Tue Sep 28 14:38:24 2010, Christian Irmler, BELLE, Temperature sensors Belle stack, , , ,
|
PicoLogic TC-08 temperature sensor assignment Belle stack:
Sensor type: K
channel 1: Origami_mod1_in
channel 2: Origami_mod1_out
channel 3: Origami_mod2_in
channel 4: Origami_mod2_out
channel 5: Micron_wedge_mod1_p
channel 6: Micron_wedge_mod1_n
channel 7: Micron_wedge_mod2_p
channel 8: Micron_wedge_mod2_n
The cooling pipes of the two Origami modules and that of the Micron modules are connected in series, respectively. |
Thu Sep 30 10:56:34 2010, Christian Irmler, common, Room numbers, , , ,
|
Room and telefone numbers.
Name |
Building |
Room |
Tel. |
Bergi |
38 |
418 |
70 418 or 162471 (mobile) |
Markus |
41 |
021 |
60 021 |
Manfred |
38 |
404 |
70 404 |
Erik |
38 |
463 |
70 463 |
Immanuel |
38 |
313 |
70 313 |
Chrisu |
39 |
324 |
79 324
|
Marko |
39 |
007 |
79 007 |
Paqui |
38 |
107 |
70 107 |
|
Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,
|
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
HV=200V
beam on
modules flushed with dry air
|
Sun Oct 3 18:52:56 2010, Christian Irmler, Pt, run, run030, 25600, 03.10.2010 19:16:29,
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
HV=200V beam on
angle: 27
telescope run 20134 |
Mon Oct 4 11:43:05 2010, Christian Irmler, Pt, run, run037, 25600, 04.10.2010 11:40:15, 04.10.2010 12:15:03
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
HV=200V beam on
angle: 41 deg
telescope run 20143 |
Mon Oct 4 15:39:34 2010, Christian Irmler, Pt, run, run041, 25600, 04.10.2010 15:46:22,
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
HV=200V beam on
angle: 45 deg
position axis = 232.5
repetition of run039
telescope run20147 |
Mon Oct 4 16:15:48 2010, Christian Irmler, Pt, run, run042, 25600, 04.10.2010 16:12:52, 04.10.2010 16:35:18
|
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
HV=200V beam on
angle: 47 deg
repetition of run040, but now biased :-)
telescope run 20148 |
Mon Oct 4 16:29:36 2010, Christian Irmler, common, beam settings, , , ,
|
beam settings optimized by beamline operator
wire champer display fixed |
Mon Oct 4 20:16:19 2010, Christian Irmler, BELLE, cal, cal011, 83800, 04.10.2010 20:15:00,
|
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C
HV connection of Origami 1 repaired |
Mon Oct 4 21:01:25 2010, Christian Irmler, BELLE, run, run43, 30000, 04.10.2010 20:59:48, 04.10.2010 23:04:24
|
angle scan Origami 1 and Micron wedge 1
HV = 100V
chiller set to 14°C
angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)
telescope run: 20149 |
Tue Oct 5 17:50:23 2010, Christian Irmler, ITE, cal, cal012, 83800, 05.10.2010 17:50:26, 05.10.2010 18:09:48
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal
beam on
modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C |
Tue Oct 5 18:13:05 2010, Christian Irmler, ITE, run, run048, 533125, 05.10.2010 18:14:57, 06.10.2010 09:27:44
|
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155
DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal
beam on
modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C |
Fri Oct 8 18:12:15 2010, Christian Irmler, BELLE, run, run053, 98000, 08.10.2010 00:33:14, 08.10.2010 13:36:57
|
Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
NIM trigger
temperature of chiller set to 15°C
Analog signal of APVs #22 and #23 has been bound to ground after 1200 events. |
Fri Oct 8 23:43:07 2010, Christian Irmler, BELLE, run, run055, 12316, 08.10.2010 23:42:51, 09.10.2010 00:14:56
|
Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip
same position as in previous run
telescope run 20197 - wrong config file @ telescope -> new run with correct settings |
Sat Oct 9 12:00:55 2010, Christian Irmler, BELLE, cal, cal017, 83800, 09.10.2010 11:59:37,
|
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA
cooling: chiller set to 15°C
Origami p-side does not receive triggers -> disabled
origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem... |
Mon Oct 11 11:18:17 2010, Christian Irmler, common, end of success, , , 09.10.2010 19:44:23, NaN
|
der Beiweis :-) |
Wed Sep 29 11:53:16 2010, Erik Huemer, BELLE, run, run011, 19003, 29.09.2010 12:19:57, 29.09.2010 14:00:57
|
Belle stack: Origami-Micron-Micron-Origami
HV=100V, Ibias=83.22µA, beam on
no cooling
Temp. at modules:
Origami 1: 50°C
Micron 1: 46°C
Micron 2: 48°C
Origami 2: 48°C
standard I2C settings
centered
telescope run 20085 (continued) |
Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05
|
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
60° rotation
Teleskop nicht neu gestartet, machma nochamal |
Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,
|
center position: 119/48/187,5
|
Sun Oct 3 16:23:20 2010, Erik Huemer, Pt, XY/R Position, , , ,
|
centerposition: 119/43/187,5
27 grad: 214,5 |
|