Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 4 of 5  Not logged in ELOG logo
Entry  Tue Jan 7 16:36:49 2014, Markus Friedl, Infineon, run, run024, 200k, 07.01.2014 16:35:44, 07.01.2014 17:03:10, Good 

HV=210V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 15:54:22 2014, Markus Friedl, Infineon, run, run023, 200k, 07.01.2014 15:53:06, 07.01.2014 16:25:26, Good 

HV=200V  I=8.0uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 15:16:11 2014, Markus Friedl, Infineon, run, run022, 200k, 07.01.2014 15:15:09, 07.01.2014 15:42:17, Good 

HV=150V  I=7.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 14:47:38 2014, Markus Friedl, Infineon, run, run021, 200k, 07.01.2014 14:46:08, 07.01.2014 15:13:23, Good 

HV=100V  I=7.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 13:20:48 2014, Markus Friedl, Infineon, run, run020, 300k, 07.01.2014 13:18:52, 07.01.2014 14:35:49, Good 

HV=300V  I=8.5uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

multi6 with same settings as run019 (htr+3)

Beam energy = 3 GeV

Entry  Tue Jan 7 11:52:27 2014, Markus Friedl, Infineon, run, run019, 650k, 07.01.2014 11:47:24, 07.01.2014 13:15:21, Good 

HV=300V  I=9.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single sample run

Beam energy = 3 GeV

Entry  Tue Jan 7 09:33:16 2014, Thomas Bergauer, , run, run017, 100k, 07.01.2014 09:31:45, 07.01.2014 09:52:58, Good 
HV=300V  I=9.08uA
position adapted to center beam better (+10mm horizonal)

DESY table z=-346 x=-255 

3Gev/c

Entry  Tue Jan 7 09:22:09 2014, Thomas Bergauer, , run, run016, 50k, 07.01.2014 09:19:10, 07.01.2014 09:30:03, Good 
HV=290V  I=9.00uA
position move back to original position (0mm/0mm) (not hitting the right APVs anymore)

DESY table z=-346 x=-255 

Entry  Tue Jan 7 09:12:24 2014, Thomas Bergauer, Belle SVD, run, run015, 20k, 07.01.2014 09:10:52, 07.01.2014 09:15:39, Good 

 HV=290V  I=9.55uA

position centered horizontally (+5mm)
DESY table z=-346 x=-255
 
energy switched back to 3Gev/c
Entry  Tue Jan 7 08:36:29 2014, Thomas Bergauer, Infineon, run, run014, 20k, 07.01.2014 08:34:06, 07.01.2014 09:05:47, Good 
HV=290V  I=9.55uA
position centered horizontally (+5mm)

DESY table z=-346 x=-255 

6Gev/c,

bad strip region hardly hit

Entry  Tue Jan 7 02:18:26 2014, Markus Friedl, Infineon, run, run013, 215k, 07.01.2014 02:14:50, 07.01.2014 08:31:25, Crap 

HV=150V  I=7.90uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

 

close to end: switched to 6GeV

bias voltage accidentally left at 150V instead of initially planned 290V

Entry  Tue Jan 7 00:36:03 2014, Markus Friedl, Infineon, run, run012, 190k, 07.01.2014 00:33:58, 07.01.2014 02:12:32 , Good 

HV=150V  I=8.0uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

 

close to end: switched to 6GeV

Entry  Mon Jan 6 23:50:59 2014, Markus Friedl, Infineon, run, run011, 200k, 06.01.2014 23:49:09, 07.01.2014 00:30:38 , Good 

HV=280V  I=9.6uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 23:06:51 2014, Markus Friedl, Infineon, run, run010, 200k, 06.01.2014 23:03:23, 06.01.2014 23:47:02 , Good 

HV=270V  I=9.6uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 22:23:39 2014, Markus Friedl, Infineon, run, run009, 200k, 06.01.2014 22:22:10, 06.01.2014 23:03:23, Good 

HV=260V  I=9.3uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 21:40:29 2014, Markus Friedl, Infineon, run, run008, 200k, 06.01.2014 21:38:46, 06.01.2014 22:20:13, Good 

HV=210V  I=9.0uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 20:57:38 2014, Markus Friedl, Infineon, run, run007, 200k, 06.01.2014 20:56:08, 06.01.2014 21:36:54, Good 

HV=220V  I=9.1uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 20:14:21 2014, Markus Friedl, Infineon, run, run006, 200k, 06.01.2014 20:12:20, 06.01.2014 20:54:34, Good 

HV=240V  I=9.4uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 19:31:44 2014, Markus Friedl, AIDA, run, run005, 200k, 06.01.2014 19:29:52, 06.01.2014 20:09:59, Good 

HV=230V  I=9.9uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

Entry  Mon Jan 6 18:49:00 2014, Markus Friedl, Infineon, run, run004, 200k, 06.01.2014 18:47:38, 06.01.2014 19:27:33, Good 

HV=250V  I=9.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

ELOG V3.1.5-fc6679b