Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 5 of 8  Not logged in ELOG logo
Entry  Thu May 19 11:02:08 2011, Manfred Valentan, Micron Baby, DUT4, source run, irrad, postzupf, cal119, 83800, 19.05.2011 09:57:57, 19.05.2011 10:06:06 cal119_goodstrips_apv4.pngcal119_goodstrips_apv5.png
DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/postzupf/micronbaby_single_irrad_postzupf.cfg
HV=+-50V
Entry  Thu May 19 11:04:04 2011, Manfred Valentan, Micron Baby, DUT4, source run, irrad, postzupf, run119, 100k, 19.05.2011 10:08:14, 19.05.2011 10:29:02 6x
DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/postzupf/micronbaby_multi6_irrad_postzupf.cfg
HV=+-50V
Entry  Thu May 19 11:06:41 2011, Manfred Valentan, Micron Baby, DUT4, source run, irrad, prezupf, run114, 100k, 18.05.2011 11:57:13, 18.05.2011 12:13:12 cal114_pednoise_apv4.pngcal114_pednoise_apv5.png
DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/prezupf/micronbaby_multi6_irrad.cfg
HV=+-50V
Entry  Wed Sep 15 10:25:13 2010, Marko Dragicevic, common, Equipment List, , , ,  
[B]Slow Control:[/B]
3x Source Measurement Unit Keithley K2410
-- Inv.Nr.: 540-702, 1000EUR
Entry  Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,  cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Mon Oct 4 10:43:45 2010, Marko Dragicevic, Pt, run, run036, 25600, 04.10.2010 10:33:05, 04.10.2010 11:35:51 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=24.9A h02=12.5A
Entry  Wed Oct 6 10:15:26 2010, Marko Dragicevic, Micron Baby, XY Positions After Irradiation, , , ,  
center position: 119/50/(7.5)
top left (direction jura, bottom right on sensor): 127/56.5/7.5
bottom right (direction saleve, top left on sensor): 111/43.5/7.5
Entry  Wed Oct 6 11:03:59 2010, Marko Dragicevic, Micron Baby, cal, cal013, 83800, 06.10.2010 11:03:12,  
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off
Entry  Wed Oct 6 23:02:09 2010, Marko Dragicevic, common, Beam Configuration, , , ,  BeamProfile.gifBeamMagnets.gifBeamColli.gif
Beam Settings and Profile on 5.10.2010 - 17:00h
Saved as: H6B.801
Entry  Wed Oct 6 23:03:15 2010, Marko Dragicevic, BELLE, cal, cal014, 83800, 06.10.2010 23:01:56, 06.10.2010 23:34:07 
Belle stack without Origami2
HV=80V I=227uA
beam on
Entry  Tue Sep 28 01:13:57 2010, Markus Friedl, BELLE, cal, cal001, 83800, 28.09.2010 01:11:20,  
first intcal with complete Belle stack: 2 x Origami, 2 x Micron
HV=100V  I=49uA
beam is on
Entry  Tue Sep 28 03:06:31 2010, Markus Friedl, BELLE, run, run001, 119516, 28.09.2010 03:06:04, 28.09.2010 12:18:33 
first run with complete Belle stack: 2 x Origami, 2 x Micron
HV=100V  I=49uA
beam is on
Entry  Tue Sep 28 12:54:33 2010, Markus Friedl, BELLE, run, run002, , 28.09.2010 12:46:54,  
same as run001 after shifting x by 48mm
103 / 30 / 277.5 ? unsure after crash of xy stage PC
Entry  Tue Sep 28 13:04:02 2010, Markus Friedl, BELLE, run, run003, 25000, 28.09.2010 13:00:05, 28.09.2010 14:41:14 
now for real (previous run was at wrong position)
all same as run001, except position now still centered on p-strips, but on high edge (last APVs) for n side
position: 103 / 30 / 277.5
Entry  Tue Sep 28 14:48:00 2010, Markus Friedl, BELLE, run, run004, 1755, 28.09.2010 14:48:28, 28.09.2010 15:06:31 
same as before, but now pos 1 is located on the other edge (-48mm from center)
telescope 7 / 30 / 277.5
telescope run 20079
Entry  Tue Sep 28 15:09:16 2010, Markus Friedl, BELLE, run, run005, 40000, 28.09.2010 15:07:08, 28.09.2010 20:20:12 
previous run stopped due to beam problem (shifted, broad, etc).
now recovered, restarting with same settings.
 
Entry  Tue Sep 28 22:07:16 2010, Markus Friedl, BELLE, cal, cal002 DO NOT USE -> go to cal003, 83800, 28.09.2010 22:01:55,  
Belle stack (Origami, Micron, Micron, Origami)
now cooling only for Origami, Micron are uncooled
chiller set point: -25°C, measured values on Origami: -10°C
Entry  Tue Sep 28 22:09:39 2010, Markus Friedl, BELLE, Temperature sensors Belle stack, , , ,  
PicoLogic TC-08 temperature sensor assignment Belle stack:
Sensor type: K
channel 1:  Origami_mod1_in
Entry  Tue Sep 28 23:23:47 2010, Markus Friedl, BELLE, run, run006, 2003, 28.09.2010 23:13:22, 28.09.2010 23:22:26 
channels swapped -> stopped
Entry  Tue Sep 28 23:24:35 2010, Markus Friedl, BELLE, run, run007, 1460, 28.09.2010 23:23:29, 28.09.2010 23:27:54 
Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=38A, beam on
cooling: Origami only, chiller: -25C, Module: -10C
ELOG V3.1.5-fc6679b