Fri Nov 27 12:22:19 2009, Stephan Hänsel, Measurements, Run 20075 - Micromegas 817
|
46196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ stopped at 46195 events)
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
rate: 4,1 Hz
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Fri Nov 27 12:23:25 2009, Stephan Hänsel, Measurements, Run 20077 - Pedestal
|
16196 events
with 2 Micromegas modules
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Wed Oct 1 11:42:44 2008, stephan hänsel, Setup, Modulkomponenten
|
MODULE 0
1 Sensor Module (SiLC01):
Hybrid: TEC_6D.2.1 / 30216662133923
Sensor: HPK-ILC-6684-01
2 Sensor Module (SiLC02):
Hybrid: TEC_6D.2.1 / 30216662133993
Sensor Near: HPK-ILC-6684-19
Sensor Far: HPK-ILC-6684-05
MODULE 1
1 Sensor Module (SiLC11b):
Hybrid: TEC_6D.2.1 / 30216662133904
Sensor: HPK-ILC-6684-23
2 Sensor Module (SiLC12):
Hybrid: TEC_6D.2.1 / 30216661605173
Sensor Near: HPK-ILC-6684-34
Sensor Far: HPK-ILC-6684-27
(OLD - 1 Sensor Module (SiLC11):
Hybrid: TEC_6D.2.1 / 30216662133922
Sensor: HPK-ILC-6684-23)
|
Fri Feb 27 14:03:53 2009, Stephan Hänsel, Setup, Setup 3D
|
|
Thu Oct 22 08:02:26 2009, Stephan Hänsel, Setup, Electronics
|
HV-Kapton-PIN-assignment
CCUM-to-Module Adapter-Cards
CCUM-to-Module Adapter-Cards Pin-assignment (xls)
schematic of the adopted readout (A.Dierlamm)
TEC-R2-Hybrid |
Thu Oct 22 08:04:51 2009, Stephan Hänsel, Setup, geometry - silicon envelope
|
distance si-sledge-front to silicon-Z-center = 23 cm
-> silicon sledge front 35 cm inside from front of TPC-support at a beam position 58 cm from front of TPC-support
CCU119 = 0x77
- position 7 = I2C16 = SiLC12 -> front X
- position 1 = I2C17 = SiLC11 -> front Z
CCU123 = 0x7b
- position 7 = I2C16 = SiLC01 -> back Z
- position 1 = I2C17 = SiLC02 -> back X
|
Thu Oct 22 11:18:34 2009, Stephan Hänsel, Setup, Pictures
|
Photo Gallery
zusätliche Photos:
labeled SiLC in front of TPC |
Mon Nov 2 13:22:50 2009, Stephan Hänsel, Setup, DAQ
|
start data-taking:
ssh xxx@bastion.desy.de -X
ssh xdaq@flctpcikhero1.desy.de -X
-
at PC reboot:
- source xdaq_profile
- cd scripts
- ./fedpmc 0 + ctrl C when ready //initialise the first FED
- ./fedpmc 1 + ctrl C when ready //initialise the second FED
- ./gatecalib //sets adresses for the TSC + gate
- ./setdll 3 5 //sets width of the gate
when controllring newly connected
- source xdaq_profile (if not done before)
- cd scripts
- ./ProgramTest.exe -pci -reset //-> controllring 0x4c90
test of devices:
- source xdaq_profile (if not done before)
- cd scripts
- ./ProgramTest.exe -pci -scanCCU // searches for CCUs
- ./ProgramTest.exe -pci -scantrackerdevice // searches for CCUs and APVs
start xdaq:
- source xdaq_profile (if not done before)
- /opt/firefox/firefox & -> http://ikhero2.desy.de:40000 // not working for now
- ./xdaq.sh -p40000
- reload firefox
HyperDAQ:
- -> Control Panel -> Configure Cluster -> load /home/xdaq/xml/peak_silc.xml
- tick: Configure Cluster
- -> submit
- -> view Applications -> Tracker Supervisor:
- choose run type -> normal
- tick: TLU in physics Run
- type spillsize = 20
- tick: No gate
if xdaq kills itself:
analysis:
- root:
- in /Analysis/AC1Analysis-1.4>
- .L runAna_silc.C
- runAna(pedestalnumber,runnumber)
get file with number of single events in all 4 sensors + HitProfile
- root
- .L readClusterTree_silc.cxx++
- readClusterTree_silc(event number)
|
Mon Nov 2 13:59:09 2009, Stephan Hänsel, Setup, ToDo before data-taking
|
in hut:
- plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you look from the back of the PC))
- power on CCUM in spacing behind electronic hut
- switch on opto-electrical converter for FED (on top of PC (switch in the back) and switch on power supply (front))
- LV on -> 01,30 and 02,60 (two times)
- HV on -> 200V
T24/1
- power the scintillators for triggering
- move envelope into beamline - sledge front to sensor center is 220,5mm
-> switch on the beam |
Tue Nov 3 10:45:01 2009, Stephan Hänsel, Setup, Beam On
|
clear test beam areas:
go to T24 (front area):
- use (red) key from interlock
- go into T24 area, close door, use red key in keyhole next to door -> big red light on
- push the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttons
- go back to the door, turn key and keep it turned!
- open the door, move out and close it again behind you
- now it is the time to return the key again -> two green lights should go on
go to T24/1 (LPTPC area):
- use (black) key from interlock
- go into T24/1 area, close door, use black key in keyhole next to door -> big red light on
- push the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttons
- go back to the door, turn key and keep it turned!
- open the door, move out and close it again behind you
- now it is the time to return the key again -> two green lights should go on
power bending magnets:
- choose beam energy according to list sticked to monitor
get beam:
- phone Control Room 3500
- tell them to put the wire into DesyII at the position written in their lock book
open shutter:
- go back to hut
- put back the red and black keys into the interlock
- turn all four keys -> 5 green lights should be on next to each pair of keys
- open shutter T24 with the button "Beam Shutter auf" -> bottom green light next to the keys should go out
- open shutter T24/1 with the button "Beam Shutter auf" -> bottom green light next to the keys should go out
- now you should see beam
-> start data taking
|
Tue Nov 3 11:18:46 2009, Stephan Hänsel, Setup, Beam Off
|
close shutter:
- close shutter T24/1 with the button "Beam Shutter zu" (green) -> bottom green light next to the keys should go on
- close shutter T24 with the button "Beam Shutter auf" (green) -> bottom green light next to the keys should go on
- turn all four keys -> (the top) 4 green lights should go out next to each pair of keys
go to T24/1 (LPTPC area):
- just open the door -> the two green and the big red lights go out
If you do not need the test beam any more:
- open door at test beam area T24 -> the two green and the big red lights go out
- call Control Room 3500
- switch off bending magnets
|