Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, all entries  Not logged in ELOG logo
ID Date Author Project Subjectdown Run Number Events StartTime EndTime Data
  24   Tue Jan 7 11:50:34 2014 Markus FriedlInfineonscanrun018x10k07.01.2014 11:xx:xx07.01.2014 11:xx:xxGood

Delay scan with single sample

Several runs

  3   Mon Jan 6 16:33:13 2014 Markus FriedlInfineonrunrun001200k06.01.2014 16:28:5806.01.2014 17:10:56Good

HV=300V  I=11.1uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  4   Mon Jan 6 17:17:47 2014 Markus FriedlInfineonrunrun002200k06.01.2014 17:14:3906.01.2014 18:00:34Good

HV=100V  I=8.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  5   Mon Jan 6 18:06:16 2014 Markus FriedlInfineonrunrun003200k06.01.2014 18:04:1406.01.2014 18:44:15Good

HV=200V  I=9.3uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  6   Mon Jan 6 18:49:00 2014 Markus FriedlInfineonrunrun004200k06.01.2014 18:47:3806.01.2014 19:27:33Good

HV=250V  I=9.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  8   Mon Jan 6 19:31:44 2014 Markus FriedlAIDArunrun005200k06.01.2014 19:29:5206.01.2014 20:09:59Good

HV=230V  I=9.9uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  9   Mon Jan 6 20:14:21 2014 Markus FriedlInfineonrunrun006200k06.01.2014 20:12:2006.01.2014 20:54:34Good

HV=240V  I=9.4uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  10   Mon Jan 6 20:57:38 2014 Markus FriedlInfineonrunrun007200k06.01.2014 20:56:0806.01.2014 21:36:54Good

HV=220V  I=9.1uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  11   Mon Jan 6 21:40:29 2014 Markus FriedlInfineonrunrun008200k06.01.2014 21:38:4606.01.2014 22:20:13Good

HV=210V  I=9.0uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  12   Mon Jan 6 22:23:39 2014 Markus FriedlInfineonrunrun009200k06.01.2014 22:22:1006.01.2014 23:03:23Good

HV=260V  I=9.3uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  13   Mon Jan 6 23:06:51 2014 Markus FriedlInfineonrunrun010200k06.01.2014 23:03:2306.01.2014 23:47:02 Good

HV=270V  I=9.6uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  14   Mon Jan 6 23:50:59 2014 Markus FriedlInfineonrunrun011200k06.01.2014 23:49:0907.01.2014 00:30:38 Good

HV=280V  I=9.6uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  15   Tue Jan 7 00:36:03 2014 Markus FriedlInfineonrunrun012190k07.01.2014 00:33:5807.01.2014 02:12:32 Good

HV=150V  I=8.0uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

 

close to end: switched to 6GeV

  18   Tue Jan 7 02:18:26 2014 Markus FriedlInfineonrunrun013215k07.01.2014 02:14:5007.01.2014 08:31:25Crap

HV=150V  I=7.90uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

 

close to end: switched to 6GeV

bias voltage accidentally left at 150V instead of initially planned 290V

  19   Tue Jan 7 08:36:29 2014 Thomas BergauerInfineonrunrun01420k07.01.2014 08:34:0607.01.2014 09:05:47Good
HV=290V  I=9.55uA
position centered horizontally (+5mm)

DESY table z=-346 x=-255 

6Gev/c,

bad strip region hardly hit

  20   Tue Jan 7 09:12:24 2014 Thomas BergauerBelle SVDrunrun01520k07.01.2014 09:10:5207.01.2014 09:15:39Good

 HV=290V  I=9.55uA

position centered horizontally (+5mm)
DESY table z=-346 x=-255
 
energy switched back to 3Gev/c
  21   Tue Jan 7 09:22:09 2014 Thomas Bergauer runrun01650k07.01.2014 09:19:1007.01.2014 09:30:03Good
HV=290V  I=9.00uA
position move back to original position (0mm/0mm) (not hitting the right APVs anymore)

