Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 3 of 8  Not logged in ELOG logo
Entry  Thu Sep 30 10:56:34 2010, Christian Irmler, common, Room numbers, , , ,  

Room and telefone numbers.

 

Name Building Room Tel.
Bergi 38 418 70 418 or 162471 (mobile)
Markus 41 021 60 021
Manfred 38 404 70 404
Erik 38 463 70 463
Immanuel 38 313 70 313
Chrisu 39 324

79 324

Marko 39 007 79 007
Paqui 38 107 70 107

 

Entry  Thu Sep 30 14:45:16 2010, Thomas Bergauer, Micron Baby, run, run015, 22.5k, 30.09.2010 13:18:11, 30.09.2010 14:38:01 

micron baby stack angle scan 15 grad mit 3 modulen

HV=100V, I=3.8uA

Beam on

 

telescope position: 129/76/187.5

telescope run 20109

Entry  Thu Sep 30 15:06:28 2010, Markus Friedl, Micron Baby, cal, cal006, 83800, 30.09.2010 15:01:56,  

micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
 

Entry  Thu Sep 30 15:39:53 2010, Markus Friedl, Micron Baby, run, run016, 31k, 30.09.2010 15:38:26, 30.09.2010 17:44:36 eventdisplay_schoen.pngevent_display_nichsoschoen.png

micron baby: 4 DUTs
HV=100V I=10.3uA (start of run);  I=16.2uA (end of run)
Beam on

 reference run @ 0°

telescope run 20110

Entry  Thu Sep 30 18:12:53 2010, Markus Friedl, Micron Baby, run, run017, 35000, 30.09.2010 18:11:53, 30.09.2010 20:22:43 number_of_clusters_telescope.png

micron baby: 4 DUTs
HV=100V I=13.5uA, I_stop=17uA
Beam on
15° rotation

telescope run 20111

Entry  Thu Sep 30 20:47:01 2010, Markus Friedl, Micron Baby, run, run018, 26938, 30.09.2010 20:45:48, 30.09.2010 22:25:25 

micron baby: 4 DUTs
HV=100V I=13.7uA, I_stop=15.6uA
Beam on
30° rotation

 

telescope run  20112

Entry  Thu Sep 30 23:09:29 2010, Thomas Bergauer, Micron Baby, run, run019, 162000, 30.09.2010 23:08:03, 01.10.2010 9:33:38 run019_sensordisplay1.jpgEudet-X_Cluster_Corr-run020115.jpgEudet-Num_Clusters-run020115.jpg

micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on
45° rotation

 

telescope run  20115 (after JTAG programming of telescope chips due to config errors)


Entry  Fri Oct 1 09:33:45 2010, Immanuel Gfall, common, Eudet Hit Correlation, Num Clusters Screenshots, 20115, 161135, 9:30, 9:30 Eudet-Num_Clusters-run020115.jpgEudet-X_Cluster_Corr-run020115.jpg

Eudet-Num_Clusters-run020115.jpg

[IMG]49/2[/IMG]

Entry  Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05 

micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation

Teleskop nicht neu gestartet, machma nochamal

Entry  Fri Oct 1 10:06:59 2010, Manfred Valentan, Micron Baby, run, run021, 75000, 01.10.2010 10:07:37, 01.10.2010 15:24:44 run021_sensordisplay1.jpghit_map_und_cluster.png

micron baby: 4 DUTs
HV=100V I=10.9uA (beginning)  13.6uA (end of run)
Beam on
60° rotation

 telescope run  20116

Entry  Fri Oct 1 23:18:34 2010, Markus Friedl, CNM, run, run022, 8139, 01.10.2010 23:17:02 , 01.10.2010 23:45:51 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

not optimized alignment 

telescope run 20118

Entry  Fri Oct 1 23:50:28 2010, Thomas Bergauer, CNM, run, run023, 2275, 01.10.2010 23:49:29, 01.10.2010 23:53:12 

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

too much optimized alignment (XY-table to 133/74/187.5)   ;-)

telescope run 20119

Entry  Fri Oct 1 23:55:12 2010, Thomas Bergauer, CNM, run, run024, 320k, 01.10.2010 23:53:12, 02.10.2010 09:47:37 cnm_2d_2.pngcnm_2d_1.png

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

optimized alignment (XY-table to 133/76/187.5)

telescope run 20120

Entry  Sat Oct 2 09:57:20 2010, Thomas Bergauer, CNM, run, run025, 150k, 02.10.2010 09:54:28, 02.10.2010 14:21:20 run20122.pngslowcontrol_cnm.pngcnm_2d_1.pngcnm_2d_2.png

 CMN-SILC stack

HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

new position along the CNM strips (XY-table to 143/76/187.5)

telescope run 20122

 

Entry  Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,  ITE128_SlowControl_FirstRun.png

center position: 119/48/187,5

 

Entry  Sat Oct 2 17:24:12 2010, Markus Friedl, ITE, run, run026, 5834, 02.10.2010 17:23:46 , 02.10.2010 17:31:51 

2 x SILC + 2 x ITE
HV=100V

 

trying to find beam
 

telescope run 20124

Entry  Sat Oct 2 17:27:14 2010, Thomas Bergauer, ITE, cal, cal007, 83800, 02.10.2010 17:11:18 ,  intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png

ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V

Beam on 

one short only per sensor

Entry  Sat Oct 2 17:35:51 2010, Markus Friedl, ITE, run, run027, 2999, 02.10.2010 17:34:51 , 02.10.2010 17:38:39 

2 x SILC + 2 x ITE
HV=100V
telescope position: 107

telescope run 20125

 

beam not found yet

Entry  Sat Oct 2 18:36:57 2010, Markus Friedl, ITE, run, run028, 162263, 02.10.2010 18:34:06, 03.10.2010 08:11:13  

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

 short break ~2.10.2010 20:00 (beam off for a couple of minutes for access by marcos)

telescope run 20126

Entry  Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,  

6 x SILC + 2 x ITE
HV=100V
telescope position: 119

no beam (technical problem)

ELOG V3.1.5-fc6679b