Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
testbeam-rd50-desy-Oct2024
testbeam-RD50-DESY-Apr2024
testbeam-RD50-DESY-Jul2023
testbeam-RD50-CERN-Oct2022
testbeam-DESY-Oct2017
testbeam-DESY-April2017
testbeam-SPS2015
testbeam-SPS2014
testbeam-DESY14
testbeam-SPS12
testbeam-SPS11
testbeam-SPS10
testbeam-SPS09
testbeam-SPS08
LP-TPC
Silicon Envelope for the Large Protoype TPC, Page 1 of 2
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Measurements
Setup
31 Entries
Goto page 1,
2
Next
All
ID
Date
Author
Type
Subject
Text
6
Thu Oct 22 08:04:51 2009
Stephan Hänsel
Setup
geometry - silicon envelope
distance si-sledge-front to silicon-Z-center
= 23 cm
-> silicon sledge front 35 cm
13
Mon Nov 2 13:59:09 2009
Stephan Hänsel
Setup
ToDo before data-taking
in hut:
plug twisted pair cable
from CCUM into PC (Attention - connector
4
Fri Feb 27 14:03:53 2009
Stephan Hänsel
Setup
Setup 3D
2
Wed Feb 25 09:57:15 2009
Stephan Hänsel
Measurements
Sensor IV-Kurven + CV-Messungen (vor Modulbau)
31
Fri Nov 27 12:23:25 2009
Stephan Hänsel
Measurements
Run 20077 - Pedestal
16196 events
with 2 Micromegas modules
Beam: 5,6 GeV
30
Fri Nov 27 12:22:19 2009
Stephan Hänsel
Measurements
Run 20075 - Micromegas 817
46196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ
stopped at 46195 events)
29
Fri Nov 27 12:21:00 2009
Stephan Hänsel
Measurements
Run 20074 - Micromegas 816
10010 events
with 2 Micromegas modules (TPCDAQ
stopped at 10003 events)
28
Thu Nov 5 19:46:15 2009
Stephan Hänsel
Measurements
Run 20073 - Micromegas 815
10070 events
with 2 Micromegas modules (TPCDAQ
stopped at 9864 events)
27
Thu Nov 5 19:44:28 2009
Stephan Hänsel
Measurements
Run 20070 - positionrun
2257 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
26
Thu Nov 5 19:36:48 2009
Stephan Hänsel
Measurements
Run 20069 - pedestal
13600 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
25
Thu Nov 5 19:34:58 2009
Stephan Hänsel
Measurements
Run 20065 - pedestal
18400 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
24
Thu Nov 5 19:33:53 2009
Stephan Hänsel
Measurements
Run 20064 - pedestal
12199 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
23
Wed Nov 4 18:24:48 2009
Stephan Hänsel
Measurements
Run 20063 - Micromegas #808
crashed at 18577 events - TPC 19220 events
Beam: 5,6 GeV
one Micromegas module in center position
22
Wed Nov 4 18:19:44 2009
Stephan Hänsel
Measurements
Run 20062 - data
6493 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
21
Wed Nov 4 17:12:47 2009
Stephan Hänsel
Measurements
Run 20061 - Latency Scan -> 70
LATENCY IS SET TO 70
spillsize = 500
20
Wed Nov 4 16:31:42 2009
Stephan Hänsel
Measurements
Run 20059 - Micromegas #807
crashed at 3648 events -> TPC got much
more events
Beam: 5,6 GeV
19
Wed Nov 4 16:12:33 2009
Stephan Hänsel
Measurements
Run 20057 - Micromegas #806
1076 events
trigger rate 7,25Hz
bx = real trigger number
18
Wed Nov 4 16:10:24 2009
Stephan Hänsel
Measurements
Run 20056 - Micromegas #805
10989 events
HV: 200V -> 2µA
LV:
16
Wed Nov 4 15:29:00 2009
Stephan Hänsel
Measurements
Run 20055 - Pedestal
17
Wed Nov 4 15:31:39 2009
Stephan Hänsel
Measurements
Run 20055 - Pedestal
15399 triggers
HV: 200V -> 2µA
LV:
Goto page 1,
2
Next
All
ELOG V3.1.5-fc6679b