Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Alibava/Mapsa testbeam at DESY in April 2017 (Axel, Grossi), Page 3 of 7  Not logged in ELOG logo
Entry  Thu Apr 20 14:09:44 2017, Axel Koenig, ALiBaVa (IFX), run_011_Irrad_350V.dat, 011, 300000, 96, 64, 360, No, Unknown 

Remarks: Telescope run 641. Bias scan -350V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_011_Irrad_350V.dat
Telescope run 641
Triggers 300000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -350
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

360 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 37.9 uA
Entry  Thu Apr 20 15:08:33 2017, Axel Koenig, ALiBaVa (IFX), run_012_Irrad_250V.dat, 012, 300000, 96, 64, 360, No, Unknown 

Remarks: Telescope run 642. Bias scan -250V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_012_Irrad_250V.dat
Telescope run 642
Triggers 300000
Alibava trigger eff. ~66%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -250
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

360 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 32.1 uA
Entry  Thu Apr 20 20:15:12 2017, Axel Koenig, ALiBaVa (IFX), run_015_Irrad_500V.dat, 015, 300000, 96, 64, 350, No, Unknown 

Remarks: Telescope run 647. Bias voltage -500V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

rotation scan.

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_015_Irrad_500V.dat
Telescope run 647
Triggers 300000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -500
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

350 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 39.2 uA
Entry  Thu Apr 20 21:25:21 2017, Axel Koenig, ALiBaVa (IFX), run_014_Irrad_500V.dat, 014, 300000, 96, 69, 360, No, Unknown 

Remarks: Telescope run 646. Bias voltage -500V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

Positoj scan vertical.

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_014_Irrad_500V.dat
Telescope run 646
Triggers 300000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -500
Latency 132
Table x 96 mm
Table z 69 mm
Tabe rot

360 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 39.2 uA
Entry  Thu Apr 13 09:23:20 2017, Axel König, ALiBaVa (IFX), run_005_IFX_CB_10V.dat, 005, 285000, 109, 4.5, 240, No, Unknown 

Remarks: Telescope run 508. Bias scan 10 V.

Parameter Value
Alibava run run_005_IFX_CB_10V.dat
Telescope run 508
Triggers 285000
Alibava trigger eff. ~36.5%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -10
Latency 132
Table x 109 mm
Table z 4.5 mm
Tabe rot

240 deg (parallel to tele. planes)

Entry  Wed Apr 19 22:56:07 2017, Axel Koenig, ALiBaVa (IFX), run_005_Irrad_450V.dat, 005, 2800000, 96, 64, 360, No, Unknown 

Remarks: Telescope run 635. Bias scan -450V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing! Run crashed over night. Triggers valid up to 2032867.

Telescope chiller turned on (15 deg).

Parameter Value
Alibava run run_005_Irrad_450V.dat
Telescope run 635
Triggers 2800000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -450
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

360 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 38.8 uA
Entry  Sun Apr 16 21:43:15 2017, Axel Koenig, ALiBaVa (IFX), run_015_Baby_100V.dat, 015, 2500000, 102.5, 22.5, 240, No, Unknown 

Remarks: Telescope run 592. Long run, bias voltage 100 V. Long run finished without any problems.

Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_015_Baby_100V.dat
Telescope run 592
Triggers 2500000
Alibava trigger eff. ~60%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

240 deg

Entry  Thu Apr 20 22:19:21 2017, Axel Koenig, ALiBaVa (IFX), run_016_Irrad_500V.dat, 016, 2500000, 96, 64, 370, No, Unknown 

Remarks: Telescope run 648. Bias voltage -500V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

rotation scan.

Telescope chiller turned on (15 deg).

Run finished over night!

Parameter Value
Alibava run run_016_Irrad_500V.dat
Telescope run 648
Triggers 2500000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -500
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

370 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 39.2 uA
Entry  Fri Apr 14 01:33:35 2017, Johannes Grossmann, MaPSA, Teleskope Correlation, 52, 250000, 0, No, Unknown 

Telescope 1296

Threshold 90 

Mapsa CLK Delay 0 

Entry  Fri Apr 14 12:26:00 2017, Johannes Grossmann, MaPSA, Alignment Check, 60, 250000, 0, No, Unknown 

Telescope 1312

Threshold 80

Mapsa CLK Delay 0

Carbon fiber  broken at 2:20 AM. Alignement check.

