Mon Jan 6 18:06:16 2014, Markus Friedl, Infineon, run, run003, 200k, 06.01.2014 18:04:14, 06.01.2014 18:44:15, Good
|
HV=200V I=9.3uA
position centered horizontally (+5mm)
DESY table z=-346 x=-255
3 GeV beam momentum |
Mon Jan 6 17:17:47 2014, Markus Friedl, Infineon, run, run002, 200k, 06.01.2014 17:14:39, 06.01.2014 18:00:34, Good
|
HV=100V I=8.5uA
position centered horizontally (+5mm)
DESY table z=-346 x=-255
3 GeV beam momentum |
Mon Jan 6 16:33:13 2014, Markus Friedl, Infineon, run, run001, 200k, 06.01.2014 16:28:58, 06.01.2014 17:10:56, Good
|
HV=300V I=11.1uA
position centered horizontally (+5mm)
DESY table z=-346 x=-255
3 GeV beam momentum |
Sun Jan 5 15:08:09 2014, Markus Friedl, AIDA, cal, cal002, 83800, 05.01.2014 15:01:32, 05.01.2014 15:30:36, Good
|
HV=100V I=6uA |
Sat Jan 4 16:30:46 2014, Markus Friedl, Infineon, cal, cal001, 83800, 04.01.2014 16:16:51, 04.01.2014 16:25:46, Good
|
HV=300V I=9.3uA (total) |
Mon Jan 6 19:10:36 2014, Thomas Bergauer, common, Beam Momentum 3GeV/c, run001 to run012, , , , Unknown
|
We have set the beam momentum to 3 GeV |
Tue Jan 7 02:17:14 2014, Thomas Bergauer, , beam momentum 6GeV/c, run013, , , , Unknown
|
|
Tue Jan 7 09:33:51 2014, Thomas Bergauer, common, beam momentum back to 3Gev/c, run014 and later ones, , , , Unknown
|
|
Tue Jan 7 14:51:45 2014, Thomas Bergauer, Belle SVD, TLU control, , , , , Unknown
|
1. ssh bastion
2. ssh belle-control
3. ssh telescope-admin@tb-aconite
(password telescope++)
dann:
How to generate trigger from TLU through FTSW to detector systems
2014.1.6 Mikihiko Nakao
* step 1 - open monitor window to show the FTSW status
[you@bastion03 ~]$ ssh telescope-admin@belle-rpc1
(still only limited people has access to b2daq account:
ask DAQ people or Katsuro Nakamura of SVD group)
[b2daq@belle-rpc1 ~]$ ssh telescope-admin@ttd10
[b2daq@ttd10 ~]$ statft -55 -i -c
(55 is the FTSW board-id, -i -c are to show the status repeatedly)
* step 2 - initialize FTSW to accept TLU trigger
[b2daq@ttd10 ~]$ trigft -55 tlu
* step 3 - start trigger at TLU
[you@bastion03 ~]$ ssh belle-rpc2
[you@belle-rpc2 ~]$ ssh telescope-admin@tb-aconite
(ask Alan Campbell or somebody for the password)
telescope-admin@tb-aconite:~$ cd eudaq-nakao/bin
...$ ./TLUControl.exe -a 4 -d 1 -i RJ45 -w 10 -n
here, -a option gives the possible trigger coincidence
(-a 1 --- dummy trigger generator from FTSW)
-a 2 --- trigger counter 1 only
-a 4 --- trigger counter 2 only
-a 8 --- trigger counter 3 only
-a 6 --- trigger counter 1 and 2
-a 10 --- trigger counter 1 and 3
-a 12 --- trigger counter 2 and 2
-a 14 --- trigger counter 1 and 2 and 3
other options are kept to be the same
-d 1 -i RJ45 --- connection to FTSW
-w 10 --- update frequency (10msec)
-n --- suppress messages
This gives you output like:
Status: 00,--,--,--,--,-- (0,0)
Scalers: 0, 7, 0, 0 <== from FTSW-dummy and trigger counters 1, 2, 3
Particles: 1
Triggers: 0 <== actual trigger to be distributed to FTSW
Entries: 0
TS errors: 0, 0 (redundancy, re-read)
Timestamp: 0x4f25a008 (1327865864) = 3.45791
Time: 3.463 s, Freq: 0 Hz, Average: 0 Hz
- |
Thu Jan 9 11:02:14 2014, Markus Friedl, AIDA, info, , , , , Unknown
|
Created bad strip masks for the AIDA config files |
Thu Jan 9 14:47:21 2014, Thomas Bergauer, common, position of DESY Table, , , , , Unknown
|
BEAM mode:
- height (z): -346 (initially: -357)
- horizontal (x): -255
OFF BEAM mode (Parkposition):
- height (z): +37
- horizontal (x): -255
|
Fri Jan 10 11:02:31 2014, Markus Friedl, Belle SVD, Power supply, , , 10.01.2014 11:00:00, , Unknown
|
|
Mon Jan 13 12:02:40 2014, Markus Friedl, common, Kontakt, , , , , Unknown
|
Richard Thalmeier Tel. 4801
Hao Yin |
Sun Jan 19 18:01:46 2014, Christian Irmler, common, AIDA setup operated with TuxDAQ, , , , , Unknown
|
New SIS driver version sis1100-2.13-3 installed on DAQPC.
To install the driver call as root:
cd /lib/modules/2.6.18-371.3.1.el5/extra
/sbin/modprobe sis1100
Check if /dev/sis* are created.
Managed to run the AIDA setup with old TuxDAQ version from T. Obermayer.
Will now try to install a newer version, which also supports ADC delay scan and internal calibration. |
Fri Jan 24 00:21:16 2014, Hao Yin, , AIDA, HW_AIDA001, 40k, 24.02.2014 00:18, , Unknown
|
HV=100V I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ... |
Fri Jan 24 11:03:14 2014, Wolfgang Treberspurg, AIDA, AIDA, HW_AIDA002, 0, 24.01.2014 10:02, , Crap
|
TuxDaq crashed |
Fri Jan 24 18:02:46 2014, Wolfgang Treberspurg, Infineon, New Infineon Stack, , , , , Good
|
Exchanged AIDA stack with modified Infineon Stack
Configuration:
Beam Infineon_TB_2014_Baby1(P0) --- Inifineon_TB_2014_Baby2(P1) ||| Infineon_TB_2012_Baby2(P2) --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0) --- Infineon_TB_2012_Strixel_Bottom-right(N1) --- |
|