DESY table z=-346 x=-255 

  22   Tue Jan 7 09:33:16 2014 Thomas Bergauer runrun017100k07.01.2014 09:31:4507.01.2014 09:52:58Good
HV=300V  I=9.08uA
position adapted to center beam better (+10mm horizonal)

DESY table z=-346 x=-255 

3Gev/c

  25   Tue Jan 7 11:52:27 2014 Markus FriedlInfineonrunrun019650k07.01.2014 11:47:2407.01.2014 13:15:21Good

HV=300V  I=9.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single sample run

Beam energy = 3 GeV

  26   Tue Jan 7 13:20:48 2014 Markus FriedlInfineonrunrun020300k07.01.2014 13:18:5207.01.2014 14:35:49Good

HV=300V  I=8.5uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

multi6 with same settings as run019 (htr+3)

Beam energy = 3 GeV

  27   Tue Jan 7 14:47:38 2014 Markus FriedlInfineonrunrun021200k07.01.2014 14:46:0807.01.2014 15:13:23Good

HV=100V  I=7.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  29   Tue Jan 7 15:16:11 2014 Markus FriedlInfineonrunrun022200k07.01.2014 15:15:0907.01.2014 15:42:17Good

HV=150V  I=7.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  30   Tue Jan 7 15:54:22 2014 Markus FriedlInfineonrunrun023200k07.01.2014 15:53:0607.01.2014 16:25:26Good

HV=200V  I=8.0uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  31   Tue Jan 7 16:36:49 2014 Markus FriedlInfineonrunrun024200k07.01.2014 16:35:4407.01.2014 17:03:10Good

HV=210V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  32   Tue Jan 7 17:09:56 2014 Markus FriedlInfineonrunrun025200k07.01.2014 17:08:5407.01.2014 17:36:12Good

HV=220V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  33   Tue Jan 7 17:39:20 2014 Markus FriedlInfineonrunrun026200k07.01.2014 17:38:0107.01.2014 18:05:11Good

HV=230V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  34   Tue Jan 7 18:11:52 2014 Markus FriedlInfineonrunrun027200k07.01.2014 18:10:4507.01.2014 18:37:42Good

HV=240V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  35   Tue Jan 7 18:41:55 2014 Markus FriedlInfineonrunrun028200k07.01.2014 18:40:4007.01.2014 19:07:32Good

HV=250V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  36   Tue Jan 7 19:12:07 2014 Markus FriedlInfineonrunrun029200k07.01.2014 19:11:0507.01.2014 19:38:00Good

HV=260V  I=8.7uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  37   Tue Jan 7 19:44:45 2014 Markus FriedlInfineonrunrun030200k07.01.2014 19:43:3507.01.2014 20:11:03Good

HV=270V  I=8.6uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  38   Tue Jan 7 20:26:50 2014 Markus FriedlInfineonrunrun031200k07.01.2014 20:25:3207.01.2014 20:58:47Good

HV=280V  I=8.4uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  39   Tue Jan 7 21:02:58 2014 Markus FriedlInfineonrunrun032200k07.01.2014 21:01:4207.01.2014 21:29:03Good

HV=290V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

  40   Tue Jan 7 21:34:41 2014 Markus FriedlInfineonrunrun0334.117.024 (4M)07.01.2014 21:33:1208.01.2014 08:52:37Good

HV=300V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

 

beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.

  42   Wed Jan 8 14:10:07 2014 Thomas BergauerAIDArunrun03521168108.01.2014 14:01:2508.01.2014 17:03:55Unknown

 HV=100V  I=4.2uA

position adapted to center beam
 

accidentally hit reset button on PC which ended this run abruptly...

