Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC, Page 2 of 2  Not logged in ELOG logo
ID Date Author Typeup Subject
  30   Fri Nov 27 12:22:19 2009 Stephan HänselMeasurementsRun 20075 - Micromegas 817

46196 events (usable: 42433 events)

with 2 Micromegas modules (TPCDAQ stopped at 46195 events)

Beam: 5,6 GeV

silicon sledge 35cm inside from TPC-support-front and 36mm above center position

  • -> front Z: 5mm too far inside the gap
  • -> back Z: 5mm too far outside the gap

rate: 4,1 Hz

HV: 200V -> 1,2µA

LV:

  • 01,30 / 02,60   //   01.30 / 02.60
  • 0,632 / 1,739   //   0,622 / 1,752

 

 

 

  31   Fri Nov 27 12:23:25 2009 Stephan HänselMeasurementsRun 20077 - Pedestal

16196 events

with 2 Micromegas modules

Beam: 5,6 GeV

silicon sledge 35cm inside from TPC-support-front and 36mm above center position

  • -> front Z: 5mm too far inside the gap
  • -> back Z: 5mm too far outside the gap

 

HV: 200V -> 1,2µA

LV:

  • 01,30 / 02,60   //   01.30 / 02.60
  • 0,632 / 1,739   //   0,622 / 1,752

 

 

 

  1   Wed Oct 1 11:42:44 2008 stephan hänselSetupModulkomponenten

MODULE 0

1 Sensor Module (SiLC01):

   Hybrid: TEC_6D.2.1 / 30216662133923

   Sensor: HPK-ILC-6684-01

2 Sensor Module (SiLC02):

   Hybrid: TEC_6D.2.1 / 30216662133993

   Sensor Near: HPK-ILC-6684-19

   Sensor Far: HPK-ILC-6684-05

 

 

MODULE 1

1 Sensor Module (SiLC11b):

   Hybrid: TEC_6D.2.1 / 30216662133904

   Sensor: HPK-ILC-6684-23

2 Sensor Module (SiLC12):

   Hybrid: TEC_6D.2.1 / 30216661605173

   Sensor Near: HPK-ILC-6684-34

   Sensor Far: HPK-ILC-6684-27

 

(OLD - 1 Sensor Module (SiLC11):

   Hybrid: TEC_6D.2.1 / 30216662133922

   Sensor: HPK-ILC-6684-23)

 

  4   Fri Feb 27 14:03:53 2009 Stephan HänselSetupSetup 3D
  5   Thu Oct 22 08:02:26 2009 Stephan HänselSetupElectronics

HV-Kapton-PIN-assignment

  

CCUM-to-Module Adapter-Cards

CCUM-to-Module Adapter-Cards Pin-assignment (xls)

  

schematic of the adopted readout (A.Dierlamm)

 

TEC-R2-Hybrid

  6   Thu Oct 22 08:04:51 2009 Stephan HänselSetupgeometry - silicon envelope

distance si-sledge-front to silicon-Z-center = 23 cm

-> silicon sledge front 35 cm inside from front of TPC-support at a beam position 58 cm from front of TPC-support


CCU119 = 0x77

  • position 7 = I2C16 = SiLC12 -> front X
  • position 1 = I2C17 = SiLC11 -> front Z

CCU123 = 0x7b

  • position 7 = I2C16 = SiLC01 -> back Z
  • position 1 = I2C17 = SiLC02 -> back X
  7   Thu Oct 22 11:18:34 2009 Stephan HänselSetupPictures

Photo Gallery

zusätliche Photos:

labeled SiLC in front of TPC

  12   Mon Nov 2 13:22:50 2009 Stephan HänselSetupDAQ

start data-taking:

ssh xxx@bastion.desy.de -X

ssh xdaq@flctpcikhero1.desy.de -X

-

at PC reboot:

  • source xdaq_profile
  • cd scripts
  • ./fedpmc 0  + ctrl C when ready    //initialise the first FED
  • ./fedpmc 1  + ctrl C when ready    //initialise the second FED
  • ./gatecalib     //sets adresses for the TSC + gate
  • ./setdll 3 5     //sets width of the gate

when controllring newly connected

  • source xdaq_profile (if not done before)
  • cd scripts
  • ./ProgramTest.exe -pci -reset     //-> controllring 0x4c90

test of devices:

