Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 2 of 5  Not logged in ELOG logo
Entry  Sun Jan 26 19:12:42 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_002, 4 M, 25.01.2014 22:30, 26.01.2014 15:15, Good 

HV at 300V; I at app. 11µA 4GeV, Single mode

 

Entry  Sat Jan 25 21:14:46 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_002, 230k, 25.01.2014 19:00, 25.01.2014 21:15, Good 

HV 300V, I 10µA

Beam Energy  4GeV

Latency changed to 93

Entry  Sat Jan 25 18:46:32 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_001, 340k, 25.01.2014 16:30, 25.01.2014 18:40, Unknown 

HV 300V, I 10µA

Beam Energy changed during the run between 2GeV - 5GeV - 4GeV

Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93

Entry  Sat Jan 25 18:24:03 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_001, 1.05 M, 25.01.2014 10:30, 25.01.2014 15:40, Unknown 

HV at 300V; I at app. 11µA 4GeV, Single mode

Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)

-> HV connection will be checked at next opportunity to enter area.

Entry  Sat Jan 25 18:28:38 2014, Wolfgang Treberspurg, Infineon, Calibration run Infineon Stack 2, Calibration_Run_Infineon_Stack2_001, 82900, 25.01.2014 10:15, 25.01.2014 10:25, Unknown 

HV 300V, I ca. 11µA single mode

Entry  Fri Jan 24 11:23:15 2014, Hao Yin, , AIDA, HW_AIDA003, 76356, 24.02.2014 10:30, 24.02.2014 11:22, Unknown 

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ...

Entry  Thu Jan 23 22:47:49 2014, Hao Yin, , AIDA, CalibrationRun001, 83800, 23.01.2014 13:35:55, 23.01.2014 02:08:15, Good 

taken with tuxdaq...

HV=75V  I=?3.7uA?
position = 0 / -30 mm relative to initial (but again centered) ?
?5GeV beam, single sample? (software trigger run)
?narrow timing (trigger width)?

Entry  Mon Jan 13 01:58:14 2014, Markus Friedl, AIDA, run, run057, 900k, 13.01.2014 01:56:26, 13.01.2014 10:48:22, Good 

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered)
5GeV beam, single sample
narrow timing (trigger width)

Entry  Sun Jan 12 18:04:18 2014, Markus Friedl, AIDA, run, run056, 510k, 12.01.2014 17:59:57, 13.01.2014 01:47:50, Good 

HV=100V  I=3.7uA
position = -25 / 0 mm relative to initial
5GeV beam, 6 samples
narrow timing (trigger width)

Something strange with x/y stage: stuck at approximately y=+3.5 (hitting box lid?), now back to 0, but about 180 strips off compared to run054 (y=0 as well)...

Entry  Sun Jan 12 10:36:37 2014, Markus Friedl, AIDA, run, run055, 310913, 12.01.2014 10:34:44, 12.01.2014 15:42:47, Good 

HV=100V  I=3.6uA
position = 23 / -35 mm relative to before
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Sat Jan 11 22:32:19 2014, Markus Friedl, AIDA, run, run054, 800k, 11.01.2014 22:30:44, 12.01.2014 10:13:10, Good 

HV=150V  I=5.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Sat Jan 11 20:56:29 2014, Markus Friedl, AIDA, run, run053, 100k, 11.01.2014 20:55:29, 11.01.2014 22:25:43, Good 

HV=140V  I=7.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Fri Jan 10 13:04:49 2014, Markus Friedl, AIDA, run, run052, 100k, 10.01.2014 13:04:05, 10.01.2014 14:30:18, Good 

HV=130V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Fri Jan 10 11:26:54 2014, Markus Friedl, AIDA, run, run051, 100k, 10.01.2014 11:26:08, 10.01.2014 12:53:12, Good 

HV=120V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Fri Jan 10 09:54:11 2014, Markus Friedl, AIDA, run, run050, 100k, 10.01.2014 09:53:13, 10.01.2014 11:21:12, Good 

HV=110V  I=4.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Fri Jan 10 08:21:46 2014, Markus Friedl, AIDA, run, run049, 100k, 10.01.2014 08:20:49 , 10.01.2014 09:49:46, Good 

HV=100V  I=4.2uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Fri Jan 10 00:58:46 2014, Markus Friedl, AIDA, run, run048, 500k, 10.01.2014 00:57:48, 10.01.2014 08:17:57, Good 

HV=90V  I=3.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Thu Jan 9 23:27:27 2014, Markus Friedl, AIDA, run, run047, 100k, 09.01.2014 23:26:35, 10.01.2014 00:52:56, Good 

HV=80V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Thu Jan 9 21:41:20 2014, Markus Friedl, AIDA, run, run046, 100k, 09.01.2014 21:40:29, 09.01.2014 23:07:16, Good 

HV=70V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Thu Jan 9 19:37:33 2014, Markus Friedl, AIDA, run, run045, 100k, 09.01.2014 19:36:21, 09.01.2014 21:01:31 , Good 

HV=60V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

ELOG V3.1.5-fc6679b