 

5 GeV beam

  43   Wed Jan 8 17:20:40 2014 Markus FriedlAIDArunrun036320k08.01.2014 17:18:5108.01.2014 22:14:58Unknown

 HV=100V  I=4.3uA

centered position

5GeV beam

narrow timing (trigger width), but 6 samples

 

  44   Wed Jan 8 22:19:11 2014 Markus FriedlAIDArunrun0371.2M08.01.2014 22:18:3009.01.2014 10:08:14Good

HV=100V  I=4.4uA
centered position
5GeV beam, single sample
narrow timing (trigger width)

 

  47   Thu Jan 9 11:04:34 2014 Markus FriedlAIDArunrun039100k09.01.2014 11:02:3609.01.2014 12:28:41Good

HV=10V  I=2.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  48   Thu Jan 9 12:31:29 2014 Markus FriedlAIDArunrun040100k09.01.2014 12:30:3209.01.2014 13:55:47Good

HV=20V  I=2.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  49   Thu Jan 9 14:07:31 2014 Markus FriedlAIDArunrun041100k09.01.2014 14:06:3209.01.2014 15:33:13Good

HV=30V  I=3.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  51   Thu Jan 9 16:36:30 2014 Markus FriedlAIDArunrun042100k09.01.2014 16:35:4309.01.2014 18:02:17Good

HV=40V  I=3.4uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

  52   Thu Jan 9 18:09:40 2014 Markus FriedlAIDArunrun044100k09.01.2014 18:08:1909.01.2014 19:35:21Good

HV=50V  I=3.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

MOVED TIMING by 1 clock (now signal is centered again)

  53   Thu Jan 9 19:37:33 2014 Markus FriedlAIDArunrun045100k09.01.2014 19:36:2109.01.2014 21:01:31 Good

HV=60V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  54   Thu Jan 9 21:41:20 2014 Markus FriedlAIDArunrun046100k09.01.2014 21:40:2909.01.2014 23:07:16Good

HV=70V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  55   Thu Jan 9 23:27:27 2014 Markus FriedlAIDArunrun047100k09.01.2014 23:26:3510.01.2014 00:52:56Good

HV=80V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  56   Fri Jan 10 00:58:46 2014 Markus FriedlAIDArunrun048500k10.01.2014 00:57:4810.01.2014 08:17:57Good

HV=90V  I=3.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  57   Fri Jan 10 08:21:46 2014 Markus FriedlAIDArunrun049100k10.01.2014 08:20:49 10.01.2014 09:49:46Good

HV=100V  I=4.2uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  58   Fri Jan 10 09:54:11 2014 Markus FriedlAIDArunrun050100k10.01.2014 09:53:1310.01.2014 11:21:12Good

HV=110V  I=4.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  60   Fri Jan 10 11:26:54 2014 Markus FriedlAIDArunrun051100k10.01.2014 11:26:0810.01.2014 12:53:12Good

HV=120V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  61   Fri Jan 10 13:04:49 2014 Markus FriedlAIDArunrun052100k10.01.2014 13:04:0510.01.2014 14:30:18Good

HV=130V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  62   Sat Jan 11 20:56:29 2014 Markus FriedlAIDArunrun053100k11.01.2014 20:55:2911.01.2014 22:25:43Good

HV=140V  I=7.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  63   Sat Jan 11 22:32:19 2014 Markus FriedlAIDArunrun054800k11.01.2014 22:30:4412.01.2014 10:13:10Good

HV=150V  I=5.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  64   Sun Jan 12 10:36:37 2014 Markus FriedlAIDArunrun05531091312.01.2014 10:34:4412.01.2014 15:42:47Good

HV=100V  I=3.6uA
position = 23 / -35 mm relative to before
5GeV beam, 6 samples
narrow timing (trigger width)

  65   Sun Jan 12 18:04:18 2014 Markus FriedlAIDArunrun056510k12.01.2014 17:59:5713.01.2014 01:47:50Good

HV=100V  I=3.7uA
position = -25 / 0 mm relative to initial
5GeV beam, 6 samples
narrow timing (trigger width)

Something strange with x/y stage: stuck at approximately y=+3.5 (hitting box lid?), now back to 0, but about 180 strips off compared to run054 (y=0 as well)...

