Tue Aug 11 14:03:57 2009, Marko Dragicevic, , Sensor Designs, , , , 6x
|
Screenshots
HEPHY Gallery
GDS File Viewer
KLayout Website
Layer Properties File Warsaw.lyp in den Attachments. |
Fri Aug 14 16:45:25 2009, Stephan Hänsel, , Module - Setups, , , ,
|
5mm Inbus-Schlüssel
3mm Inbus Schlüssel
6- 2(1) x 30 Pt-Pins
beim 5mm-Sockel müssen
die 2 Löcher über die das optische Modul h03 verschraubt wird noch ausgeweitet werden (Thomas)
bei Pt-Deckel oben einzeichnen welche |
Fri Aug 14 19:35:43 2009, Thomas Bergauer, Pt_ITE512, intcal, , , ,
|
HV=100V except h05-ITE-512 and h06-ITE-512 (runaway, HV off)
h01-Pt: 10uA
h02-Pt: 1.6uA |
Fri Aug 14 21:36:17 2009, Markus Friedl, , Config files, , , ,
|
Status of config files as of Friday 14 August 2009 late evening
Config
file name
Timing adjusted
Sensor definition
Tested
|
Wed Aug 19 15:37:37 2009, Christian Irmler, ITE128, internal calibration, cal001, , 15:31:29,
|
8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline = PAD modules |
Wed Aug 19 15:41:17 2009, Wolfgang Kiesenhofer, SiLC, angle scan templates, , , , 13x
|
Linie am rechten Seitenrand (in der Vorschau unten leider nicht gut zu sehen) sollte mit dem rechten Rand der Basisplatte abschließen (bezogen
auf die Beam Richtung). |
Wed Aug 19 22:57:13 2009, Marko Dragicevic, , How-To, , , ,
|
TLU (run from DAQPCHEPHY):
ssh eudet@eudetmac001.cern.ch
ssh tlupc
~\eudaq\bin\TLUControl.exe -d1 -a12 |
Thu Aug 20 00:31:45 2009, Christian Irmler, ITE128, ITE128 shooting into strips w pitch adapter, upper position, run003, 100600, 20.08.2009 00:27:36,
|
DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
Thu Aug 20 15:54:45 2009, Manfred Valentan, BELLE, temp/humidty logger data, , , ,
|
position: underneath telescope. dewpoint ~ 15 degree
test with chiller: running 4 hours at 15 degress: NO condensation on alu pipe |
Thu Aug 20 18:56:25 2009, Christian Irmler, alignment_laser, laser, laser001, 100000, 20.08.2009 18:48:53,
|
2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite to the beam) |
Fri Aug 21 13:38:20 2009, Christian Irmler, BELLE, APVDAQ standalone 31.8 MHz hit mode, run011, 75000, 21.08.2009 13:35:25 ,
|
4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source |
Fri Aug 21 16:37:22 2009, Christian Irmler, BELLE, internal calibration 40 MHz hit mode, cal006, , 21.08.2009 16:30:33,
|
Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode |
Fri Aug 21 17:14:58 2009, Wolfgang Kiesenhofer, , S/N Histograms Raw (no data selection), run001 (strips), run002 (pitch adapter), run003 (upper edge), , ,  
|
|
Fri Aug 21 22:42:32 2009, Thomas Bergauer, common, EUDAQ config file used when running with telescope, , , ,
|
Used until Friday, 21.08.09: |
Sat Aug 22 11:54:49 2009, Thomas Bergauer, common, beam profile, , , ,
|
beam shifted a bit in vertical direction downwards since 21. August 09 evening
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008 |
Sat Aug 22 13:28:53 2009, Wolfgang Kiesenhofer, Pt_ITE512, runlist for pt-module angle-scan, , , ,
|
Preliminary run list for pt-modules + ite512 + silc1, silc2, silc5, silc6
run
angle[deg]
|
Sat Aug 22 15:12:44 2009, Thomas Bergauer, common, beam profile, , , ,
|
playing with TRIM4 in vertical plane (setting to 20A current) shifted beamspot back to center position
Beam configuration:
Beam configuration file: H6b.802 (FM HAD (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008 |
Sat Aug 22 22:14:50 2009, Christian Irmler, BELLE, internal calibration 40 MHz transparent mode + cooling, cal010, , 22.08.2009 22:24:22,
|
Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode |
Sun Aug 23 13:15:42 2009, Marko Dragicevic, Pt_ITE512, Current and Humindity during first Run, , , , 
|
Current of Pt modules during first run
Data of the run was dicarded.
Compressed air flow was at ~2 bars during run. Graph shows RH rise after switching of CA flow. Restarted at around 7% with very low pressure.
Timescales for RH and I graph are different!!! |
Sun Aug 23 14:03:14 2009, Manfred Valentan, Pt_ITE512, Pt & ITE512 center position, 1 deg, run024, 20000, 23.08.2009 13:59:06,
|
Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36 |
|