ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Text |
 |
3
|
Wed May 7 16:28:23 2008 |
stephan hänsel | SiLC | Photos | | | | | Module Photos
[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview |
  |
6
|
Wed May 14 09:21:39 2008 |
stephan hänsel | SiLC | capacity measurements - HPK-ILC-TS-6687-24 | | | | | ich hab mal die Kapazitäts-Messungen vom Thomas
in ein Diagram gegeben
|
 |
14
|
Fri May 30 19:42:13 2008 |
stephan hänsel | SiLC | APVDAQ only | run0001 | 51803 | 30.05.2008 19:38:04 | 30.05.2008 22:54:59 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d |
|
22
|
Sun Jun 1 08:06:57 2008 |
stephan hänsel | SiLC | APVDAQ + telescope (raw) | run2721-2737 | 22000 | 01.06.2008 - 08:01:53 | 01.06.2008 - 14:19:13 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor
stage :=-7.5 mm
|
|
1
|
Tue May 6 13:51:43 2008 |
Thomas Bergauer | other | Equipment list | | | | | [B]Slow Control:[/B]
K2410 SMU
K2700 Scanning Voltmeter
|
|
2
|
Wed May 7 10:43:09 2008 |
Thomas Bergauer | SiLC | Documentation: twiki, Stephans Hardware Drawings,.... | | | | | DUT, APVDAQ Documentation
CERN TWiki:
https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
|
|
5
|
Fri May 9 15:29:28 2008 |
Thomas Bergauer | SiLC | Sensor Layout | | | | |
|
 |
15
|
Sat May 31 13:34:28 2008 |
Thomas Bergauer | | how to copy data from lab2pc to eudetmac | | | | | rsync -rltvz --exclude "data_vie" --exclude
"hitfit_cern08" --exclude "output_vie" --exclude
"run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/ |
|
19
|
Sat May 31 18:33:50 2008 |
Thomas Bergauer | other | beam profile | | | | | [SIZE=3][B]Beam configuration[/B][/SIZE]
Beam configuration file: H6b.802 (FM HAD
(P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
|
 |
29
|
Sun Jun 1 17:01:12 2008 |
Thomas Bergauer | SiLC | path do data | | | | | [SIZE=4]The data of all runs are stored on
eudetmac001.cern.ch:[/SIZE]
|
|
57
|
Tue Jun 3 11:03:27 2008 |
Thomas Bergauer | | telescope alignment run | run2830 | 3897 | 2008-06-03 10:52:16.783 | 2008-06-03 10:58:52.790 | telescope run with reduced beam intensity
(BEND4=-600A instead of -620A and BEND7=-605A
instead of -615A) |
 |
67
|
Wed Jun 4 15:41:04 2008 |
Thomas Bergauer | | end. | | | | | testbeam is over. DUTs and APVDAQ have been
dismounted and will be shipped back to Vienna.
EUDET telescope is still in H6B and taking |
|
68
|
Tue Jun 17 09:43:07 2008 |
Thomas Bergauer | | Data analysis progress | overview (in progress) | | | | [TABLE border="1"]
run number|What?|APVDAQ mode|Telescope mode|#events|hit
data processed|hitfit processed
|
|
4
|
Fri May 9 11:46:36 2008 |
Markus Friedl | SiLC | Data file format | (work in progress) | | | | APVDAQ Data Analysis
====================
|
|
7
|
Wed May 14 16:15:30 2008 |
Markus Friedl | BELLE | Micron DDD5 Photos | | | | | This is the new Micron DDD5 double-sided module
with 3+3 APV25 readout chips on each side.
|
   |
8
|
Mon May 19 15:14:40 2008 |
Markus Friedl | other | Tentative Beam Test Schedule | | | | | Wed 28 May: ~16:00 arrival, unpacking
Thu 29 May: installation
Fri 30 May: beam on
|
|
9
|
Mon May 19 15:21:49 2008 |
Markus Friedl | other | CERN SPS page 1 | | | | | SPS Status
SPS
Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
|
|
10
|
Fri May 23 15:17:49 2008 |
Markus Friedl | SiLC | Module/chip/strip/zone numbering scheme | (work in progress) | | | | The SILC DUT is a stack of 8 silicon sensors
surrounded by the telescope.
The spacing between each of the 8 layers |
   |
11
|
Mon May 26 15:38:53 2008 |
Markus Friedl | SiLC | How to run APVDAQ | | | | | Power-on Procedure
==================
|
    |
16
|
Sat May 31 17:29:40 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2716 | 20000 | 31.05.2008 14:59:26 | 31.05.2008 15:56:23 | SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d |
|