Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS June 2009, Page 3 of 6  Not logged in ELOG logo
IDdown Date Author Project Subject Run Number Events StartTime EndTime Text Attachments
  68   Sat Aug 22 13:30:28 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent mode (cooling?)cal008 22.08.2009 12:50:4822.08.2009 13:29:25Belle DUT, intcal
HV=80V, 31.8 MHz, beam off
1 sample, transparent mode
  
  67   Sat Aug 22 13:28:53 2009 Wolfgang KiesenhoferPt_ITE512runlist for pt-module angle-scan    Preliminary run
list for pt-modules + ite512 + silc1, silc2,
silc5, silc6
  
  66   Sat Aug 22 12:12:34 2009 Christian IrmlerBELLEinternal calibration 40 MHz transparent mode (cooling?)cal007 22.08.2009 12:10:32 22.08.2009 12:49:09Belle DUT, intcal
HV=80V, 40 MHz, beam off
1 sample, transparent mode
  
  65   Sat Aug 22 11:54:49 2009 Thomas Bergauercommonbeam profile    beam shifted a bit in vertical direction
downwards since 21. August 09 evening
 20090822_1150_beam_conditions.jpg 
  64   Sat Aug 22 11:26:00 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01875k22.08.2009 11:16:5722.08.2009 11:58:56 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
 

  
  63   Sat Aug 22 10:28:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 40 MHz hit mode (cooling?)run01775k22.08.2009 10:26:2822.08.2009 11:16:12 HV=80V, 40 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
 

  
  62   Sat Aug 22 09:44:50 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01675k22.08.2009 09:42:3822.08.2009 10:24:05 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=5
chiller
set to 13 deg.
 

  
  61   Sat Aug 22 08:32:02 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz hit mode (cooling?)run01575k22.08.2009 08:15:0522.08.2009 09:25:21 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples, hit mode, hitcut=4
chiller
set to 13 deg.
 

  
  60   Sat Aug 22 03:27:13 2009 Thomas BergauerBELLEAPVDAQ + telescope 31,8 MHz transparent mode (cooling?)run01475k22.08.2009 03:25:2322.08.2009 07:08:09 HV=80V, 31.8 MHz, beam on, 120 GeV
6 samples
chiller set
to 13 deg.
 

  
  59   Sat Aug 22 01:06:34 2009 Christian IrmlerBELLEAPVDAQ + telescope 40 MHz transparent mode (cooling?)run0137500021.08.2009 23:49:38 22.08.2009 03:21:48Belle DUT, tranparent mode
HV=80V, 40 MHz, beam on, 120 GeV
6 samples
  
  58   Fri Aug 21 22:42:32 2009 Thomas BergauercommonEUDAQ config file used when running with telescope    
 testfortis_with_eudrb_beam_backpressure_WITH_SILC.conf 
  57   Fri Aug 21 18:35:13 2009 Christian IrmlerBELLEAPVDAQ + telescope 31.8 MHz transparent moderun0126000021.08.2009 18:31:0121.08.2009 23:25:034 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
  
  56   Fri Aug 21 18:07:57 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHzpedcorr004 21.08.2009 17:49:1021.08.2009 18:24:314 Belle DUTs
HV=80V, 31.8 MHz
pedestal correction
  
  55   Fri Aug 21 17:14:58 2009 Wolfgang Kiesenhofer S/N Histograms Raw (no data selection)run001 (strips), run002 (pitch adapter), run003 (upper edge)      sn_langaufit_raw_strips.pdfsn_langaufit_raw_pa.pdfsn_langaufit_raw_edgerun.pdf 
  54   Fri Aug 21 16:37:22 2009 Christian IrmlerBELLEinternal calibration 40 MHz hit modecal006 21.08.2009 16:30:33 Belle DUT, intcal
HV=80V, 40 MHz, no beam
hit mode
  
  53   Fri Aug 21 15:27:08 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz hit modecal005 21.08.2009 15:34:4321.08.2009 16:29:47 Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
hit mode
  
  52   Fri Aug 21 14:18:11 2009 Christian IrmlerBELLEinternal calibration 31.8 MHz transparent modecal004 21.08.2009 14:21:4021.08.2009 15:01:24Belle DUT, intcal
HV=80V, 31.8 MHz, no beam
transparent mode
  
  51   Fri Aug 21 13:38:20 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0117500021.08.2009 13:35:25  4 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
external clock source
  
  50   Fri Aug 21 12:22:43 2009 Christian IrmlerBELLEAPVDAQ standalone 31.8 MHz hit moderun0107500021.08.2009 12:53:02 21.08.2009 13:35:014 Belle DUTs
HV=80V, 31.8 MHz, 6 sample, 120 GeV
switched to external clock source
  
  49   Fri Aug 21 12:08:44 2009 Christian IrmlerBELLEAPVDAQ standalone 40 MHzpedcorr003 21.08.2009 12:08:3321.08.2009 12:18:45 4 Belle DUTs
HV=80V, 40 MHz
pedestal correction 
  
ELOG V3.1.5-fc6679b