Entry  Fri Apr 14 12:48:44 2017, Johannes Grossmann, MaPSA, Alignment Check, 61, 250000, 0, No, Unknown 

Telescope 1314

Threshold 80

Mapsa CLK Delay 0

Reference Plane Lost aber Anfang Gut

Entry  Fri Apr 14 12:58:08 2017, Johannes Grossmann, MaPSA, Alignment Check, 64, 250000, 0, No, Unknown 

Telescope 1316

Threshold 80

Mapsa CLK Delay 0

Reference Plane Lost aber Anfang Gut

Entry  Fri Apr 14 13:21:07 2017, Johannes Grossmann, MaPSA, Alignment Check, 66, 250000, 0, No, Unknown 

Telescope 1318

Threshold 100

Mapsa CLK Delay 0

Reference Plane Lost aber Anfang Gut

Entry  Sat Apr 15 16:52:06 2017, Axel Koenig, ALiBaVa (IFX), run_001_Baby_100V.dat, 001, 250000, 102.5, 22.5, 240, No, Unknown 

Remarks: Telescope run 562. Telescope chiller turned off (could be the root cause of runs crashing).

Position: 102.5, 22.5, 240 (should be the center of the sensor).

Parameter Value
Alibava run run_001_Baby_100V.dat
Telescope run 562
Triggers 250000
Alibava trigger eff. ~93%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

240 deg (parallel to tele. planes)

Entry  Sat Apr 15 17:38:58 2017, Axel Koenig, ALiBaVa (IFX), run_002_Baby_100V.dat, 002, 250000, 102.5, 12.5, 240, No, Unknown 

Remarks: Telescope run 563. Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_002_Baby_100V.dat
Telescope run 563
Triggers 250000
Alibava trigger eff. ~93%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 12.5 mm
Tabe rot

240 deg (parallel to tele. planes)

Entry  Sat Apr 15 18:31:14 2017, Axel Koenig, ALiBaVa (IFX), run_003_Baby_100V.dat, 003, 250000, 102.5, 32.5, 240, No, Unknown 

Remarks: Telescope run 564. Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_003_Baby_100V.dat
Telescope run 564
Triggers 250000
Alibava trigger eff. ~93%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 32.5 mm
Tabe rot

240 deg (parallel to tele. planes)

Entry  Sat Apr 15 19:20:34 2017, Axel Koenig, ALiBaVa (IFX), run_004_Baby_100V.dat, 004, 250000, 102.5, 22.5, 250, No, Unknown 

Remarks: Telescope run 565. Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_004_Baby_100V.dat
Telescope run 565
Triggers 250000
Alibava trigger eff. ~93%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

250 deg

Entry  Sat Apr 15 20:12:41 2017, Axel Koenig, ALiBaVa (IFX), run_005_Baby_100V.dat, 005, 250000, 102.5, 22.5, 230, No, Unknown 

Remarks: Telescope run 568. Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_005_Baby_100V.dat
Telescope run 568
Triggers 250000
Alibava trigger eff. ~93%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -100
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

230 deg

Entry  Sun Apr 16 20:22:27 2017, Axel Koenig, ALiBaVa (IFX), run_014_Baby_70V.dat, 014, 250000, 102.5, 22.5, 240, No, Unknown 

Remarks: Telescope run 591. Bias scan 70 V.

Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_014_Baby_70V.dat
Telescope run 591
Triggers 250000
Alibava trigger eff. ~60%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -70
Latency 132
Table x 102.5 mm
Table z 22.5 mm
Tabe rot

240 deg

Entry  Mon Apr 17 17:02:34 2017, Axel Koenig, ALiBaVa (IFX), run_003_HPK_CB_200V.dat, 003, 250000, 107, 2.6, 230, No, Unknown 

Remarks: Telescope run 606. Angle scan.

Telescope chiller turned off (could be the root cause of runs crashing).

Parameter Value
Alibava run run_003_HPK_CB_200V.dat
Telescope run 606
Triggers 250000
Alibava trigger eff. ~62%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -200
Latency 132
Table x 107 mm
Table z 2.6 mm
Tabe rot

230 deg

ELOG V3.1.5-fc6679b