ID |
Date |
Author |
Project |
Subject |
Run Number |
Events |
StartTime |
EndTime |
Data |
98
|
Wed Jan 29 22:40:09 2014 |
Wolfgang Treberspurg | Infineon | Single mode Run Stack 2 Bias Scan | HW_Run_Infineon_Stack2_pos2_002 | 200k | 29.01.2014 22:40 | 29.01.2014 23:15 | Good |
HV at 300V; I at app. 7.5µA 3GeV, Single mode
Position changed to --8.91097 -22.80061
|
74
|
Sat Jan 25 18:24:03 2014 |
Wolfgang Treberspurg | Infineon | Single mode Run Stack 2 | HW_Run_Infineon_Stack2_001 | 1.05 M | 25.01.2014 10:30 | 25.01.2014 15:40 | Unknown |
HV at 300V; I at app. 11µA 4GeV, Single mode
Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)
-> HV connection will be checked at next opportunity to enter area. |
78
|
Sun Jan 26 19:12:42 2014 |
Wolfgang Treberspurg | Infineon | Single mode Run Stack 2 | HW_Run_Infineon_Stack2_002 | 4 M | 25.01.2014 22:30 | 26.01.2014 15:15 | Good |
HV at 300V; I at app. 11µA 4GeV, Single mode
|
79
|
Sun Jan 26 19:14:07 2014 |
Wolfgang Treberspurg | Infineon | Single mode Run Stack 2 | HW_Run_Infineon_Stack2_003 | 140 k | 26.01.2014 18:10 | 26.01.2014 19:15 | Good |
HV at 300V; I at app. 10µA 5GeV, Single mode
|
80
|
Mon Jan 27 12:20:53 2014 |
Wolfgang Treberspurg | Infineon | Single mode Run Stack 2 | HW_Run_Infineon_Stack2_004 | 800k | 27.01.2014 09:10 | 27.01.2014 12:15 | Good |
HV at 300V; I at app. 10µA 3GeV, Single mode
|
59
|
Fri Jan 10 11:02:31 2014 |
Markus Friedl | Belle SVD | Power supply | | | 10.01.2014 11:00:00 | | Unknown |
|
Attachment 1: KenWood100114.png
|
 |
73
|
Fri Jan 24 18:02:46 2014 |
Wolfgang Treberspurg | Infineon | New Infineon Stack | | | | | Good |
Exchanged AIDA stack with modified Infineon Stack
Configuration:
Beam Infineon_TB_2014_Baby1(P0) --- Inifineon_TB_2014_Baby2(P1) ||| Infineon_TB_2012_Baby2(P2) --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0) --- Infineon_TB_2012_Strixel_Bottom-right(N1) --- |
76
|
Sat Jan 25 18:46:32 2014 |
Wolfgang Treberspurg | Infineon | Mulit 6 mode Run Stack 2 | HW_Run_Infineon_Stack2_Multi_001 | 340k | 25.01.2014 16:30 | 25.01.2014 18:40 | Unknown |
HV 300V, I 10µA
Beam Energy changed during the run between 2GeV - 5GeV - 4GeV
Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93 |
77
|
Sat Jan 25 21:14:46 2014 |
Wolfgang Treberspurg | Infineon | Mulit 6 mode Run Stack 2 | HW_Run_Infineon_Stack2_Multi_002 | 230k | 25.01.2014 19:00 | 25.01.2014 21:15 | Good |
HV 300V, I 10µA
Beam Energy 4GeV
Latency changed to 93 |
67
|
Mon Jan 13 12:02:40 2014 |
Markus Friedl | common | Kontakt | | | | | Unknown |
Richard Thalmeier Tel. 4801
Hao Yin |
75
|
Sat Jan 25 18:28:38 2014 |
Wolfgang Treberspurg | Infineon | Calibration run Infineon Stack 2 | Calibration_Run_Infineon_Stack2_001 | 82900 | 25.01.2014 10:15 | 25.01.2014 10:25 | Unknown |
HV 300V, I ca. 11µA single mode |
7
|
Mon Jan 6 19:10:36 2014 |
Thomas Bergauer | common | Beam Momentum 3GeV/c | run001 to run012 | | | | Unknown |
We have set the beam momentum to 3 GeV |
Attachment 1: IMG_1517.jpg
|
 |
Attachment 2: IMG_1516.jpg
|
 |
68
|
Sun Jan 19 18:01:46 2014 |
Christian Irmler | common | AIDA setup operated with TuxDAQ | | | | | Unknown |
New SIS driver version sis1100-2.13-3 installed on DAQPC.
To install the driver call as root:
cd /lib/modules/2.6.18-371.3.1.el5/extra
/sbin/modprobe sis1100
Check if /dev/sis* are created.
Managed to run the AIDA setup with old TuxDAQ version from T. Obermayer.
Will now try to install a newer version, which also supports ADC delay scan and internal calibration. |
69
|
Thu Jan 23 22:47:49 2014 |
Hao Yin | | AIDA | CalibrationRun001 | 83800 | 23.01.2014 13:35:55 | 23.01.2014 02:08:15 | Good |
taken with tuxdaq...
HV=75V I=?3.7uA?
position = 0 / -30 mm relative to initial (but again centered) ?
?5GeV beam, single sample? (software trigger run)
?narrow timing (trigger width)? |
70
|
Fri Jan 24 00:21:16 2014 |
Hao Yin | | AIDA | HW_AIDA001 | 40k | 24.02.2014 00:18 | | Unknown |
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ... |
71
|
Fri Jan 24 11:03:14 2014 |
Wolfgang Treberspurg | AIDA | AIDA | HW_AIDA002 | 0 | 24.01.2014 10:02 | | Crap |
TuxDaq crashed |
72
|
Fri Jan 24 11:23:15 2014 |
Hao Yin | | AIDA | HW_AIDA003 | 76356 | 24.02.2014 10:30 | 24.02.2014 11:22 | Unknown |
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ... |