Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 5 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTimedown Text Attachments
  12   Tue Aug 11 14:03:57 2009 Marko Dragicevic Sensor Designs    Screenshots
HEPHY
Gallery
GDS File Viewer
 
 6x 
  13   Fri Aug 14 16:45:25 2009 Stephan Hänsel Module - Setups     

    5mm Inbus-Schlüssel

   3mm Inbus Schlüssel
  
  
  14   Fri Aug 14 19:35:43 2009 Thomas BergauerPt_ITE512intcal    HV=100V except h05-ITE-512 and h06-ITE-512
(runaway, HV off)
h01-Pt: 10uA
  
  15   Fri Aug 14 21:36:17 2009 Markus Friedl Config files    Status of config files as of Friday 14
August 2009 late evening
  
  16   Wed Aug 19 15:37:37 2009 Christian IrmlerITE128internal calibrationcal001 15:31:29 8 modules, HV=70V, 40MHz, 1 sample
no beam 
APV 4,5: inverter off, higher baseline
  
  17   Wed Aug 19 15:41:17 2009 Wolfgang KiesenhoferSiLCangle scan templates    Linie am rechten Seitenrand (in der Vorschau
unten leider nicht gut zu sehen) sollte mit
dem rechten Rand der Basisplatte abschließen
 13x 
  20   Wed Aug 19 22:57:13 2009 Marko Dragicevic How-To    TLU (run from DAQPCHEPHY):
ssh
eudet@eudetmac001.cern.ch
ssh tlupc
  
  22   Thu Aug 20 00:31:45 2009 Christian IrmlerITE128ITE128 shooting into strips w pitch adapter, upper positionrun00310060020.08.2009 00:27:36 DUT: SiLC 08_1, 6 x ITE128, SiLC 08_2
HV = 70V, 40MHz, 120 GeV
TLU trigger, w/o telescope
  
  33   Thu Aug 20 15:54:45 2009 Manfred ValentanBELLEtemp/humidty logger data    position: underneath telescope. dewpoint
~ 15 degree
test with chiller: running 4 hours
 easylog_under_telescope.gif 
  34   Thu Aug 20 18:56:25 2009 Christian Irmleralignment_laserlaserlaser00110000020.08.2009 18:48:53 2 alignment modules
location in beam direction: h04-h03
laser is shooting on h03 (opposite
  
  51   Fri Aug 21 13:38:20 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0117500021.08.2009 13:35:25  4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
  
  54   Fri Aug 21 16:37:22 2009 Christian IrmlerBELLEinternal calibration 40 MHz hit modecal006 21.08.2009 16:30:33 Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode
  
  55   Fri Aug 21 17:14:58 2009 Wolfgang Kiesenhofer S/N Histograms Raw (no data selection)run001 (strips), run002 (pitch adapter), run003 (upper edge)      sn_langaufit_raw_strips.pdfsn_langaufit_raw_pa.pdfsn_langaufit_raw_edgerun.pdf 
  58   Fri Aug 21 22:42:32 2009 Thomas BergauercommonEUDAQ config file used when running with telescope    
 testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf 
  65   Sat Aug 22 11:54:49 2009 Thomas Bergauercommonbeam profile    beam shifted a bit in vertical direction
downwards since 21. August 09 evening
 20090822_1150_beam_conditions.jpg 
  67   Sat Aug 22 13:28:53 2009 Wolfgang KiesenhoferPt_ITE512runlist for pt-module angle-scan    Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6
  
  71   Sat Aug 22 15:12:44 2009 Thomas Bergauercommonbeam profile    playing with TRIM4 in vertical
plane (setting to 20A current) shifted beamspot
back to center position
 20090822_1511_beam_conditions.jpg 
  75   Sat Aug 22 22:14:50 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent mode + coolingcal010 22.08.2009 22:24:22 Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
  
  80   Sun Aug 23 13:15:42 2009 Marko DragicevicPt_ITE512Current and Humindity during first Run    Current of Pt modules during first run
Data
of the run was dicarded.
Compressed air flow was at ~2 bars
 IandRH_first_Pt_run.pngPicture_1.png 
  81   Sun Aug 23 14:03:14 2009 Manfred ValentanPt_ITE512Pt & ITE512 center position, 1 degrun0242000023.08.2009 13:59:06 Pt: 1 Grad, HV=200V, 0% RH
ITE512: HV=70V
X-Y-Table: x=99.6, y=36
  
ELOG V3.1.5-fc6679b