Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 4 of 5  Not logged in ELOG logo
Entry  Wed Oct 5 16:43:00 2011, Christian Irmler, BELLE, Origami stack cooled, cal006, 83800, 05.10.2011 16:40:18, 05.10.2011 17:12:27, Good 
Origami6
HV=+-40V
beam on
Entry  Wed Oct 5 13:00:41 2011, Christian Irmler, BELLE, Origami stack cooled , run006, 24692, 05.10.2011 12:55:53, 05.10.2011 14:05:49, Crap 
Run stopped after 24692 events, because all n-side APV failed due to a shortcut of a capacitor (C223) on n-side rebo
Origami6
HV=+-40V
Entry  Wed Oct 5 12:09:00 2011, Christian Irmler, BELLE, Origami stack cooled wrong I2C settings, cal005, 83800, 05.10.2011 12:04:50, 05.10.2011 12:37:11, Crap 
This calibration file can not be used, due to wrong I2C settings!
Origami6
HV=+-40V
Entry  Tue Oct 4 22:11:12 2011, Christian Irmler, BELLE, Origami stack, run005, 330000, 04.10.2011 22:09:37, 05.10.2011 09:11:54, Crap 
Origami6
HV=+-40V, no cooling
beam on
Entry  Tue Oct 4 21:40:52 2011, Christian Irmler, BELLE, Origami stack, cal004, 83800, 04.10.2011 21:18:09, 04.10.2011 21:50:23, Good 
Origami6
HV=+-40V, no cooling
beam on
Entry  Tue Oct 4 15:16:45 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom right NOT USABLE, run004, 200k, 4.10.2011 15:28:48, 04.10.2011 19:36:50, Crap 
HAS TO BE REPEATED!!! Before this run there were changes in the trigger line (vetoing the trigger when no spill), and thus the timing is incorrect.
hit modules in bottom right corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
Position of HEPHY x-z-table:
Entry  Tue Oct 4 15:16:06 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-spray, run bottom left, run003, 200k, 04.10.2011 11:29:19, 04.10.2011 13:57:54, Good 
hit modules in bottom left corner -> Zones wide and half-wide for COMB_IRRAD, Zones narrow and half-narrow for BOMM_IRRAD
Position of HEPHY x-z-table:
x = 336
Entry  Tue Oct 4 10:47:59 2011, Manfred Valentan, Micron, Internal Calibration, cal001, 83800, 03.10.2011 20:34:48, 03.10.2011 20:50:57,  
micronbaby p-stop stack
HV = -100V
beam on
Entry  Tue Oct 4 10:44:48 2011, Christian Irmler, Micron, Internal Calibration, cal003, 83800, 04.10.2011 10:33:50, 04.10.2011 10:48:51,  
micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
Entry  Tue Oct 4 10:44:09 2011, Christian Irmler, Micron, Internal Calibration, cal002, 83800, 04.10.2011 10:04:49, 04.10.2011 10:19:41,  
micronbaby p-spray/irrad
HV = -100V
beam on,
Entry  Tue Oct 4 00:11:31 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones w & h-w, run002, 760000, 04.10.2011 00:11:06, 04.10.2011 09:01:06, Good 
hit modules in bottom left corner -> Zones wide and half-wide for all modules
Position of HEPHY x-z-table:
x = 336
Entry  Mon Oct 3 21:08:27 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, configuration, , , , ,  Micron-Baby-Stack_p-stop.pngcern11_micronbaby_pstop_single.cfgcern11_micronbaby_pstop_multi6.cfg
Photo of hand-drawn stack configuration, config files
Entry  Mon Oct 3 21:01:00 2011, Manfred Valentan, Micron, Micron-Baby-Stack p-stop, zones n & h-n, run001, 200k, 03.10.2011 20:54:22, 03.10.2011 23:25:47, Good 
hit modules in top right corner -> Zones narrow and half-narrow for all modules
Position of HEPHY x-z-table:
x = 324
Entry  Mon Oct 3 20:30:14 2011, Thomas Bergauer, common, XY Tisch, , , , ,  xy-tisch-control.JPGdesy_xy_table.jpg
Grosser (DESY) Tisch:  x = -342.0    y = 343.0  (Einheiten unbekannt, möglicherweise mm)
Raten-Scan siehe gescannter Zettel im Attachment.
 
Entry  Mon Sep 19 17:47:50 2011, Manfred Valentan, Micron, Module COMM-IRRAD, , , , ,  
Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)
p-stop: Common, with intermediate strips, irradiated
Hybrid p-side: H41
Entry  Mon Sep 19 17:47:11 2011, Manfred Valentan, Micron, Module COMB-IRRAD, , , , ,  
Sensor: B2Micron_2826_19_Baby4 (reused from last year, was DUT4, module is irradiated to 700 kGy)
p-stop: Combined, with intermediate strips, irradiated
Hybrid p-side: H48
Entry  Mon Sep 19 17:46:07 2011, Manfred Valentan, Micron, Module ATOLL-1, , , , ,  
Sensor: B2Micron_2826_07_Baby3 (reused from last year, but was not used in beam test SPS2010) 
p-stop: Atoll, with intermediate strips
Hybrid p-side: H40
Entry  Mon Sep 19 17:44:39 2011, Manfred Valentan, Micron, Module COMB-1, , , , ,  
Sensor: B2Micron_2826_01_Baby4 (reused from last year, was TRK6)
p-stop: Combined, with intermediate strips
Hybrid p-side: H45
Entry  Mon Sep 19 17:44:00 2011, Manfred Valentan, Micron, Module COMM-1, , , , ,  
Sensor: B2Micron_2826_19_Baby2 (reused from last year, was TRK7)
p-stop: Common, with intermediate strips
Hybrid p-side: H46
Entry  Mon Sep 19 17:42:39 2011, Manfred Valentan, Micron, Module SPRAY-I-1, , , , ,  
Sensor: B2Micron_2825_15_Baby2
p-stop: p-spray WITH intermediate strips
Hybrid p-side: MB1
ELOG V3.1.5-fc6679b