Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 1 of 8  Not logged in ELOG logo
ID Date Authordown Project Subject Run Number Events StartTime EndTime
  13   Mon Sep 27 15:39:33 2010 Thomas BergauercommonPI-XY Table    

M-521.dd: (links/rechts)

downstream rechts => pos. limit [0]

downstream links => neg. limit [207]

----------------------

M-511.dd: (oben/unten)

oben [102]

unten [0]

----------------------

M-060.dg: (rotation)

parallel beam [7,5]

 

-------------------------------------------

Remote Control:

lokal ssh tunnel starten:
ssh -g -C -L5959:zenpixelw:5900 eudet@eudetmac001.cern.ch

danach mit "Chicken of the VNC" (von lokalem Mac) VNC auf localhost (port 5959). 

  14   Mon Sep 27 15:41:28 2010 Thomas BergauercommonSzintillatoren    

1: breit  (1)

2: schmal (2)

3: breit  (4)

4: schmal  (8)

 

AND aus beiden breiten: 5

AND aus beiden schmalen: 10

 

  15   Mon Sep 27 15:42:09 2010 Thomas BergauercommonTLU: wir stecken auf DUT 3    

TLUControl.exe ist auf zenpixell3 unter /home/eudet/eudaq/bin

TLUControl.exe -d 14 -a 12
-dXX Mask for DUT:
1   abgeschnittenes Dummykabel
2   EUDRB hinten
4   EUDRB vorne
8   DUT3(wir)
-t100 internal trigger
-aXX Mask for Szintis:
1   4 mm (front)
2   4 mm (front)
4   9 mm (back)
8   9 mm (back)
  16   Mon Sep 27 18:54:47 2010 Thomas BergauerBELLEXY Position    

center position: 55/40/277,5

  24   Tue Sep 28 16:50:31 2010 Thomas Bergauercommonserial connection chiller    

 Der chiller braucht ein gekreuztes serielles Kabel!!

  35   Wed Sep 29 16:28:17 2010 Thomas BergauercommonEUDET telescope pedestal run20089122850 (events built)29.09.2010 16:2729.09.2010 17:33

 EUDAQ config eudet2-test-6boards-in-2crates

rate: ~745.5 Hz

 

  36   Wed Sep 29 17:38:15 2010 Thomas BergauercommonEUDET telescope pedestal run2009711812529.09.2010 17:3729.09.2010 18:09

new pedestal run of EUDET telescope with new JTAG settings of plane 3 (sensor 11) [according to Ingrid]:


VRef2    98
VRef1A  87
VRef1B  143
VRef1C  108
VRef1D   153

 

  38   Wed Sep 29 18:53:05 2010 Thomas BergauerMicron BabyXY Positions    

center position: 113/47/7.5

top left (direction jura): 121/53.5/7.5

bottom right (direction saleve): 105/40.5/7.5

  43   Thu Sep 30 14:45:16 2010 Thomas BergauerMicron Babyrunrun01522.5k30.09.2010 13:18:1130.09.2010 14:38:01

micron baby stack angle scan 15 grad mit 3 modulen

HV=100V, I=3.8uA

Beam on

 

telescope position: 129/76/187.5

telescope run 20109

  48   Thu Sep 30 23:09:29 2010 Thomas BergauerMicron Babyrunrun01916200030.09.2010 23:08:0301.10.2010 9:33:38

micron baby: 4 DUTs
HV=100V I=12uA I_stop=15.4uA
Beam on
45° rotation

 

telescope run  20115 (after JTAG programming of telescope chips due to config errors)


Attachment 1: run019_sensordisplay1.jpg
run019_sensordisplay1.jpg
Attachment 2: Eudet-X_Cluster_Corr-run020115.jpg
Eudet-X_Cluster_Corr-run020115.jpg
Attachment 3: Eudet-Num_Clusters-run020115.jpg
Eudet-Num_Clusters-run020115.jpg
  53   Fri Oct 1 23:50:28 2010 Thomas BergauerCNMrunrun023227501.10.2010 23:49:2901.10.2010 23:53:12

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

too much optimized alignment (XY-table to 133/74/187.5)   ;-)

telescope run 20119

  54   Fri Oct 1 23:55:12 2010 Thomas BergauerCNMrunrun024320k01.10.2010 23:53:1202.10.2010 09:47:37

CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

optimized alignment (XY-table to 133/76/187.5)

telescope run 20120

Attachment 1: cnm_2d_2.png
cnm_2d_2.png
Attachment 2: cnm_2d_1.png
cnm_2d_1.png
  55   Sat Oct 2 09:57:20 2010 Thomas BergauerCNMrunrun025150k02.10.2010 09:54:2802.10.2010 14:21:20

 CMN-SILC stack

HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA

new position along the CNM strips (XY-table to 143/76/187.5)

telescope run 20122

 

Attachment 1: run20122.png
run20122.png
Attachment 2: slowcontrol_cnm.png
slowcontrol_cnm.png
Attachment 3: cnm_2d_1.png
cnm_2d_1.png
Attachment 4: cnm_2d_2.png
cnm_2d_2.png
  59   Sat Oct 2 17:27:14 2010 Thomas BergauerITEcalcal0078380002.10.2010 17:11:18  

ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V

Beam on 

one short only per sensor

Attachment 1: intcal_ITE10PAD_W7.png
intcal_ITE10PAD_W7.png
Attachment 2: intcal_ITE10PAD_W9.png
intcal_ITE10PAD_W9.png
  91   Wed Oct 6 11:51:25 2010 Thomas BergauerMicron Babyrunrun049448906.10.2010 11:38:2106.10.2010 11:49:23
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)

beam on 

not yet optimized XY-table positions (111/43.5/7.5)

  105   Sat Oct 9 12:25:36 2010 Thomas BergauerBELLErunrun05727647509.10.2010 12:22:2109.10.2010 15:08:46

 

Origami1 (n-side only) + Micron1 (non-irrad)

angle scan: 73 degree

HV=100V / 36 uA  (beginning), 35uA (end of run)

cooling: chiller set to 15C

 PROBLEM: wrong config file (single hit, not multi6)

telescope run 20200

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

 

  107   Sat Oct 9 18:56:35 2010 Thomas Bergauercommonpath to telescope data    

eudetmac001.cern.ch

path is /Volumes/Data/eudet/Data/cern_2010_sept_silc_apvdaq (Vienna system)

and /Volumes/Data/eudet/Data/cern_2010_sept_silc_alibava (Santander system)

  109   Sun Oct 10 15:45:04 2010 Thomas Bergauercommonend of success  09.10.2010 19:44:23NaN

 ;-) 

genau das gleiche wollte ich auch gerade schreiben!

  120   Wed May 4 15:14:31 2011 Thomas BergauerPtinfo about module    

pt-Modul hat jeweils zwei OB1 Sensoren von STM (mit 122um Pitch)

im Abstand von 2mm uebereinander

  17   Tue Sep 28 01:13:57 2010 Markus FriedlBELLEcalcal0018380028.09.2010 01:11:20 

first intcal with complete Belle stack: 2 x Origami, 2 x Micron

HV=100V  I=49uA

beam is on

chiller is set to 15°C (module temperature is ~17°C)

both Origamis and both Microns are serially cooled

ELOG V3.1.5-fc6679b