  HEPHY logbook for testbeam at SPS June 2008, Page 1 of 4  Not logged in ELOG logo
ID Date Authordown Project Subject Run Number Events StartTime EndTime Text Attachments
  3   Wed May 7 16:28:23 2008 stephan hänselSiLCPhotos    Module Photos

[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview
 module-top.jpgmodule-bottom.jpg8Modules.jpg 
  6   Wed May 14 09:21:39 2008 stephan hänselSiLCcapacity measurements - HPK-ILC-TS-6687-24    ich hab mal die Kapazitäts-Messungen vom Thomas
in ein Diagram gegeben
 capacity-TS24.epscapacity_measurements_ACTS-24.opj 
  14   Fri May 30 19:42:13 2008 stephan hänselSiLCAPVDAQ onlyrun00015180330.05.2008 19:38:0430.05.2008 22:54:59SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d
  
  22   Sun Jun 1 08:06:57 2008 stephan hänselSiLCAPVDAQ + telescope (raw)run2721-27372200001.06.2008 - 08:01:5301.06.2008 - 14:19:13SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=-7.5 mm
  
  1   Tue May 6 13:51:43 2008 Thomas BergauerotherEquipment list    [B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
  
  2   Wed May 7 10:43:09 2008 Thomas BergauerSiLCDocumentation: twiki, Stephans Hardware Drawings,....    DUT, APVDAQ Documentation
CERN TWiki:
https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
  
  5   Fri May 9 15:29:28 2008 Thomas BergauerSiLCSensor Layout    
 test-AC-2.pdf070516-SiLC_WaferLayout.pdf 
  15   Sat May 31 13:34:28 2008 Thomas Bergauer how to copy data from lab2pc to eudetmac    rsync -rltvz --exclude "data_vie" --exclude
"hitfit_cern08" --exclude "output_vie" --exclude
"run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/
  
  19   Sat May 31 18:33:50 2008 Thomas Bergauerotherbeam profile    [SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD
(P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
 Picture_1.pngbeamline_settings.png 
  29   Sun Jun 1 17:01:12 2008 Thomas BergauerSiLCpath do data    [SIZE=4]The data of all runs are stored on
eudetmac001.cern.ch:[/SIZE]
  
  57   Tue Jun 3 11:03:27 2008 Thomas Bergauer telescope alignment runrun283038972008-06-03 10:52:16.7832008-06-03 10:58:52.790telescope run with reduced beam intensity
(BEND4=-600A instead of -620A and BEND7=-605A
instead of -615A)
 beam_profile_with_modified_BEND4and7.pnghit_correlations.png 
  67   Wed Jun 4 15:41:04 2008 Thomas Bergauer end.    testbeam is over. DUTs and APVDAQ have been
dismounted and will be shipped back to Vienna.
EUDET telescope is still in H6B and taking
  
  68   Tue Jun 17 09:43:07 2008 Thomas Bergauer Data analysis progressoverview (in progress)   [TABLE border="1"]
run number|What?|APVDAQ mode|Telescope mode|#events|hit
data processed|hitfit processed
 Testbeam_CERN_08.xls 
  4   Fri May 9 11:46:36 2008 Markus FriedlSiLCData file format(work in progress)   APVDAQ Data Analysis
====================
  
  7   Wed May 14 16:15:30 2008 Markus FriedlBELLEMicron DDD5 Photos    This is the new Micron DDD5 double-sided module
with 3+3 APV25 readout chips on each side.
 micron_pside.jpgmicron_nside.jpgmicron_pside_detail.jpgmicron_nside_detail.jpg 
  8   Mon May 19 15:14:40 2008 Markus FriedlotherTentative Beam Test Schedule    Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
  
  9   Mon May 19 15:21:49 2008 Markus FriedlotherCERN SPS page 1    SPS Status
SPS
Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
  
  10   Fri May 23 15:17:49 2008 Markus FriedlSiLCModule/chip/strip/zone numbering scheme(work in progress)   The SILC DUT is a stack of 8 silicon sensors
surrounded by the telescope.
The spacing between each of the 8 layers
 telescope_single_dut.giftelescope_8_dut.gifsilc_dut_stack_beam.jpgsilc_dut_beam.jpg 
  11   Mon May 26 15:38:53 2008 Markus FriedlSiLCHow to run APVDAQ    Power-on Procedure
==================
 panel_instruction.gifcern08_silc_all_single.cfgcern08_silc_all_multi6.cfgcern08_silc_mod03_single.cfgcern08_silc_mod03_multi6.cfg 
  16   Sat May 31 17:29:40 2008 Markus FriedlSiLCAPVDAQ + telescope (0-sup)run27162000031.05.2008 14:59:2631.05.2008 15:56:23SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d
  