| ID | Date | Author  | Project | Subject | Run Number | Events | StartTime | EndTime | Text |  | 
| 3 | Wed May  7 16:28:23 2008 | stephan hänsel | SiLC | Photos |  |  |  |  | Module Photos 
 [URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview
 |     | 
| 6 | Wed May 14 09:21:39 2008 | stephan hänsel | SiLC | capacity measurements - HPK-ILC-TS-6687-24 |  |  |  |  | ich hab mal die Kapazitäts-Messungen vom Thomas in ein Diagram gegeben
 
 |    | 
| 14 | Fri May 30 19:42:13 2008 | stephan hänsel | SiLC | APVDAQ only | run0001 | 51803 | 30.05.2008  19:38:04 | 30.05.2008  22:54:59 | SiLC beam test - CERN SPS June 2008 8 modules, HV=100V, 40MHz, 6 samples
 trigger: 9 mm opening, TLUControl.exe -d
 |  | 
| 22 | Sun Jun  1 08:06:57 2008 | stephan hänsel | SiLC | APVDAQ + telescope (raw) | run2721-2737 | 22000 | 01.06.2008 - 08:01:53 | 01.06.2008 - 14:19:13 | SiLC beam test - CERN SPS June 2008 8 modules, HV=100V, 40MHz, 6 samples, hor
 stage :=-7.5 mm
 |  | 
| 1 | Tue May  6 13:51:43 2008 | Thomas Bergauer | other | Equipment list |  |  |  |  | [B]Slow Control:[/B] K2410 SMU
 K2700 Scanning Voltmeter
 |  | 
| 2 | Wed May  7 10:43:09 2008 | Thomas Bergauer | SiLC | Documentation: twiki, Stephans Hardware Drawings,.... |  |  |  |  | DUT, APVDAQ Documentation CERN TWiki:
 https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
 
 |  | 
| 5 | Fri May  9 15:29:28 2008 | Thomas Bergauer | SiLC | Sensor Layout |  |  |  |  | 
 |    | 
| 15 | Sat May 31 13:34:28 2008 | Thomas Bergauer |  | how to copy data from lab2pc to eudetmac |  |  |  |  | rsync -rltvz --exclude "data_vie" --exclude "hitfit_cern08" --exclude "output_vie" --exclude
 "run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/
 |  | 
| 19 | Sat May 31 18:33:50 2008 | Thomas Bergauer | other | beam profile |  |  |  |  | [SIZE=3][B]Beam configuration[/B][/SIZE] Beam configuration file: H6b.802 (FM HAD
 (P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
 |    | 
| 29 | Sun Jun  1 17:01:12 2008 | Thomas Bergauer | SiLC | path do data |  |  |  |  | [SIZE=4]The data of all runs are stored on eudetmac001.cern.ch:[/SIZE]
 
 |  | 
| 57 | Tue Jun  3 11:03:27 2008 | Thomas Bergauer |  | telescope alignment run | run2830 | 3897 | 2008-06-03 10:52:16.783 | 2008-06-03 10:58:52.790 | telescope run with reduced beam intensity (BEND4=-600A instead of -620A and BEND7=-605A
 instead of -615A)
 |    | 
| 67 | Wed Jun  4 15:41:04 2008 | Thomas Bergauer |  | end. |  |  |  |  | testbeam is over. DUTs and APVDAQ have been dismounted and will be shipped back to Vienna.
 EUDET telescope is still in H6B and taking
 |  | 
| 68 | Tue Jun 17 09:43:07 2008 | Thomas Bergauer |  | Data analysis progress | overview (in progress) |  |  |  | [TABLE border="1"] run number|What?|APVDAQ mode|Telescope mode|#events|hit
 data processed|hitfit processed
 |   | 
| 4 | Fri May  9 11:46:36 2008 | Markus Friedl | SiLC | Data file format | (work in progress) |  |  |  | APVDAQ Data Analysis ====================
 
 |  | 
| 7 | Wed May 14 16:15:30 2008 | Markus Friedl | BELLE | Micron DDD5 Photos |  |  |  |  | This is the new Micron DDD5 double-sided module with 3+3 APV25 readout chips on each side.
 
 |      | 
| 8 | Mon May 19 15:14:40 2008 | Markus Friedl | other | Tentative Beam Test Schedule |  |  |  |  | Wed 28 May: ~16:00 arrival, unpacking Thu 29 May: installation
 Fri 30 May: beam on
 |  | 
| 9 | Mon May 19 15:21:49 2008 | Markus Friedl | other | CERN SPS page 1 |  |  |  |  | SPS Status SPS
 Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
 
 |  | 
| 10 | Fri May 23 15:17:49 2008 | Markus Friedl | SiLC | Module/chip/strip/zone numbering scheme | (work in progress) |  |  |  | The SILC DUT is a stack of 8 silicon sensors surrounded by the telescope.
 The spacing between each of the 8 layers
 |      | 
| 11 | Mon May 26 15:38:53 2008 | Markus Friedl | SiLC | How to run APVDAQ |  |  |  |  | Power-on Procedure ==================
 
 |       | 
| 16 | Sat May 31 17:29:40 2008 | Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2716 | 20000 | 31.05.2008  14:59:26 | 31.05.2008  15:56:23 | SiLC beam test - CERN SPS June 2008 8 modules, HV=100V, 40MHz, 6 samples
 trigger: 9 mm opening, TLUControl.exe -d
 |  |