Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 3 of 5  Not logged in ELOG logo
ID Date Author Project Subject Run Numberdown Events StartTime EndTime Data Text Attachments
  22   Mon Oct 3 21:01:00 2011 Manfred ValentanMicronMicron-Baby-Stack p-stop, zones n & h-nrun001200k03.10.2011 20:54:2203.10.2011 23:25:47Goodhit modules in top right corner -> Zones
narrow and half-narrow for all modules
Position of HEPHY x-z-table:
  
  94   Wed Mar 7 16:58:36 2012 Christian IrmlerBELLEOrigami Module #4cal113100k07.03.2012 16:40:04 07.03.2012 16:57:08UnknownSr90, small (new) scintillator, new trigger
unit
Origami Mod. #4
  
  92   Wed Mar 7 15:44:25 2012 Christian IrmlerBELLEOrigami Module #4cal1128380007.03.2012 15:42:53 UnknownSr90, small (new) scintillator, new trigger
unit
Origami Mod. #4
  
  89   Mon Mar 5 19:06:41 2012 Christian IrmlerBELLEOrigami Module #4cal1108380005.03.2012 19:05:5205.03.2012 19:17:01UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
  
  87   Mon Mar 5 18:08:02 2012 Christian IrmlerBELLEOrigami Module #4cal1098380005.03.2012 18:07:4005.03.2012 18:18:32UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
  
  85   Mon Mar 5 17:35:31 2012 Christian IrmlerBELLEOrigami Module #4cal1088380005.03.2012 16:47:5105.03.2012 17:05:16UnknownSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
 run108-109.jpg 
  80   Wed Feb 22 17:25:34 2012 Christian IrmlerBELLEOrigami Module #4cal1058380022.02.2012 17:23:13 22.02.2012 17:34:27GoodSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
  
  79   Wed Feb 22 16:49:29 2012 Christian IrmlerBELLEOrigami Module #4cal1048380022.02.2012 16:51:1322.02.2012 17:02:11GoodSr90, large scintillator, 
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
  
  76   Wed Feb 22 13:17:34 2012 Christian IrmlerBELLEOrigami Module #4cal1028380022.02.2012 13:11:3022.02.2012 13:25:18GoodSr90, large scintillator, HVret @ Origami
open
Origami Mod. #4
  
  73   Mon Feb 20 17:20:20 2012 Christian IrmlerBELLEOrigami Module #4cal10050k20.02.2012 17:19:0320.02.2012 17:29:58GoodSr90, large scintillator, HVret @ Origami
open
Origami Mod. #4
  
  69   Mon Oct 10 21:55:30 2011 Marko DragicevicMicronInternal Calibrationcal0138380010.10.2011 21:52:32 Unknownmicronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced
  
  62   Mon Oct 10 10:37:52 2011 Christian IrmlerCNMCNM stackcal0128380010.10.2011 11:29:5510.10.2011 11:40:55Unknownno cooling
beam on; xy table position x=330 
y=64
  
  56   Sun Oct 9 10:13:11 2011 Karl-Heinz HoffmannHPKbaby_addcal0118380009.10.2011 10:05:01 Goodno cooling
beam on; xy table position x= 
y=
  
  55   Sun Oct 9 10:05:34 2011 Markus FriedlHPKbaby_stdcal0108380008.10.2011 13:36:2508.10.2011 13:54:07GoodHV=+-40V, 
no cooling
beam off; xy table position x= 
  
  46   Fri Oct 7 18:40:07 2011 Christian IrmlerBELLEOrigami stack cooledcal0098380007.10.2011 18:35:04 07.10.2011 19:31:51GoodOrigami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9
  
  41   Thu Oct 6 15:57:51 2011 Christian IrmlerBELLEOrigami stack cooledcal0088380006.10.2011 15:53:2006.10.2011 16:25:29 GoodHV=+-40V, 
CO2 cooling: P_TT_4: 18.2 bar, mf=1
g/s
  
  35   Wed Oct 5 17:54:09 2011 Christian IrmlerBELLEOrigami stack cooledcal0078380005.10.2011 17:51:57  GoodI2C setting modified to improve the shape
of the p-side signal --> shaping time
reduced, pulse height still low
  
  34   Wed Oct 5 16:43:00 2011 Christian IrmlerBELLEOrigami stack cooledcal0068380005.10.2011 16:40:1805.10.2011 17:12:27GoodOrigami6
HV=+-40V
beam on
  
  32   Wed Oct 5 12:09:00 2011 Christian IrmlerBELLEOrigami stack cooled wrong I2C settingscal0058380005.10.2011 12:04:5005.10.2011 12:37:11CrapThis calibration file can not be
used, due to wrong I2C settings!
Origami6
  
  30   Tue Oct 4 21:40:52 2011 Christian IrmlerBELLEOrigami stackcal0048380004.10.2011 21:18:0904.10.2011 21:50:23GoodOrigami6
HV=+-40V, no cooling
beam on
  
ELOG V3.1.5-fc6679b