  66   Mon Jan 13 01:58:14 2014 Markus FriedlAIDArunrun057900k13.01.2014 01:56:2613.01.2014 10:48:22Good

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered)
5GeV beam, single sample
narrow timing (trigger width)

  50   Thu Jan 9 14:47:21 2014 Thomas Bergauercommonposition of DESY Table    Unknown

BEAM mode:

  • height (z): -346 (initially: -357)
  • horizontal (x): -255 

OFF BEAM mode (Parkposition):

  • height (z): +37
  • horizontal (x): -255 

 

  41   Wed Jan 8 12:40:30 2014 Thomas BergauerAIDAintcal AIDA Stackcal03483.8k08.01.2014 12:32:2208.01.2014 13:01:30Unknown

 HV=100V  I=4.5uA

position adapted to center beam
 
  46   Thu Jan 9 11:02:14 2014 Markus FriedlAIDAinfo    Unknown

Created bad strip masks for the AIDA config files

  1   Sat Jan 4 16:30:46 2014 Markus FriedlInfineoncalcal0018380004.01.2014 16:16:5104.01.2014 16:25:46Good

HV=300V  I=9.3uA  (total)

  2   Sun Jan 5 15:08:09 2014 Markus FriedlAIDAcalcal0028380005.01.2014 15:01:3205.01.2014 15:30:36Good

HV=100V  I=6uA

  45   Thu Jan 9 10:10:31 2014 Markus FriedlAIDAcalcal0388380009.01.2014 10:09:2709.01.2014 10:38:23Good

HV=100V  I=4.2uA
centered position
5GeV beam, single sample
narrow timing (trigger width)

  23   Tue Jan 7 09:33:51 2014 Thomas Bergauercommonbeam momentum back to 3Gev/crun014 and later ones   Unknown
  17   Tue Jan 7 02:17:14 2014 Thomas Bergauer beam momentum 6GeV/crun013   Unknown
  28   Tue Jan 7 14:51:45 2014 Thomas BergauerBelle SVDTLU control    Unknown

1. ssh bastion

2. ssh belle-control

3. ssh telescope-admin@tb-aconite
(password telescope++)

dann:

How to generate trigger from TLU through FTSW to detector systems
2014.1.6 Mikihiko Nakao

* step 1 - open monitor window to show the FTSW status

 [you@bastion03 ~]$ ssh telescope-admin@belle-rpc1
  (still only limited people has access to b2daq account:
   ask DAQ people or Katsuro Nakamura of SVD group)

 [b2daq@belle-rpc1 ~]$ ssh telescope-admin@ttd10
 [b2daq@ttd10 ~]$ statft -55 -i -c
   (55 is the FTSW board-id, -i -c are to show the status repeatedly)

* step 2 - initialize FTSW to accept TLU trigger

 [b2daq@ttd10 ~]$ trigft -55 tlu

* step 3 - start trigger at TLU

 [you@bastion03 ~]$ ssh belle-rpc2
 [you@belle-rpc2 ~]$ ssh telescope-admin@tb-aconite
  (ask Alan Campbell or somebody for the password)

 telescope-admin@tb-aconite:~$ cd eudaq-nakao/bin
 ...$ ./TLUControl.exe -a 4 -d 1 -i RJ45 -w 10 -n

 here, -a option gives the possible trigger coincidence
  (-a 1  --- dummy trigger generator from FTSW)
   -a 2  --- trigger counter 1 only
   -a 4  --- trigger counter 2 only
   -a 8  --- trigger counter 3 only
   -a 6  --- trigger counter 1 and 2
   -a 10 --- trigger counter 1 and 3
   -a 12 --- trigger counter 2 and 2
   -a 14 --- trigger counter 1 and 2 and 3
 other options are kept to be the same
   -d 1 -i RJ45 --- connection to FTSW
   -w 10        --- update frequency (10msec)
   -n           --- suppress messages

 This gives you output like:

   Status:    00,--,--,--,--,-- (0,0)
   Scalers:   0, 7, 0, 0    <== from FTSW-dummy and trigger counters 1, 2, 3
   Particles: 1
   Triggers:  0             <== actual trigger to be distributed to FTSW
   Entries:   0
   TS errors: 0, 0 (redundancy, re-read)
   Timestamp: 0x4f25a008 (1327865864) = 3.45791
   Time: 3.463 s, Freq: 0 Hz, Average: 0 Hz

