Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 1 of 8  Not logged in ELOG logo
Entry  Tue Sep 28 14:38:24 2010, Christian Irmler, BELLE, Temperature sensors Belle stack, , , ,  
PicoLogic TC-08 temperature sensor assignment Belle stack:
Sensor type: K
channel 1:  Origami_mod1_in
Entry  Thu Sep 30 10:56:34 2010, Christian Irmler, common, Room numbers, , , ,  
Room and telefone numbers.
 

    
        
            Name
Entry  Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,  slowcontrol_pt_cal010.gif
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
Entry  Sun Oct 3 18:52:56 2010, Christian Irmler, Pt, run, run030, 25600, 03.10.2010 19:16:29,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=23.1A h02=10.4A
Entry  Mon Oct 4 11:43:05 2010, Christian Irmler, Pt, run, run037, 25600, 04.10.2010 11:40:15, 04.10.2010 12:15:03 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=25.4A h02=13.1A
Entry  Mon Oct 4 15:39:34 2010, Christian Irmler, Pt, run, run041, 25600, 04.10.2010 15:46:22,  
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=26.0A h02=13.4A
Entry  Mon Oct 4 16:15:48 2010, Christian Irmler, Pt, run, run042, 25600, 04.10.2010 16:12:52, 04.10.2010 16:35:18 
Pt modules, angle scan
h01-Pt and h02-Pt
currents: h01=28.1A h02=2.4A
Entry  Mon Oct 4 16:29:36 2010, Christian Irmler, common, beam settings, , , ,  beamprofile_run042.gifbeamsettings_run042.jpg
beam settings optimized by beamline operator
wire champer display fixed
Entry  Mon Oct 4 20:16:19 2010, Christian Irmler, BELLE, cal, cal011, 83800, 04.10.2010 20:15:00,  
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Mon Oct 4 21:01:25 2010, Christian Irmler, BELLE, run, run43, 30000, 04.10.2010 20:59:48, 04.10.2010 23:04:24 
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Tue Oct 5 17:50:23 2010, Christian Irmler, ITE, cal, cal012, 83800, 05.10.2010 17:50:26, 05.10.2010 18:09:48  
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Tue Oct 5 18:13:05 2010, Christian Irmler, ITE, run, run048, 533125, 05.10.2010 18:14:57, 06.10.2010 09:27:44 LongtermITERun2.png
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Fri Oct 8 18:12:15 2010, Christian Irmler, BELLE, run, run053, 98000, 08.10.2010 00:33:14, 08.10.2010 13:36:57 
Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
Entry  Fri Oct 8 23:43:07 2010, Christian Irmler, BELLE, run, run055, 12316, 08.10.2010 23:42:51, 09.10.2010 00:14:56  
Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA 
cooling: Origami only, chiller set to -25°C, 
Entry  Sat Oct 9 12:00:55 2010, Christian Irmler, BELLE, cal, cal017, 83800, 09.10.2010 11:59:37,  
Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA 
    Reply  Mon Oct 11 11:18:17 2010, Christian Irmler, common, end of success, , , 09.10.2010 19:44:23, NaN IMG_9033.JPG
der Beiweis  :-)
Entry  Wed Sep 29 11:53:16 2010, Erik Huemer, BELLE, run, run011, 19003, 29.09.2010 12:19:57, 29.09.2010 14:00:57 
Belle stack: Origami-Micron-Micron-Origami 
HV=100V, Ibias=83.22µA, beam on
no cooling
Entry  Fri Oct 1 09:42:02 2010, Erik Huemer, Micron Baby, run, run020, 1843, 01.10.2010 09:59:09 , 01.10.2010 10.05 
micron baby: 4 DUTs
HV=100V I=10.9uA
Beam on
Entry  Sat Oct 2 15:24:00 2010, Erik Huemer, ITE, XY Position and Slow Control, , , ,  ITE128_SlowControl_FirstRun.png
center position: 119/48/187,5
 
Entry  Sun Oct 3 16:23:20 2010, Erik Huemer, Pt, XY/R Position, , , ,  
centerposition: 119/43/187,5
27 grad: 214,5
ELOG V3.1.5-fc6679b