ID Datedown Author Project Subject Run Number Events StartTime EndTime Text Attachments
  26   Sun Jun 1 15:08:17 2008 Markus FriedlSiLCAPVDAQ only (0-sup)run000310000001.06.2008 15:05:5101.06.2008 15:33:58SiLC beam test - CERN SPS June 2008 - HIT
MODE
8 modules, HV=100V, 40MHz, 6 samples, hor
  
  25   Sun Jun 1 15:02:51 2008 Markus FriedlSiLCAPVDAQ onlyped0031000001.06.2008 15:00:5401.06.2008 15:04:14SiLC beam test - CERN SPS June 2008 - PEDESTAL
with beam
8 modules, HV=100V, 40MHz, 6 samples, hor
  
  24   Sun Jun 1 14:58:53 2008 Markus FriedlSiLCAPVDAQ onlyped0021000001.06.2008 14:55:3101.06.2008 14:59:06SiLC beam test - CERN SPS June 2008 - PEDESTAL
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=-7.5 mm
  
  23   Sun Jun 1 14:36:23 2008 Markus FriedlSiLCAPVDAQ only (0-sup)run000210000001.06.2008 14:25:4301.06.2008 14:54:14SiLC beam test - CERN SPS June 2008 - HIT
MODE
8 modules, HV=100V, 40MHz, 6 samples, hor
  
  22   Sun Jun 1 08:06:57 2008 stephan hänselSiLCAPVDAQ + telescope (raw)run2721-27372200001.06.2008 - 08:01:5301.06.2008 - 14:19:13SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=-7.5 mm
  
  21   Sun Jun 1 01:56:47 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run272010000001.06.2008 01:51:4501.06.2008 07:48:09SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=-7.5 mm
  
  20   Sat May 31 22:54:29 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run271910000031.05.2008 22:34:3801.06.2008 01:49:30SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=-2.75 mm
  
  19   Sat May 31 18:33:50 2008 Thomas Bergauerotherbeam profile    [SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD
(P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
 Picture_1.pngbeamline_settings.png 
  18   Sat May 31 17:36:14 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run271810000031.05.2008 16:21:5731.05.2008 21:08:32SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=+2 mm
  
  17   Sat May 31 17:32:35 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup) run2717649031.05.2008 15:57:5831.05.2008 16:09:21SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d
  
  16   Sat May 31 17:29:40 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run27162000031.05.2008 14:59:2631.05.2008 15:56:23SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d
  
  15   Sat May 31 13:34:28 2008 Thomas Bergauer how to copy data from lab2pc to eudetmac    rsync -rltvz --exclude "data_vie" --exclude
"hitfit_cern08" --exclude "output_vie" --exclude
"run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/
  
  14   Fri May 30 19:42:13 2008 stephan hänselSiLCAPVDAQ onlyrun00015180330.05.2008 19:38:0430.05.2008 22:54:59SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d
  
  12   Fri May 30 10:36:18 2008 Marko DragicevicotherImportant Information/Contact    [B]IPs[/B]
Linksys Router
[LIST]
  
  11   Mon May 26 15:38:53 2008 Markus FriedlSiLCHow to run APVDAQ    Power-on Procedure
==================
 panel_instruction.gifcern08_silc_all_single.cfgcern08_silc_all_multi6.cfgcern08_silc_mod03_single.cfgcern08_silc_mod03_multi6.cfg 
  10   Fri May 23 15:17:49 2008 Markus FriedlSiLCModule/chip/strip/zone numbering scheme(work in progress)   The SILC DUT is a stack of 8 silicon sensors
surrounded by the telescope.
The spacing between each of the 8 layers
 telescope_single_dut.giftelescope_8_dut.gifsilc_dut_stack_beam.jpgsilc_dut_beam.jpg 
  9   Mon May 19 15:21:49 2008 Markus FriedlotherCERN SPS page 1    SPS Status
SPS
Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
  
  8   Mon May 19 15:14:40 2008 Markus FriedlotherTentative Beam Test Schedule    Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
  
  7   Wed May 14 16:15:30 2008 Markus FriedlBELLEMicron DDD5 Photos    This is the new Micron DDD5 double-sided module
with 3+3 APV25 readout chips on each side.
 micron_pside.jpgmicron_nside.jpgmicron_pside_detail.jpgmicron_nside_detail.jpg 
  6   Wed May 14 09:21:39 2008 stephan hänselSiLCcapacity measurements - HPK-ILC-TS-6687-24    ich hab mal die Kapazitäts-Messungen vom Thomas
in ein Diagram gegeben
 capacity-TS24.epscapacity_measurements_ACTS-24.opj 
ELOG V3.1.5-fc6679b