ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
|
12
|
Tue Aug 11 14:03:57 2009 |
Marko Dragicevic | | Sensor Designs | | | | | Screenshots
HEPHY
Gallery
GDS File Viewer
|
6x |
13
|
Fri Aug 14 16:45:25 2009 |
Stephan Hänsel | | Module - Setups | | | | |
5mm Inbus-Schlüssel
3mm Inbus Schlüssel
|
|
14
|
Fri Aug 14 19:35:43 2009 |
Thomas Bergauer | Pt_ITE512 | intcal | | | | | HV=100V except h05-ITE-512 and h06-ITE-512
(runaway, HV off)
h01-Pt: 10uA |
|
15
|
Fri Aug 14 21:36:17 2009 |
Markus Friedl | | Config files | | | | | Status of config files as of Friday 14
August 2009 late evening
|
|
16
|
Wed Aug 19 15:37:37 2009 |
Christian Irmler | ITE128 | internal calibration | cal001 | | 15:31:29 | | 8 modules, HV=70V, 40MHz, 1 sample
no beam
APV 4,5: inverter off, higher baseline |
|
17
|
Wed Aug 19 15:41:17 2009 |
Wolfgang Kiesenhofer | SiLC | angle scan templates | | | | | Linie am rechten Seitenrand (in der Vorschau
unten leider nicht gut zu sehen) sollte mit
dem rechten Rand der Basisplatte abschließen |
13x |
20
|
Wed Aug 19 22:57:13 2009 |
Marko Dragicevic | | How-To | | | | | TLU (run from DAQPCHEPHY):
ssh
eudet@eudetmac001.cern.ch
ssh tlupc |
|
22
|
Thu Aug 20 00:31:45 2009 |
Christian Irmler | ITE128 | ITE128 shooting into strips w pitch adapter, upper position | run003 | 100600 | 20.08.2009 00:27:36 | | DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope |
|
33
|
Thu Aug 20 15:54:45 2009 |
Manfred Valentan | BELLE | temp/humidty logger data | | | | | position: underneath telescope. dewpoint
~ 15 degree
test with chiller: running 4 hours |
|
34
|
Thu Aug 20 18:56:25 2009 |
Christian Irmler | alignment_laser | laser | laser001 | 100000 | 20.08.2009 18:48:53 | | 2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite |
|
51
|
Fri Aug 21 13:38:20 2009 |
Christian Irmler | BELLE | APVDAQ standalone 31.8 MHz hit mode | run011 | 75000 | 21.08.2009 13:35:25 | | 4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source |
|
54
|
Fri Aug 21 16:37:22 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz hit mode | cal006 | | 21.08.2009 16:30:33 | | Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode |
|
55
|
Fri Aug 21 17:14:58 2009 |
Wolfgang Kiesenhofer | | S/N Histograms Raw (no data selection) | run001 (strips), run002 (pitch adapter), run003 (upper edge) | | | | |
|
58
|
Fri Aug 21 22:42:32 2009 |
Thomas Bergauer | common | EUDAQ config file used when running with telescope | | | | |
|
|
65
|
Sat Aug 22 11:54:49 2009 |
Thomas Bergauer | common | beam profile | | | | | beam shifted a bit in vertical direction
downwards since 21. August 09 evening
|
|
67
|
Sat Aug 22 13:28:53 2009 |
Wolfgang Kiesenhofer | Pt_ITE512 | runlist for pt-module angle-scan | | | | | Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6 |
|
71
|
Sat Aug 22 15:12:44 2009 |
Thomas Bergauer | common | beam profile | | | | | playing with TRIM4 in vertical
plane (setting to 20A current) shifted beamspot
back to center position |
|
75
|
Sat Aug 22 22:14:50 2009 |
Christian Irmler | BELLE | internal calibration 40 MHz transparent mode + cooling | cal010 | | 22.08.2009 22:24:22 | | Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode |
|
80
|
Sun Aug 23 13:15:42 2009 |
Marko Dragicevic | Pt_ITE512 | Current and Humindity during first Run | | | | | Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars |
|
81
|
Sun Aug 23 14:03:14 2009 |
Manfred Valentan | Pt_ITE512 | Pt & ITE512 center position, 1 deg | run024 | 20000 | 23.08.2009 13:59:06 | | Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36 |
|