- 

  81   Wed Jan 29 12:02:52 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_001100k28.01.2014 16:3028.01.2014 16:50Good

HV at 0V; I at app. 5nA 3GeV, Single mode

 

  82   Wed Jan 29 12:04:53 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_002140k28.01.2014 16:5028.01.2014 17:20Good

HV at 100V; I at app. 8.5µA 3GeV, Single mode

 

  83   Wed Jan 29 12:07:48 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_003200k28.01.2014 17:4028.01.2014 18:20Good

HV at 150V; I at app. 9µA 3GeV, Single mode

 

  84   Wed Jan 29 12:08:52 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_004200k28.01.2014 19:3028.01.2014 20:00Good

HV at 200V; I at app. 9.5µA 3GeV, Single mode

 

  85   Wed Jan 29 12:10:06 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_005200k28.01.2014 20:0028.01.2014 23:00Good

HV at 210V; I at app. 8.5µA 3GeV, Single mode

 

  86   Wed Jan 29 12:11:00 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_006200k28.01.2014 20:3028.01.2014 21:00Good

HV at 220V; I at app. 8.5µA 3GeV, Single mode

 

  87   Wed Jan 29 21:55:09 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_007200k29.01.2014 11:5029.01.2014 12:15Good

HV at 230V; I at app. 8µA 3GeV, Single mode

 

  88   Wed Jan 29 21:56:15 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_008200k29.01.2014 12:1529.01.2014 12:45Good

HV at 240V; I at app. 7.5µA 3GeV, Single mode

 

  89   Wed Jan 29 21:56:58 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_009110k29.01.2014 12:5029.01.2014 13:15Good

HV at 250V; I at app. 7.5µA 3GeV, Single mode

 

  90   Wed Jan 29 21:57:55 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_010100k29.01.2014 13:2029.01.2014 13:35Good

HV at 260V; I at app. 7.6µA 3GeV, Single mode

 

  91   Wed Jan 29 21:59:51 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_011200k29.01.2014 13:4529.01.2014 14:20Good

HV at 270V; I at app. 7.6µA 3GeV, Single mode

 

  92   Wed Jan 29 22:01:08 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_012200k29.01.2014 14:2529.01.2014 15:26Good

HV at 280V; I at app. 8µA 3GeV, Single mode

 

  93   Wed Jan 29 22:02:04 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_013200k29.01.2014 15:2629.01.2014 17:00Good

HV at 290V; I at app. 8µA 3GeV, Single mode

 

  94   Wed Jan 29 22:03:15 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_014200k29.01.2014 18:1529.01.2014 18:45Good

HV at 260V; I at app. 7.5µA 3GeV, Single mode

 

  95   Wed Jan 29 22:06:12 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_BiasScan_015200k29.01.2014 19:1529.01.2014 19:45Good

HV at 300V; I at app. 7.5µA 3GeV, Single mode

 

  96   Wed Jan 29 22:08:48 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias Scan  29.01.2014 22:0029.01.2014 22:00Good

All Infineon Stack 2 runs have been taken at table position: 1.089030, -12.800610

 

  97   Wed Jan 29 22:36:35 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_pos1_001200k29.01.2014 22:1529.01.2014 22:35Good

HV at 300V; I at app. 7.5µA 3GeV, Single mode

Position changed to -3.910970 -17.800610

 

  98   Wed Jan 29 22:40:09 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2 Bias ScanHW_Run_Infineon_Stack2_pos2_002200k29.01.2014 22:4029.01.2014 23:15Good

HV at 300V; I at app. 7.5µA 3GeV, Single mode

Position changed to --8.91097 -22.80061

 

  74   Sat Jan 25 18:24:03 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0011.05 M25.01.2014 10:3025.01.2014 15:40Unknown

HV at 300V; I at app. 11µA 4GeV, Single mode

Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)

-> HV connection will be checked at next opportunity to enter area.

