2011 Manfred ValentanMicronModule ATOLL-1     Sensor: B2Micron_2826_07_Baby3 (reused
from last year, but was not used in beam
test SPS2010) 
  
  17   Mon Sep 19 17:44:39 2011 Manfred ValentanMicronModule COMB-1     Sensor: B2Micron_2826_01_Baby4 (reused
from last year, was TRK6)
p-stop: Combined, with intermediate
  
  16   Mon Sep 19 17:44:00 2011 Manfred ValentanMicronModule COMM-1     Sensor: B2Micron_2826_19_Baby2 (reused
from last year, was TRK7)
p-stop: Common, with intermediate
  
  15   Mon Sep 19 17:42:39 2011 Manfred ValentanMicronModule SPRAY-I-1     Sensor: B2Micron_2825_15_Baby2
p-stop: p-spray WITH intermediate
strips
  
ELOG V3.1.5-fc6679b