ID Date Authordown Project Subject Run Number Events StartTime EndTime
  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)

telescope run: 20149

  87   Tue Oct 5 17:50:23 2010 Christian IrmlerITEcalcal0128380005.10.2010 17:50:2605.10.2010 18:09:48

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

  88   Tue Oct 5 18:13:05 2010 Christian IrmlerITErunrun04853312505.10.2010 18:14:5706.10.2010 09:27:44

6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
telescope run: 20154-20155

DUTs and SILC4/5 swapped
new module order (downstream): SILC0 - SILC3 - SILC1 - W7 - W9 - SILC2 - SILC4 -SILC5
SILC1 and SILC2 are horizontal

beam on

modules flushed with dry air (black tube)
rel. humidity: ~0% @ 26°C

Attachment 1: LongtermITERun2.png
LongtermITERun2.png
  98   Fri Oct 8 18:12:15 2010 Christian IrmlerBELLErunrun0539800008.10.2010 00:33:1408.10.2010 13:36:57

Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
NIM trigger

temperature of chiller set to 15°C

Analog signal of APVs #22 and #23 has been bound to ground after 1200 events.

  102   Fri Oct 8 23:43:07 2010 Christian IrmlerBELLErunrun0551231608.10.2010 23:42:5109.10.2010 00:14:56

Belle stack w/o Origami2 after irradiation
HV=80V / 255 µA
cooling: Origami only, chiller set to -25°C,
2 suspicious APVs on n side of Micron due to burnt strip

same position as in previous run

telescope run 20197  - wrong config file @ telescope -> new run with correct settings

  104   Sat Oct 9 12:00:55 2010 Christian IrmlerBELLEcalcal0178380009.10.2010 11:59:37 

Origami1 (n-side only) + Micron1 (non-irrad)
angle scan: 73°
HV=100V / 40 µA
cooling: chiller set to 15°C

Origami p-side does not receive triggers -> disabled

origami flex straight part needed to be folded due to severe rotation angle -> nanonics connector problem...

  110   Mon Oct 11 11:18:17 2010 Christian Irmlercommonend of success  09.10.2010 19:44:23NaN

der Beiweis  :-)

Attachment 1: IMG_9033.JPG
IMG_9033.JPG