Message ID: 143     Entry time: Thu Apr 20 22:19:21 2017
Author: Axel Koenig 
Project: ALiBaVa (IFX) 
Subject: run_016_Irrad_500V.dat 
Run Number: 016 
Events: 2500000 
XYPosition: 96, 64, 370 
Cooling: No 
Data: Unknown 

Remarks: Telescope run 648. Bias voltage -500V, central position of sensor (DUT parallel to telescope planes at 360 deg due to different fixation compared to other DUTs). Telescope geometry identical to double irrad module.

Backside Biasing!

rotation scan.

Telescope chiller turned on (15 deg).

Run finished over night!

Parameter Value
Alibava run run_016_Irrad_500V.dat
Telescope run 648
Triggers 2500000
Alibava trigger eff. ~70%
Beam energy 5.6 GeV
Telescope threshold 6
Bias voltage -500
Latency 132
Table x 96 mm
Table z 64 mm
Tabe rot

370 deg

Temperature at DUT -14.5 +- 1 deg. celsius
Current 39.2 uA