Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 1 of 8  Not logged in ELOG logo
Entry  Fri Oct 8 18:12:15 2010, Christian Irmler, BELLE, run, run053, 98000, 08.10.2010 00:33:14, 08.10.2010 13:36:57 
Belle stack w/o Origami2 after irradiation
HV=80V
Telescope position 55/30/277.5
Entry  Wed Oct 6 11:59:29 2010, Markus Friedl, Micron Baby, run, run050, 90000, 06.10.2010 11:57:55, 06.10.2010 15:30:37 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=141uA (start of run)
beam on
Entry  Wed Oct 6 16:33:55 2010, Markus Friedl, Micron Baby, run, run051, 90000, 06.10.2010 16:32:03, 06.10.2010 20:59:58 
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=209uA (start of run, still rising); 203uA (end of run)
beam on, NIM trigger from TLU (no handshake)
Entry  Fri Oct 8 18:12:43 2010, Markus Friedl, BELLE, run, run054, 90000, 08.10.2010 18:08:48, 08.10.2010 21:49:36  
Belle stack w/o Origami2 after irradiation
HV=80V I=224uA (beginning of run)
2 suspicious APVs on Micron n side
Entry  Wed Sep 29 19:08:56 2010, Markus Friedl, Micron Baby, run, run013, 89853, 29.09.2010 19:09:57, 30.09.2010 00:52:39 run013_hit.png
micron baby stack
HV=100V I=11.0uA
Beam on
Entry  Tue Sep 28 01:13:57 2010, Markus Friedl, BELLE, cal, cal001, 83800, 28.09.2010 01:11:20,  
first intcal with complete Belle stack: 2 x Origami, 2 x Micron
HV=100V  I=49uA
beam is on
Entry  Tue Sep 28 22:07:16 2010, Markus Friedl, BELLE, cal, cal002 DO NOT USE -> go to cal003, 83800, 28.09.2010 22:01:55,  
Belle stack (Origami, Micron, Micron, Origami)
now cooling only for Origami, Micron are uncooled
chiller set point: -25°C, measured values on Origami: -10°C
Entry  Wed Sep 29 09:39:33 2010, Markus Friedl, BELLE, cal, cal003, 83800, 29.09.2010 09:38:00,  
same as cal002, but now with corrected readout order
Entry  Wed Sep 29 14:03:55 2010, Markus Friedl, BELLE, cal, cal004, 83800, 29.09.2010 14:02:25, 29.09.2010 14:45:05 
Belle stack: Origami-Micron-Micron-Origami 
HV=100V, Ibias=100µA, beam off
no cooling
Entry  Wed Sep 29 17:38:19 2010, Markus Friedl, Micron Baby, cal, cal005, 83800, 29.09.2010 17:36:38,  
micron baby stack
HV=100V I=6.5uA
Beam off
Entry  Thu Sep 30 15:06:28 2010, Markus Friedl, Micron Baby, cal, cal006, 83800, 30.09.2010 15:01:56,  
micron baby: 4 DUTs - angle scan
HV=100V I=6.8uA
Beam off (turned on at ~8k events)
Entry  Sat Oct 2 17:27:14 2010, Thomas Bergauer, ITE, cal, cal007, 83800, 02.10.2010 17:11:18 ,  intcal_ITE10PAD_W7.pngintcal_ITE10PAD_W9.png
ITE: 2 DUTs
2 x SILC + 2 x ITE
HV=100V
Entry  Sun Oct 3 08:14:39 2010, Markus Friedl, ITE, cal, cal008, 83800, 03.10.2010 08:13:06,  
6 x SILC + 2 x ITE
HV=100V
telescope position: 119
Entry  Sun Oct 3 14:35:12 2010, Marko Dragicevic, CNM, cal, cal009, 83800, 03.10.2010 13:50:54,  cal009_cal_apv6.pngcal009_cal_apv7.pngslowcontrol_CNM_cal009.gif
CMN-SILC stack
HV_SILC (Katze)=75V, 0.25uA (6 SiLC)
HV_CNM (Keithley)=30V, CNM_1=84nA, CNM_2=4.3uA
Entry  Sun Oct 3 18:23:27 2010, Christian Irmler, Pt, cal, cal010, 83800, 03.10.2010 18:26:49 ,  slowcontrol_pt_cal010.gif
pt modules angle scan
h01-Pt and h02-Pt
currents: h01=23.1µA h02=10.4µA
Entry  Mon Oct 4 20:16:19 2010, Christian Irmler, BELLE, cal, cal011, 83800, 04.10.2010 20:15:00,  
angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C
Entry  Tue Oct 5 17:50:23 2010, Christian Irmler, ITE, cal, cal012, 83800, 05.10.2010 17:50:26, 05.10.2010 18:09:48  
6 x SILC + 2 x ITE
HV=100V
telescope position: 124/48
Entry  Wed Oct 6 11:03:59 2010, Marko Dragicevic, Micron Baby, cal, cal013, 83800, 06.10.2010 11:03:12,  
8 x Micron Baby (3 irradiated), no cooling
HV=100V I=115uA (start of run)
beam off
Entry  Wed Oct 6 23:03:15 2010, Marko Dragicevic, BELLE, cal, cal014, 83800, 06.10.2010 23:01:56, 06.10.2010 23:34:07 
Belle stack without Origami2
HV=80V I=227uA
beam on
Entry  Fri Oct 8 17:26:36 2010, Markus Friedl, BELLE, cal, cal015, 83800, 08.10.2010 17:22:44,  
Belle stack without Origami2
HV=11V I=32uA
beam on
ELOG V3.1.5-fc6679b