Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 6 of 8  Not logged in ELOG logo
ID Date Author Projectdown Subject Run Number Events StartTime EndTime
  61   Sat Oct 2 18:36:57 2010 Markus FriedlITErunrun02816226302.10.2010 18:34:0603.10.2010 08:11:13

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

 short break ~2.10.2010 20:00 (beam off for a couple of minutes for access by marcos)

telescope run 20126

  62   Sun Oct 3 08:14:39 2010 Markus FriedlITEcalcal0088380003.10.2010 08:13:06 

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

no beam (technical problem)

  63   Sun Oct 3 08:19:13 2010 Markus FriedlITErunrun0297500003.10.2010 08:33:2803.10.2010 10:50:27

same as previous run

telescope run 20127

Configuration file for DAQ: cern10_ite_silc_single.cfg --> peak mode with 1 sample!

  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:44

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

  52   Fri Oct 1 23:18:34 2010 Markus FriedlCNMrunrun022813901.10.2010 23:17:02 01.10.2010 23:45:51

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

not optimized alignment 

telescope run 20118

  53   Fri Oct 1 23:50:28 2010 Thomas BergauerCNMrunrun023227501.10.2010 23:49:2901.10.2010 23:53:12

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

too much optimized alignment (XY-table to 133/74/187.5)   ;-)

telescope run 20119

  54   Fri Oct 1 23:55:12 2010 Thomas BergauerCNMrunrun024320k01.10.2010 23:53:1202.10.2010 09:47:37

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

optimized alignment (XY-table to 133/76/187.5)

telescope run 20120

  55   Sat Oct 2 09:57:20 2010 Thomas BergauerCNMrunrun025150k02.10.2010 09:54:2802.10.2010 14:21:20

 CMN-SILC stack

HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

new position along the CNM strips (XY-table to 143/76/187.5)

telescope run 20122

 

  64   Sun Oct 3 14:35:12 2010 Marko DragicevicCNMcalcal0098380003.10.2010 13:50:54 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
DUT outside of beam

calibration started after 1 hour warmup

  12   Fri Sep 24 12:09:32 2010 Manfred ValentanBELLEgds-file of Micron wafer    
  16   Mon Sep 27 18:54:47 2010 Thomas BergauerBELLEXY Position    

center position: 55/40/277,5

  17   Tue Sep 28 01:13:57 2010 Markus FriedlBELLEcalcal0018380028.09.2010 01:11:20 

first intcal with complete Belle stack: 2 x Origami, 2 x Micron

HV=100V  I=49uA

beam is on

chiller is set to 15°C (module temperature is ~17°C)

both Origamis and both Microns are serially cooled

  18   Tue Sep 28 03:06:31 2010 Markus FriedlBELLErunrun00111951628.09.2010 03:06:0428.09.2010 12:18:33

first run with complete Belle stack: 2 x Origami, 2 x Micron

HV=100V  I=49uA

beam is on

chiller is set to 15°C (module temperature is ~17°C)

both Origamis and both Microns are serially cooled

 

position:centered in both axes  55 / 30 / 277.5

 

telescope: run20076 (in zero suppressed mode)

  19   Tue Sep 28 12:54:33 2010 Markus FriedlBELLErunrun002 28.09.2010 12:46:54 

same as run001 after shifting x by 48mm

103 / 30 / 277.5 ? unsure after crash of xy stage PC

  20   Tue Sep 28 13:04:02 2010 Markus FriedlBELLErunrun0032500028.09.2010 13:00:0528.09.2010 14:41:14

now for real (previous run was at wrong position)

all same as run001, except position now still centered on p-strips, but on high edge (last APVs) for n side

position: 103 / 30 / 277.5

corresponds to telescope run 20078

  21   Tue Sep 28 14:38:24 2010 Christian IrmlerBELLETemperature sensors Belle stack    

PicoLogic TC-08 temperature sensor assignment Belle stack:

Sensor type: K

channel 1:  Origami_mod1_in
channel 2:  Origami_mod1_out
channel 3:  Origami_mod2_in
channel 4:  Origami_mod2_out
channel 5:  Micron_wedge_mod1_p
channel 6:  Micron_wedge_mod1_n
channel 7:  Micron_wedge_mod2_p
channel 8:  Micron_wedge_mod2_n
 

The cooling pipes of the two Origami modules and that of the Micron modules are connected in series, respectively.

  22   Tue Sep 28 14:48:00 2010 Markus FriedlBELLErunrun004175528.09.2010 14:48:2828.09.2010 15:06:31

same as before, but now pos 1 is located on the other edge (-48mm from center)

telescope 7 / 30 / 277.5

telescope run 20079

  23   Tue Sep 28 15:09:16 2010 Markus FriedlBELLErunrun0054000028.09.2010 15:07:0828.09.2010 20:20:12

previous run stopped due to beam problem (shifted, broad, etc).

now recovered, restarting with same settings.

 

telescope run: 20080

  25   Tue Sep 28 22:07:16 2010 Markus FriedlBELLEcalcal002 DO NOT USE -> go to cal0038380028.09.2010 22:01:55 

Belle stack (Origami, Micron, Micron, Origami)

now cooling only for Origami, Micron are uncooled

chiller set point: -25°C, measured values on Origami: -10°C

HV=100V, Ibias=38µA, beam off

modified I2C settings for cold modules

temperature monitoring: Origami2 pipes in<->out swapped (to achieve shorter tubes)

 

PROBLEM: Origami n channels are swapped -> USE cal003 INSTEAD!!!

ELOG V3.1.5-fc6679b