| ID | 
Date | 
Author  | 
Project | 
Subject | 
Run Number | 
Events | 
StartTime | 
EndTime | 
Text | 
  | 
| 
  3  
 | 
Wed May  7 16:28:23 2008 | 
stephan hänsel | SiLC | Photos |   |   |   |   | Module Photos
 
 
[URL=http://wwwhephy.oeaw.ac.at/u3w/s/shaensel/www/HEPHY-Testbeam08/module-top.jpg]topview | 
      | 
| 
  6  
 | 
Wed May 14 09:21:39 2008 | 
stephan hänsel | SiLC | capacity measurements - HPK-ILC-TS-6687-24 |   |   |   |   | ich hab mal die Kapazitäts-Messungen vom Thomas 
in ein Diagram gegeben
 
 | 
     | 
| 
  14  
 | 
Fri May 30 19:42:13 2008 | 
stephan hänsel | SiLC | APVDAQ only | run0001 | 51803 | 30.05.2008  19:38:04 | 30.05.2008  22:54:59 | SiLC beam test - CERN SPS June 2008
 
8 modules, HV=100V, 40MHz, 6 samples
 
trigger: 9 mm opening, TLUControl.exe -d | 
   | 
| 
  22  
 | 
Sun Jun  1 08:06:57 2008 | 
stephan hänsel | SiLC | APVDAQ + telescope (raw) | run2721-2737 | 22000 | 01.06.2008 - 08:01:53 | 01.06.2008 - 14:19:13 | SiLC beam test - CERN SPS June 2008
 
8 modules, HV=100V, 40MHz, 6 samples, hor 
stage :=-7.5 mm
 | 
   | 
| 
  1  
 | 
Tue May  6 13:51:43 2008 | 
Thomas Bergauer | other | Equipment list |   |   |   |   | [B]Slow Control:[/B]
 
K2410 SMU
 
K2700 Scanning Voltmeter
 | 
   | 
| 
  2  
 | 
Wed May  7 10:43:09 2008 | 
Thomas Bergauer | SiLC | Documentation: twiki, Stephans Hardware Drawings,.... |   |   |   |   | DUT, APVDAQ Documentation
 
CERN TWiki: 
https://twiki.cern.ch/twiki/bin/view/Main/SiLCTestbeam
 
 | 
   | 
| 
  5  
 | 
Fri May  9 15:29:28 2008 | 
Thomas Bergauer | SiLC | Sensor Layout |   |   |   |   | 
 
 | 
     | 
| 
  15  
 | 
Sat May 31 13:34:28 2008 | 
Thomas Bergauer |   | how to copy data from lab2pc to eudetmac |   |   |   |   | rsync -rltvz --exclude "data_vie" --exclude 
"hitfit_cern08" --exclude "output_vie" --exclude 
"run2719*" --rsh="ssh -C -p222" friedl@routerhephy.cern.ch:/cygdrive/f/testbeam/cern_jun08/ | 
   | 
| 
  19  
 | 
Sat May 31 18:33:50 2008 | 
Thomas Bergauer | other | beam profile |   |   |   |   | [SIZE=3][B]Beam configuration[/B][/SIZE]
 
Beam configuration file: H6b.802 (FM HAD 
(P0 off, H8=+180) PARLALLEL IN H6B SILC 2008
 | 
     | 
| 
  29  
 | 
Sun Jun  1 17:01:12 2008 | 
Thomas Bergauer | SiLC | path do data |   |   |   |   | [SIZE=4]The data of all runs are stored on 
eudetmac001.cern.ch:[/SIZE]
 
 | 
   | 
| 
  57  
 | 
Tue Jun  3 11:03:27 2008 | 
Thomas Bergauer |   | telescope alignment run | run2830 | 3897 | 2008-06-03 10:52:16.783 | 2008-06-03 10:58:52.790 | telescope run with reduced beam intensity 
(BEND4=-600A instead of -620A and BEND7=-605A 
instead of -615A) | 
     | 
| 
  67  
 | 
Wed Jun  4 15:41:04 2008 | 
Thomas Bergauer |   | end. |   |   |   |   | testbeam is over. DUTs and APVDAQ have been 
dismounted and will be shipped back to Vienna. 
EUDET telescope is still in H6B and taking | 
   | 
| 
  68  
 | 
Tue Jun 17 09:43:07 2008 | 
Thomas Bergauer |   | Data analysis progress | overview (in progress) |   |   |   | [TABLE border="1"]
 
run number|What?|APVDAQ mode|Telescope mode|#events|hit 
data processed|hitfit processed
 | 
    | 
| 
  4  
 | 
Fri May  9 11:46:36 2008 | 
Markus Friedl | SiLC | Data file format | (work in progress) |   |   |   | APVDAQ Data Analysis
 
====================
 
 | 
   | 
| 
  7  
 | 
Wed May 14 16:15:30 2008 | 
Markus Friedl | BELLE | Micron DDD5 Photos |   |   |   |   | This is the new Micron DDD5 double-sided module 
with 3+3 APV25 readout chips on each side.
 
 | 
       | 
| 
  8  
 | 
Mon May 19 15:14:40 2008 | 
Markus Friedl | other | Tentative Beam Test Schedule |   |   |   |   | Wed 28 May: ~16:00 arrival, unpacking
 
Thu 29 May: installation
 
Fri 30 May: beam on
 | 
   | 
| 
  9  
 | 
Mon May 19 15:21:49 2008 | 
Markus Friedl | other | CERN SPS page 1 |   |   |   |   | SPS Status
 
SPS 
Page 1 - http://hpslweb.cern.ch/frame/java/1.1/view110-java.html
 
 | 
   | 
| 
  10  
 | 
Fri May 23 15:17:49 2008 | 
Markus Friedl | SiLC | Module/chip/strip/zone numbering scheme | (work in progress) |   |   |   | The SILC DUT is a stack of 8 silicon sensors 
surrounded by the telescope.
 
The spacing between each of the 8 layers | 
       | 
| 
  11  
 | 
Mon May 26 15:38:53 2008 | 
Markus Friedl | SiLC | How to run APVDAQ |   |   |   |   | Power-on Procedure
 
==================
 
 | 
        | 
| 
  16  
 | 
Sat May 31 17:29:40 2008 | 
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2716 | 20000 | 31.05.2008  14:59:26 | 31.05.2008  15:56:23 | SiLC beam test - CERN SPS June 2008
 
8 modules, HV=100V, 40MHz, 6 samples
 
trigger: 9 mm opening, TLUControl.exe -d | 
   |