Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 5 of 5  Not logged in ELOG logo
ID Date Author Project Subjectdown Run Number Events StartTime EndTime Data Text Attachments
  98   Wed Jan 29 22:40:09 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_pos2_002200k29.01.2014 22:4029.01.2014 23:15GoodHV at 300V; I at app. 7.5µA 3GeV,
Single mode
Position changed to --8.91097 -22.80061
  
  74   Sat Jan 25 18:24:03 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0011.05 M25.01.2014 10:3025.01.2014 15:40UnknownHV at 300V; I at app. 11µA 4GeV,
Single mode
Modules centered to beam but no hits
  
  78   Sun Jan 26 19:12:42 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0024 M25.01.2014 22:3026.01.2014 15:15GoodHV at 300V; I at app. 11µA 4GeV,
Single mode
 
  
  79   Sun Jan 26 19:14:07 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_003140 k26.01.2014 18:1026.01.2014 19:15GoodHV at 300V; I at app. 10µA 5GeV,
Single mode
 
  
  80   Mon Jan 27 12:20:53 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_004800k27.01.2014 09:1027.01.2014 12:15GoodHV at 300V; I at app. 10µA 3GeV,
Single mode
 
  
  59   Fri Jan 10 11:02:31 2014 Markus FriedlBelle SVDPower supply  10.01.2014 11:00:00 Unknown   KenWood100114.png 
  73   Fri Jan 24 18:02:46 2014 Wolfgang TreberspurgInfineonNew Infineon Stack    GoodExchanged AIDA stack with modified Infineon
Stack 
Configuration: 
  
  76   Sat Jan 25 18:46:32 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_001340k25.01.2014 16:3025.01.2014 18:40UnknownHV 300V, I 10µA
Beam Energy changed during the run
between 2GeV - 5GeV - 4GeV
  
  77   Sat Jan 25 21:14:46 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_002230k25.01.2014 19:0025.01.2014 21:15GoodHV 300V, I 10µA
Beam Energy  4GeV
Latency changed to 93
  
  67   Mon Jan 13 12:02:40 2014 Markus FriedlcommonKontakt    UnknownRichard Thalmeier   Tel. 4801
Hao Yin   
  
  75   Sat Jan 25 18:28:38 2014 Wolfgang TreberspurgInfineonCalibration run Infineon Stack 2Calibration_Run_Infineon_Stack2_0018290025.01.2014 10:1525.01.2014 10:25UnknownHV 300V, I ca. 11µA single mode   
  7   Mon Jan 6 19:10:36 2014 Thomas BergauercommonBeam Momentum 3GeV/crun001 to run012   UnknownWe have set the beam momentum to 3 GeV   IMG_1517.jpgIMG_1516.jpg 
  68   Sun Jan 19 18:01:46 2014 Christian IrmlercommonAIDA setup operated with TuxDAQ    UnknownNew SIS driver version sis1100-2.13-3 installed
on DAQPC. 
To install the driver call as root:
  
  69   Thu Jan 23 22:47:49 2014 Hao Yin AIDACalibrationRun0018380023.01.2014 13:35:5523.01.2014 02:08:15Goodtaken with tuxdaq...
HV=75V  I=?3.7uA?
position = 0 / -30 mm relative to
  
  70   Fri Jan 24 00:21:16 2014 Hao Yin AIDAHW_AIDA00140k24.02.2014 00:18 UnknownHV=100V  I=3.7uA
position = 0 / -30 mm relative to
initial (but again centered) no idea ---
  
  71   Fri Jan 24 11:03:14 2014 Wolfgang TreberspurgAIDAAIDAHW_AIDA002024.01.2014 10:02 CrapTuxDaq crashed   
  72   Fri Jan 24 11:23:15 2014 Hao Yin AIDAHW_AIDA0037635624.02.2014 10:3024.02.2014 11:22UnknownHV=100V  I=3.7uA
position = 0 / -30 mm relative to
initial (but again centered) no idea ---
  
ELOG V3.1.5-fc6679b