Sat Mar 15 04:20:39 2025, elog-producer, energy scans, 232, TJ-Monopix2, 83 MeV, Low Flux Very Low, Proton, Good, 15.03.2025 04:13:51, 15.03.2025 04:21:05, 7, HV, None, 
|
automatic log for run 232
Comment: |
Sat Mar 15 01:38:17 2025, elog-producer, Fast RO Test, 216, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,
|
Fast RO for Monopix:
W02W01 8b10b error quite early
Delay = 2
rd_frz_delay = 2
LOAD_CONF=10
FREEZE_STOP_CONF=11
STOP_CONF=10 |
Sat Mar 15 01:51:31 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,
|
Run 219, Medium settings, fast RO, W02R01 to 8b10b a few minutes in |
Sat Mar 15 01:58:29 2025, elog-producer, Fast RO Test, , TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, , , , HV, None,
|
Run 220, 8b10b error |
Sat Mar 15 04:26:35 2025, elog-producer, test rate limits , 233, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:24:06, 15.03.2025 04:27:01, 2, HV, None, 
|
automatic log for run 233
Comment:
Increase csinti thr to -0.05 |
Sat Mar 15 04:28:39 2025, elog-producer, test rate limits , 234, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:28:23, 15.03.2025 04:29:06, 0, HV, None, 
|
automatic log for run 234
Comment:
Increase csinti thr to -0.075 |
Sat Mar 15 04:35:45 2025, elog-producer, test rate limits, 235, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:29:57, 15.03.2025 04:36:12, 6, HV, None, 
|
automatic log for run 235
Comment:
Increase csinti thr to -0.2 |
Sat Mar 15 04:48:44 2025, elog-producer, test 8b10b, 238, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:47:55, 15.03.2025 04:49:10, 1, HV, None, 
|
automatic log for run 238
Comment:
THR -0.2
tiny part of matrix enabled |
Sat Mar 15 04:51:42 2025, elog-producer, test 8b10b, 239, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:50:08, 15.03.2025 04:52:09, 2, HV, None, 
|
automatic log for run 239
Comment:
THR -0.2
tiny part of matrix enabled |
Sat Mar 15 04:58:42 2025, elog-producer, test 8b10b, 241, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 04:56:53, 15.03.2025 04:59:08, 2, HV, None, 
|
automatic log for run 241
Comment:
test HVC fe |
Sat Mar 15 05:02:22 2025, elog-producer, test 8b10b, 242, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:00:58, 15.03.2025 05:02:48, 1, HV, None, 
|
automatic log for run 242
Comment:
more quadratic now |
Sat Mar 15 05:06:44 2025, elog-producer, test 8b10b, 243, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:05:59, 15.03.2025 05:07:10, 1, HV, None, 
|
automatic log for run 243
Comment: |
Sat Mar 15 05:12:19 2025, elog-producer, test 8b10b, 244, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:08:03, 15.03.2025 05:12:46, 4, HV, None, 
|
automatic log for run 244
Comment:
both chips, more stat with small window on W02R01 |
Sat Mar 15 05:27:08 2025, elog-producer, test 8b10b, 245, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:26:52, 15.03.2025 05:27:34, 0, HV, None, 
|
automatic log for run 245
Comment:
test with swapped ethernet ports and bsaq IP adresses |
Sat Mar 15 05:42:14 2025, elog-producer, test 8b10b, 246, TJ-Monopix2, 800 MeV, Low Flux Medium, Proton, Unknown, 15.03.2025 05:38:42, 15.03.2025 05:42:41, 3, HV, None, 
|
automatic log for run 246
Comment:
BDAQ Board to Monopix connection swapped - and now the W02R01 chip works fine with full rate |
Sat Mar 15 08:52:52 2025, RD50 Generic User, Alignment Run 800MeV, 2, Sandwich-iCT setup(GSI)+RaMon, 800 MeV, Low Flux Medium, Proton, Good, 08:22, 9:40, 78, , ,
|
RaMon Rate 400kHz
front sensors 200mu: ~10-20kHz pro Streifen
Comments:
In between run, sensors were shifted by 2mm to the left (left and right in online DAQ is mirrored)
|
Sat Mar 15 10:07:28 2025, RD50 Generic User, Alignment Run 252MeV, 4, Sandwich-iCT setup(GSI)+RaMon, 252.7 MeV, Low Flux Medium, Proton, Good, 10:07, 11:43, 96, , ,
|
RaMon Rate 1MHz
front sensors 200mu: ~10-25kHz pro Streifen |
Sat Mar 15 11:46:28 2025, RD50 Generic User, Slab Measurement 145MeV, 5, Sandwich-iCT setup(GSI)+RaMon, 145.4 MeV, Low Flux Medium, Proton, Good, 11:48, 13:13, 85, , ,
|
RaMon Rate 600kHz
front sensors 200mu: ~1kHz pro Streifen
Comments:
change of the trigger settings inbetween, we saw inefficency on all detectors |
Sat Mar 15 13:15:25 2025, RD50 Generic User, Slab Measurement 205MeV, 6, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, Good, 13:27, 14:49, 82, , ,
|
RaMon Rate 1.3 MHz
Comments:
We entered the room and connected the second LAN Port to the ReadOut-PC. The Eventbuilder-parameter got changed. |
Sat Mar 15 15:26:08 2025, RD50 Generic User, Rate testing, 8, Sandwich-iCT setup(GSI)+RaMon, 205.2 MeV/u, Low Flux Medium, Helium, , 15:31, 16:30, 59, , ,
|
RaMon Rate: 1.3MHz
Comments:
Tested different evenbuilder settings which made things worse, probably switch is the bottleneck, changed rate settings inbetween, requires sergey |
|