  78   Sun Jan 26 19:12:42 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0024 M25.01.2014 22:3026.01.2014 15:15Good

HV at 300V; I at app. 11µA 4GeV, Single mode

 

  79   Sun Jan 26 19:14:07 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_003140 k26.01.2014 18:1026.01.2014 19:15Good

HV at 300V; I at app. 10µA 5GeV, Single mode

 

  80   Mon Jan 27 12:20:53 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_004800k27.01.2014 09:1027.01.2014 12:15Good

HV at 300V; I at app. 10µA 3GeV, Single mode

 

  59   Fri Jan 10 11:02:31 2014 Markus FriedlBelle SVDPower supply  10.01.2014 11:00:00 Unknown
Attachment 1: KenWood100114.png
KenWood100114.png
  73   Fri Jan 24 18:02:46 2014 Wolfgang TreberspurgInfineonNew Infineon Stack    Good

Exchanged AIDA stack with modified Infineon Stack

Configuration:

Beam   Infineon_TB_2014_Baby1(P0)   ---   Inifineon_TB_2014_Baby2(P1) |||  Infineon_TB_2012_Baby2(P2)  --- Infineon_TB_2012_Baby1(P3) ||| Infineon_TB_2012_Strixel_Top-left(N0)  --- Infineon_TB_2012_Strixel_Bottom-right(N1) ---

  76   Sat Jan 25 18:46:32 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_001340k25.01.2014 16:3025.01.2014 18:40Unknown

HV 300V, I 10µA

Beam Energy changed during the run between 2GeV - 5GeV - 4GeV

Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93

  77   Sat Jan 25 21:14:46 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_002230k25.01.2014 19:0025.01.2014 21:15Good

HV 300V, I 10µA

Beam Energy  4GeV

Latency changed to 93

  67   Mon Jan 13 12:02:40 2014 Markus FriedlcommonKontakt    Unknown

Richard Thalmeier   Tel. 4801

Hao Yin  

  75   Sat Jan 25 18:28:38 2014 Wolfgang TreberspurgInfineonCalibration run Infineon Stack 2Calibration_Run_Infineon_Stack2_0018290025.01.2014 10:1525.01.2014 10:25Unknown

HV 300V, I ca. 11µA single mode

  7   Mon Jan 6 19:10:36 2014 Thomas BergauercommonBeam Momentum 3GeV/crun001 to run012   Unknown

We have set the beam momentum to 3 GeV 

Attachment 1: IMG_1517.jpg
IMG_1517.jpg
Attachment 2: IMG_1516.jpg
IMG_1516.jpg
  68   Sun Jan 19 18:01:46 2014 Christian IrmlercommonAIDA setup operated with TuxDAQ    Unknown

New SIS driver version sis1100-2.13-3 installed on DAQPC. 

To install the driver call as root:

cd /lib/modules/2.6.18-371.3.1.el5/extra

/sbin/modprobe sis1100

Check if /dev/sis* are created.

Managed to run the AIDA setup with old TuxDAQ version from T. Obermayer.

Will now try to install a newer version, which also supports ADC delay scan and internal calibration.

  69   Thu Jan 23 22:47:49 2014 Hao Yin AIDACalibrationRun0018380023.01.2014 13:35:5523.01.2014 02:08:15Good

taken with tuxdaq...

HV=75V  I=?3.7uA?
position = 0 / -30 mm relative to initial (but again centered) ?
?5GeV beam, single sample? (software trigger run)
?narrow timing (trigger width)?

  70   Fri Jan 24 00:21:16 2014 Hao Yin AIDAHW_AIDA00140k24.02.2014 00:18 Unknown

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ...

  71   Fri Jan 24 11:03:14 2014 Wolfgang TreberspurgAIDAAIDAHW_AIDA002024.01.2014 10:02 Crap

TuxDaq crashed

  72   Fri Jan 24 11:23:15 2014 Hao Yin AIDAHW_AIDA0037635624.02.2014 10:3024.02.2014 11:22Unknown

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ...

ELOG V3.1.5-fc6679b