  • source xdaq_profile (if not done before)
  • cd scripts
  • ./ProgramTest.exe -pci -scanCCU     // searches for CCUs
  • ./ProgramTest.exe -pci -scantrackerdevice     // searches for CCUs and APVs

start xdaq:

  • source xdaq_profile (if not done before)
  • /opt/firefox/firefox & -> http://ikhero2.desy.de:40000     // not working for now
  • ./xdaq.sh -p40000
  • reload firefox

HyperDAQ:

  • -> Control Panel -> Configure Cluster -> load /home/xdaq/xml/peak_silc.xml
    • tick: Configure Cluster
    • -> submit
  • -> view Applications -> Tracker Supervisor:
    • choose run type -> normal
    • tick: TLU in physics Run
    • type spillsize = 20
    • tick: No gate

if xdaq kills itself:

  • rm /tmp/TLUspill.txt

 

 analysis:

  • root:
    • in /Analysis/AC1Analysis-1.4>
    • .L runAna_silc.C
    • runAna(pedestalnumber,runnumber)

get file with number of single events in all 4 sensors + HitProfile

  • root
    • .L readClusterTree_silc.cxx++
    • readClusterTree_silc(event number)

 

 

 

 

 

 

 

 

  13   Mon Nov 2 13:59:09 2009 Stephan HänselSetupToDo before data-taking

in hut:

  • plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you look from the back of the PC))
  • power on CCUM in spacing behind electronic hut
  • switch on opto-electrical converter for FED (on top of PC (switch in the back) and switch on power supply (front))
  • LV on -> 01,30 and 02,60 (two times)
  • HV on -> 200V

T24/1

  • power the scintillators for triggering
  • move envelope into beamline - sledge front to sensor center is 220,5mm

-> switch on the beam

  14   Tue Nov 3 10:45:01 2009 Stephan HänselSetupBeam On

clear test beam areas:

go to T24 (front area):

  • use (red) key from interlock
  • go into T24 area, close door, use red key in keyhole next to door -> big red light on
  • push the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttons
  • go back to the door, turn key and keep it turned!
    • open the door, move out and close it again behind you
  • now it is the time to return the key again -> two green lights should go on

go to T24/1 (LPTPC area):

  • use (black) key from interlock
  • go into T24/1 area, close door, use black key in keyhole next to door -> big red light on
  • push the white buttons "Absuche" below the three red "Not Aus" (emergency stop) buttons
  • go back to the door, turn key and keep it turned!
    • open the door, move out and close it again behind you
  • now it is the time to return the key again -> two green lights should go on

power bending magnets:

  • choose beam energy according to list sticked to monitor

get beam:

  • phone Control Room 3500
  • tell them to put the wire into DesyII at the position written in their lock book

open shutter:

  • go back to hut
  • put back the red and black keys into the interlock
  • turn all four keys -> 5 green lights should be on next to each pair of keys
  • open shutter T24 with the button "Beam  Shutter auf" -> bottom green light next to the keys should go out
  • open shutter T24/1 with the button "Beam  Shutter auf" -> bottom green light next to the keys should go out
  • now you should see beam

 -> start data taking

 

 

 

 

 

 

  15   Tue Nov 3 11:18:46 2009 Stephan HänselSetupBeam Off

close shutter:

  • close shutter T24/1 with the button "Beam  Shutter zu" (green) -> bottom green light next to the keys should go on
  • close shutter T24 with the button "Beam  Shutter auf" (green) -> bottom green light next to the keys should go on
  • turn all four keys -> (the top) 4 green lights should go out next to each pair of keys

go to T24/1 (LPTPC area):

  • just open the door -> the two green and the big red lights go out

If you do not need the test beam any more:

  • open door at test beam area T24 -> the two green and the big red lights go out
  • call Control Room 3500
  • switch off bending magnets

ELOG V3.1.5-fc6679b